Daejeon Kanagawa Line (Baba District)

Last update date April 1, 2022

The Ota Kanagawa Line, a city planning road, is a city planning road with a length of about 7.0 km, starting from the Kawasaki city area of Komaoka-cho, Tsurumi-ku, and is a main road connecting the coastal area and the inland area of the city.
Of these, the Baba district is connected to the Babadashi entrance of the Yokohama Ring Road Yokohama North Line, and by maintaining this section, ensuring smooth traffic, alleviate traffic congestion at Horyu-ji Temple intersection and Uchiji intersection, and improve pedestrian safety. .

Business Overview
Business DistrictsDaejeon Kanagawa Line (Baba District)
SectionKamimiya 1-chome, Tsurumi-ku to Nishiterao 1-chome Nishiterao, Kanagawa-ku
Fiscal yearFY13 to FY2003
ScaleApprox. 955m, standard width 20-26m (4 lanes)
Improvement effect◆Smooth traffic
By widening the roadway to four lanes, traffic congestion around the intersection will be eased and traffic will be smooth.
◆Improvement of pedestrian safety and comfort
Pedestrians and bicycles can pass safely and comfortably by maintaining sidewalks on both sides of the roadway in line with road widening.
Business Progress Rate※99% (expected at the end of FY2021)
Land acquisition rate※

100% (expected at the end of FY2021)

Current construction
Contract details

No construction is currently under contract.

Construction briefing session

◆July 7, 14, 15th, 2016
Urban planning road Ota Kanagawa Line (Baba district) street maintenance work for a part of Nishiterao 1-chome, Kanagawa-ku, Baba 1, 2, 7-chome and Higashi Terao 1-chome, Tsurumi-ku adjacent to construction A briefing session was held on the construction plan of (Part 14). In addition, he explained the connection plan with the surrounding living road associated with the Ota Kanagawa Line maintenance between the bus stop and the Uchiji intersection.
Construction briefing materials (PDF: 4,896KB)
Explanation materials for connection plans with peripheral connection plans (PDF: 4,784KB)
※Regarding the connection plan with the peripheral connection plan
Please refer to Road and Highway Bureau Yokohama ring road adjustment section (045-671-2780).
◆November 7 and 8, 2016
About construction plan of city planning road Ota Kanagawa Line (Baba district) street maintenance work (Part 13) for a part of Baba 1-chome, Tsurumi-ku and a part of Nishiterao, Kanagawa-ku adjacent to construction A briefing session was held.
Construction briefing materials (PDF: 11,626KB)

Related information

◆You can look at administrative map information such as city planning from "Yokohama-shi administration map reporting system" (outside site).

※Business progress rate is shown as the execution rate of total project cost.
※The land acquisition rate indicates the ratio of the acquired area among the areas where the business has been approved.
■Business segments

Business Plan
Business segments

■Photographs of current status

1, Baba, Tsurumi-ku
Photo 3 (Baba 1-chome, Tsurumi-ku)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 788-502-276

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews