Menu

Close

Here's the text.

Yamashita Nagatsuta Line (Kamoi area)

Last Updated November 1, 2024

The Yamashita Nagatsuta Line is a city planning road with a length of about 19.8 km, starting from Yamashita-cho, Naka-ku and ending at Tsuda-cho, Midori-ku. It is an important arterial road that contributes to improving traffic convenience in the western part of the city. The Kamoi area has been operating since fiscal 1994 in a section of approximately 1,510m in length from 1-chome Hakusan, Midori-ku to Kamoi-cho.
Approximately 750m on the west side (Shiroyama Works) was opened in March 2010.
Currently, on the east side (Kamoi Works), we are proceeding with design, surveying, and land acquisition.

Business Overview
Business districtYamashita-Nagatsuta Line (Kamoi)
Section1-chome, Hakusan, Midori-ku to Kamoi-cho
Fiscal year

FY1994-197

Scale

Approximately 1,510m in length
Standard width: 22m

Maintenance effect
  • Improvement of traffic convenience and enhancement of transportation functions
    • The development of the Kamoi area will strengthen the communication function between Midori Ward and Kanagawa Ward, facilitating traffic between regional bases along the JR Yokohama Line and the city center, and alleviating traffic congestion around Kamoi Station.
  • Optimizing traffic flow
    • To avoid traffic congestion on the Sugeta Road, which currently passes through Kamoi Station, the conversion of traffic into residential areas to the Yamashita-Nagatsuta Line will improve the safety of local roads and reduce traffic congestion on the Sugeta Road.
Business progress rate※

70% (end of FY2023)

Land acquisition rate※93% (end of FY2023)
Notice

At the end of March 2010, about 750m of "west section" was opened.

Current construction
Contract details

◆Urban planning road Yamashita Nagatsuta Line (Kamoi area) Street maintenance work (Part 4)
 From 4-30-14 Kamoi, Midori-ku to 806-1 Kamoi-cho
 Contract date: March 27, 2024
 The other party to the contract: Shonan Construction Co., Ltd.

Related information

※The business progress rate is shown as the execution rate of total operating expenses.
※The land acquisition rate shows the ratio of the acquired area among the areas that have been approved for business.

Location map


Photographs
Shirokamo Tunnel (Nakayama side)Shirokamo Tunnel (Kamoi Station side)

Shirokamo Tunnel (Nakayama side)

Shirokamo Tunnel (Kamoi Station side)

View the Shirokamo Tunnel from the Kamoi Kamiida Line.From Sugeta Road to Kamoi Kamiida



You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Construction Division, Construction Department, Road and Highway Bureau Construction Department

Telephone: 045-671-3521

Telephone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 318-664-808

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews