Menu

Close

Here's the text.

Azamino District (No. 3) Building Agreement

Last update date April 6, 2023

Image of prior consultation request district
Pre-consultation request district (including building agreement area)

Prior consultation request district

Sites excluded from prior consultation request area


  • If you have a building plan on the site in the prior consultation request area, please contact the Steering Committee in advance.
  • For contact information of the Steering Committee, please contact the Aoba Ward Town Rules Consultation Center (Aoba Ward Ward Administration Promotion Division: 045-978-2217).
  • Please note that you may subscribe to a building agreement in the future.
  • What is the "prior consultation request district"?
  • Authorized Building Agreement Area Map (PDF: 605KB)
    Detailed map of the building agreement area and adjacent land (land of those who do not agree to the agreement)
  • Building Agreement (PDF: 278KB)
    ※Due to the revision of the Building Standards Law, there is a gap in the provisions described in the agreement. For more information.Articles of the Building Standards Law Concerning Restrictions on Building AgreementsPlease take a look at it.
    ※Please be sure to check with each Steering Committee for handling the criteria of the agreement.
  • Outline of limitations (excerpts of agreement)
    (Standards for Buildings)
    Article 8 The site, position, structure, use, form, design or building equipment of a building in the agreement area specified in the preceding Article shall be based on the standards specified in the following items.
    (1) The building shall be a single-family private residence or combined with a clinic (excluding veterinary clinic).
    (2) The height of the building shall be 9 meters from the ground surface, and the height of the eaves shall not exceed 6.5 meters.
    (3) The site shall not be split.
    (4) The ground surface (when residential land development is completed) cannot be changed.
    (5) The distance between the adjacent land boundary line and the outer wall of the building or the surface of the pillar in place of this shall be 1 meter or more. Provided, however, that Article 135-5 of the Building Standards Law Enforcement Order ※This does not apply to cases where the contents set forth in the above are applicable.
    (6) The number of floors excluding the basement shall be 2 or less.
    (7) The toilet to be installed must be flushed.
    ※Due to the revision of the Building Standards Law, there is a gap in the provisions described in the agreement. For more information.Articles of the Building Standards Law Concerning Restrictions on Building AgreementsPlease take a look at it.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Aoba Ward Town Rules Consultation Center (Ward Administration Promotion Division, Aoba Ward)

Phone: 045-978-2217

Phone: 045-978-2217

Fax: 045-978-2410

Email address: ao-machirule@city.yokohama.jp

Return to the previous page

Page ID: 436-402-968

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews