Menu

Close

Here's the text.

Izukyu Azamino 4-chome district building agreement

Last Updated April 6, 2023

Image of the district where prior consultation is requested
Prior consultation request district (including building agreement area)

Preliminary consultation request district

Sites excluded from prior consultation request areas

  • Prior consultation request If there is a building plan on the site in the area, please contact the Steering Committee in advance.
  • For contact information of the Steering Committee, please contact the Aoba Ward Community Rules Consultation Center (in Aoba Ward Ward Administration Promotion Division: 045-978-2217).
  • Please note that for adjacent land, we may join a building agreement in the future.
  • What is "Private Consultation Request Area"?
  • Authorized Building Agreement Area Map (PDF: 304KB)
    Detailed map of the building agreement area and adjacent land (land for those who do not agree with the agreement)
  • Building agreement (PDF: 606KB)
    ※Due to the revision of the Building Standards Law, there has been a gap in the provisions described in the agreement. For detailsArticles of the Building Standards Law relating to restrictions on building agreementsPlease take a look at it.
    ※Please be sure to check with each steering committee regarding the handling of agreement standards.
  • Overview of Restrictions (Excerpt from Agreement)
    (Standards for Buildings)
    Article 8 Sites, locations, uses, forms, and building equipment of buildings in the agreement area specified in the preceding Article must be based on the standards set forth in the following items.
    (1) Use shall be a single-family private house (Note 1: 2: living together House) or a clinic (excluding veterinary clinic) combined house.
    (2) The height of the building shall not exceed 9 meters from the ground surface and the height of the eaves shall not exceed 6.5 meters.
    (3) The site cannot be divided.
    (4) The ground surface (at the time of public notice of agreement approval) shall not be changed. (Note 2)
    (5) The distance from the adjacent land boundary to the outer wall of the building or the surface of the pillar in place of this shall be at least 1 meter. However, Article 135-5 of the Building Standards Law Enforcement Order ※This shall not apply to the case where the contents are set forth in.
    (6) The number of floors excluding the basement shall be 2 or less.
    (7) The toilet will be flushed.
    ※Due to the revision of the Building Standards Law, there has been a gap in the provisions described in the agreement. For detailsArticles of the Building Standards Law relating to restrictions on building agreementsPlease take a look at it.
    Note 1: Interpretation of "2 Households living together House" in Article 8, Item 1 of the Agreement
    “2-family living together housing” is a single-family house (including a clinic combined housing). Excludes veterinary clinics. ), Which means that two households can live independently but have shared entrances.
    Note 2: Interpretation of "Change of ground surface" in Article 8, Item 4 of this Agreement
    The garage with cuts shall be built.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Aoba Ward Counseling Center (Ward Administration Promotion Division, Aoba Ward)

Telephone: 045-978-2217

Telephone: 045-978-2217

Fax: 045-978-2410

Email address: ao-machirule@city.yokohama.jp

Return to the previous page

Page ID: 833-094-687

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews