Shiomidai Hirado Line (Ooka District)

Last update date November 1, 2023

Shiomidai Hirado Line is a city planning road with a length of about 7.2 km, starting from Isogo Ward-no-Mori 4-chome and ending at Hiratocho, Totsuka Ward. Of these, we will start a road widening project for the section from the vicinity of Manpukuji to the vicinity of the Ooka Fire Branch Office. In order to improve the safety of Fujinogi Elementary School's school roads, we plan to actively promote the development so that the business effect can be obtained in about seven years.

Business Overview
Business DistrictsShiomidai Hirado Line (Ooka District)
SectionOoka 3-chome, Minami-ku
Fiscal yearFrom November 27, 2018 to March 31, 2025
ScaleApproximately 320m long, 15m wide (sidewalk 3m x 2, road 9m2 lane)
Improvement effect
  • Ensuring school road safety and facilitating vehicle traffic

A part of the existing road is designated as a school road at Fujinogi Elementary School, but there is no separation between the sidewalk and the roadway, and the width is as narrow as about 7 meters.
In addition, it is a section where bus traffic is extremely large in the city.
Through this project, we aim to ensure the safety of school roads and facilitate vehicle traffic.

  • Formation of fire spread zone

Houses are densely populated along this line, and as an area where there is a high risk of fire spread in the event of an earthquake or fire, it is positioned as a target area under the "Earthquake Fire Countermeasures Policy in the Yokohama City Earthquake Disaster Prevention Strategy (March 2014)" .
Through this project, a fire spread zone will be formed, and the damage caused by fire can be expected to be reduced.

Business Progress Rate

60% (expected at the end of FY2022)

Land acquisition rate34% (expected at the end of FY2022)
Current construction

◆FY2021 Urban Planning Road Shiomidai Hirato Line (Ooka District) Street Improvement
 Construction site: From 3-33-10, Ooka, Minami-ku to Ooka 4-chome 7-14 Ooka
 Contract date: February 25, 2022
 Contract partner: Tomoki Civil Engineering Co., Ltd.

Related information

About business start of business of Ooka district (September, 2017) (PDF: 775KB)
◆Survey briefing session (October 24, 28, 30, 2017)
Survey briefing materials (PDF: 2,646KB), proceedings summary (PDF: 189KB)
◆Briefing on road design and site compensation accompanying business approval (December 6, 8, 2018)
Design and Site briefing materials (PDF: 1,823KB), agenda item (PDF: 267KB)


Location map

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 207-646-331

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews