Menu

Close

Here's the text.

City Road Hirato No. 486 (Bessho district (Part 2))

Last update date April 1, 2024

City Road Hirato No. 486 is a road that starts at Shimonagaya 1-chome in Konan Ward and ends at Bessho 2-chome in Minami Ward. Of these, we are promoting a road widening project for the section from Bessho-cho "Koban" (police box) to the vicinity of Bessho IC. In order to improve the safety of the school road at Bessho Elementary School, we will actively promote the maintenance so that the business effect can be obtained in about five years.

Business Overview
Business DistrictsCity Road Hirato Route 486 (Bessho district (Besshochiku) (Part 2))
SectionBessho 3-chome to Bessho 5-chome, Minami-ku
Fiscal yearFY29 to FY10
ScaleAbout 520m in length
Width 11m to 15m
(11m sidewalk 2m x 2, driveway 7m2 lane)
(15m sidewalk 3m x 2, driveway 9m2 lane)
Improvement effect
  • Ensuring school road safety and facilitating vehicle traffic
    • A part of the existing road is designated as a school road at Bessho Elementary School, but there is no separation between the sidewalk and the roadway, and the width is as narrow as about 7 meters.
    • In addition, it is a section where bus traffic is extremely large in the city.
    • Through this project, we aim to ensure the safety of school roads and facilitate vehicle traffic.
  • Formation of fire spread zone
    • Houses are densely populated along this line, and as an area where there is a high risk of fire spread in the event of an earthquake or fire, it is positioned as a target area under the "Earthquake Fire Countermeasures Policy in the Yokohama City Earthquake Disaster Prevention Strategy (March 2014)" .
    • Through this project, a fire spread zone will be formed, and the damage caused by fire can be expected to be reduced.
Business Progress Rate33% (expected at the end of FY2023)
Land acquisition rate36% (expected at the end of FY2023)
Current construction
Contract details
No construction is currently under contract.
Related information

※The land acquisition rate indicates the ratio of the acquired area among the areas where the business has been approved.
※Business progress rate is shown as the execution rate of total project cost.

Location map

Photographs of current status
Photo 1Photo 2

(November 2022)


(November 2021)



In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 442-941-627

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews