Menu

Close

Here's the text.

Onda Motoishikawa Line (Intetsu)

Last update date April 1, 2024

The city planning road Onda Motoishikawa Line is a city planning road with a length of about 5,860m starting from Sumiyoshidai, Aoba-ku and ending at Motoishikawacho in the same ward.
Of these, we will start a road maintenance business for the section of the fir tree stand from Kuroganecho.

Business Overview
Business DistrictsOnda Motoishikawa Line (Intetsu)
SectionTetsumachi, Aoba-ku Mominokidai
Fiscal yearFY2021/12
ScaleExtended 1,240m, width 22m, 2 lanes
Improvement effect

◆Strengthening the network of arterial roads in Aoba Ward
By strengthening the arterial road network, we aim to facilitate mobile road exchange.
◆Securing pedestrian space
We secure pedestrian space by maintenance of wide sidewalk and plan pedestrian safety.
◆Strengthening the function of emergency transport routes in the event of a disaster
We will strengthen the functions of emergency transport routes that carry supplies and personnel, which are necessary for emergency response activities in the event of a disaster.
◆Improvement of access to regional bases
We will improve accessibility to regional bases such as the new subway station on Subway Line 3 (Blue Line), which is scheduled near Mt.

Business Progress Rate※

2% (expected at end of FY2023)

Land acquisition rate※

30% (expected at the end of FY2023)

Current construction
Contract details
※No construction is currently under contract.
Related information

◆You can look at administrative map information such as city planning from Yokohama-shi administration map reporting system (outside site).
◆Business Overview (PDF: 1,416KB)

Presentation materials

◆Briefing on road design and site compensation accompanying the acquisition of business approval
(June 29, 2022, July 2, 2022)
※The contents of the explanation are the same on both days.
Presentation materials (PDF: 3,977KB)
Summary of proceedings (PDF: 215KB)

※Business progress rate is shown as the execution rate of total project cost.
※The land acquisition rate indicates the ratio of the acquired area among the areas where the business has been approved.

■Business Locations


Guide map


Location map

■Photographs of current status

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 297-420-389

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews