Menu

Close

Here's the text.

Kamariya Line (Teramae District)

Last update date April 1, 2024

The city planning road Mukaigame Kamariya Line is a main road in the district with a length of about 4.2 km, starting from Seto, Kanazawa-ku and ending at Kamariya-cho in the same ward.
Of these, we are promoting road maintenance projects for the sections of Teramae 1-chome and 2-chome.

Business Overview
Business DistrictsMudgame Kamariya Line (Teramae)
SectionTeramae 2-chome, Kanazawa-ku (in front of Bunko Elementary School) - Teramae 1-chome (former Route 1)
Fiscal yearFY2018 through FY2006
ScaleExtended 530m Standard width 15m (2 lanes, sidewalk on both sides)
Improvement effect

◆Ensuring school road safety and facilitating vehicle traffic
If this route is developed, access to the coastal areas of Route 1 and Kanazawa will be improved, resulting in a decrease in the inflow of passing traffic into residential roads, and securing sidewalks will greatly improve the safety environment of school roads to schools.
◆Formation of fire spread zone
Houses are densely packed along this route, and as an area where there is a high risk of fire spread in the event of an earthquake fire, it is positioned as the "Earthquake Fire Countermeasures Policy in the Yokohama City Earthquake Disaster Prevention Strategy (March 2014) area.
Through this project, a fire spread zone will be formed, and the damage caused by fire can be expected to be reduced.

Business Progress Rate※64% (expected at the end of FY2023)
Land acquisition rate※

67% (expected at the end of FY2023)

Current construction
Contract details
※No construction is currently under contract.
Related information◆You can look at administrative map information such as city planning from Yokohama-shi administration map reporting system (outside site).
Materials

Business Overview (PDF: 4,151KB)

Presentation materials

◆1st Briefing session (June 30, July 3, July 5, 2018)
◆2nd Briefing Session (December 19 and 22, 2018)
Document (PDF: 1,518KB)
Minutes (PDF: 733KB)

※Business progress rate is shown as the execution rate of total project cost.
※The land acquisition rate indicates the ratio of the acquired area among the areas where the business has been approved.


Aerial photograph

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 344-441-308

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews