Hodogaya Futamatagawa Line (Motoshuku District)

Last Updated November 1, 2024

The Hodogaya Futamatagawa Line is a city planning road with a length of about 3,580m, starting from Imai-cho, Hodogaya-ku, ending at Honmura-cho, Asahi-ku. Of these, the Motoshuku area is a section with a length of about 400m, and has been operating since 1991.

Business Overview
Business districtHodogaya Futamatagawa Line (Motoshuku District)
SectionHonjuku-cho, Asahi-ku
Fiscal yearFY2011 to FY2016
ScaleApproximately 400m in length Standard width 15m
Maintenance effect
  • Improvement of traffic convenience and enhancement of transportation functions
    • By widening the existing road where the width is small and the sidewalk is not sufficiently maintained, traffic functions such as ensuring the safety of pedestrians can be strengthened.
  • Optimizing traffic flow
    • By widening the existing road, the passing of route buses etc. will be smoother, and by installing a right-turn lane at intersections, traffic flow will be optimized.
Business progress rate※83% (end of FY2023)
Land acquisition rate※

97% (end of FY2023)

Current construction
Contract details

◆Urban planning road Hodogaya Futamatagawa Line (Motoshuku district) Street maintenance work (Part 6)
 Construction site: From 92-3 Honjuku-cho, Asahi-ku to 41-1 Minami-Honjuku-cho
 Contract date: November 7, 2023
 Construction period: Scheduled for February 2025
 The other party to the contract: Techno Japan Co., Ltd.
◆Urban planning road Hodogaya Futamatagawa Line (Motoshuku district) Street maintenance work (Part 7)
 Construction site: From 92-3 Honjuku-cho, Asahi-ku to 26-7 Minami-Honjuku-cho
 Contract date: May 17, 2024
 Construction period: Scheduled for November 2024
 The other party to the contract: Keihin Electric Construction Co., Ltd.

Related information

・You can look at administrative map information such as city planning from Yokohama-shi administrative map reporting system (outside site).
Business Overview (PDF: 2,153KB)

※The land acquisition rate shows the ratio of the acquired area among the areas that have been approved for business.
※The business progress rate is shown as the execution rate of total operating expenses.

Location map

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Construction Division, Construction Department, Road and Highway Bureau Construction Department

Telephone: 045-671-3521

Telephone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 882-843-485

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews