Shin-Yokohama Station Area Road Specific Business Plan Text Version
Last Updated June 19, 2020
Road identification project plan for the area around Shin-Yokohama Station in Yokohama City (established in September 2006)
Contents
1.First of all,
2.System of Traffic Barrier-Free Law
3.Routes for priority maintenance areas and barrier-free
4.What is a road-specific business plan?
5.Maintenance Policy
6.Maintenance Plan
(1)Business plan for individual routes
(2)Target routes of road identification business plan
(3)Other Initiatives
7.Promotion of Road Specific Business Plan
In November 2000, the Law Concerning the Promotion of Smooth Movement Using Public Transportation for Elderly and Physically Disabled Persons (commonly known as the Traffic Barrier-Free Law) came into effect.
In response to this, Yokohama City is developing basic concepts in areas around major stations in central Tokyo and Fukutoshin. Therefore, in August 2006, we formulated the “Shin-Yokohama Station Area Traffic Barrier-Free Basic Concept” for the area around Shin-Yokohama Station, which is positioned as the “Shin-Yokohama City Center”.
To realize this basic concept, Road and Highway Bureau has formulated a Road Specific Business Plan, which defines the content of the project and the planned implementation period. In the future, we will implement road projects based on this plan.
The Traffic Barrier-Free Law aims to reduce the burden on the physical burden associated with transportation using public transportation such as the elderly and the physically handicapped, and to improve the convenience and safety of transportation. We promote barrier-free by two major pillars of "barrier-free" and "barrier-free priority maintenance district".
In order to promote one of the pillars, "barrier-free priority maintenance districts", each district consisting of citizens such as academics, elderly people, persons with disabilities, related businesses and administrative organizations. After repeated examinations in the subcommittee, the "Traffic Barrier-Free Basic Concept" was formulated.
Based on the "Road Specific Business Plan" formulated in line with this basic design, we will carry out the business by 2010.
"Specific routes" and "Semi-specific route" are defined in the "Yokohama Station Area Traffic Barrier-Free Basic Concept" formulated in August 2006.
The priority maintenance area is a district where major facilities such as public facilities and welfare facilities are located within a range of approximately 500m (walking area) centered on passenger facilities such as railway stations where there are considerable numbers of users. This is an area where barrier-free will be implemented in an integrated manner.
The priority maintenance area around Shin-Yokohama Station is the area centered on JR and Municipal Subway Shin-Yokohama Station. On the northwest side of the station, Nissan Stadium and welfare and medical facilities (Yokohama City Rehabilitation Center, Sports Center for the Disabled, Yokohama Rapport, Yokohama Rapport, Yokohama City General Health and Medical Center, Yokohama Rosai Hospital) On the northeast side of the station, Yokohama Arena, Yokohama Kohoku Region Joint Government building, Shinyokohama area activity platform are located, and the area including these is set as area of important maintenance district in area around Shin-Yokohama Station.
There are two types of barrier-free routes: specific routes and semi-specific routes.
- As a general rule, a specific route is a route that carries out maintenance along the standards based on the Traffic Barrier-Free Law by 2010 or at this stage, maintenance based on the Yokohama City Welfare Town Development Ordinance is maintained, It is a route that does not particularly hinder smooth movement of people with disabilities.
- A semi-specific route is a route that works on maintenance for barrier-free issues identified in the examination of the basic concept, etc., in the future, taking into account the opportunities for repair.
The Traffic Barrier-Free Law aims to reduce the burden on the physical burden associated with transportation using public transportation such as the elderly and the physically handicapped, and to improve the convenience and safety of transportation. We promote barrier-free by two major pillars of "barrier-free" and "barrier-free priority maintenance district".
"Road specific business plan" means "section of road" where road manager carries out road identification business in line with basic design in important point maintenance district established in basic design, road which should be carried out every section We establish "contents and planned conduct period" of specific business and "important matter to be considered" when carrying out other road specific business.
(1) Target year
About "specific route" and "part of semi-specific route", maintenance will be carried out by 2010.
(2) Maintenance level setting
In order to achieve barrier-free priority and integrated manner by 2010, we will implement maintenance for barrier-free through partial renovation, etc., taking into account regional characteristics and surrounding roadside conditions.
In addition, in order to carry out effective maintenance, we plan cooperation and coordination with other businesses, and determine the maintenance level in consideration of the continuity of walking space.
(3) Main maintenance standards for road movement facilitation maintenance
We carry out maintenance based on "road movement facilitation maintenance guidelines" and "Yokohama road barrier-free maintenance guidelines" (Yokohama-shi)".
The main maintenance standards are "the effective width of the sidewalk should be 2m or more", "paving materials should be flat, non-slip, and well drained (permeable pavement, etc.)", "The vertical slope of the sidewalk shall be 1% or less", "In principle, a flat part is provided at the connection of the pedestrian crossing", and "a sidewalk connecting to the pedestrian crossing is 2.
We show plan as follows about route to carry out business to plan barrier-free mainly integrally and integrally. In addition, in order to make the plan more effective, the plan may be reviewed due to coordination with other companies or budgets.
In the area around Shin-Yokohama Station, the following 12 routes to carry out road identification projects.
Route name | (1)-1 Loop Line 2 (City Road Loop Line 2 No. 1307) |
---|---|
Business segments | In front of Kanagawa Tax Office, Futoo Shindo |
Line extension | 390 meters |
Projected year | 2006 |
Maintenance Policy | The width of the sidewalk is wide and generally flat and easy to walk. Therefore, in line with the maintenance of the electric wire common ditch, such as renovation of "paving materials" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Complete renovation 390m About block for guiding visually impaired person Continuous laying and repair of route guidance 365m Intersections, etc. 7 locations 2 locations where information signs are installed 7 locations for car stoppages |
Matters to be considered | Development and coordination of electric wire joint ditch |
Route name | (1)-2 Loop Line 2 (City Road Ring 2 No. 1307) |
---|---|
Business segments | From Futoo Shindo to the Arata Miyauchi Yokohama Line |
Line extension | 580 meters |
Projected year | 2007 |
Maintenance Policy | The width of the sidewalk is wide and generally flat and easy to walk. Therefore, renovation of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Complete renovation 40m 5 locations for steps and gradients About block for guiding visually impaired person Continuous laying of route guidance 510m Intersections, etc. 2 new construction sites and 10 renovations 1 location of information sign 7 locations for car stoppages |
Matters to be considered | Coordinated with the Shin-Yokohama North Exit Area Comprehensive Redevelopment Project (Installing blocks for guiding visually impaired people around the pedestrian deck, etc.) |
Route name | (2)In front of the City General Health and Medical Center (City Road Koki No. 70) |
---|---|
Business segments | From Hamatoribashi Bridge to City General Health and Medical Center |
Line extension | 170 meters |
Projected year | 2007 |
Maintenance Policy | It is a sidewalk that leads to the City General Health and Medical Center and the City General Rehabilitation Center, with an effective width secured and is a sidewalk that is generally flat and easy to walk. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Renovation of steps and gradients 2 locations About block for guiding visually impaired person Continuous installation of route guidance 80m Intersections, etc. 2 locations |
Matters to be considered | Cooperation between the City General Health and Medical Center and the City General Rehabilitation Center is required (Renovation of block blocks for guiding visually impaired persons on site) |
Route name | (3)In front of Yokohama Rosai Hospital (City Road Koki No. 70) |
---|---|
Business segments | From Hamatori Bridge to Sankaku Bridge |
Line extension | 200 meters |
Projected year | 2007 |
Maintenance Policy | It is an effective width and is generally flat and easy to walk. Therefore, the "crossing gradient" of the vehicle in Yokohama Rosai Hospital will be implemented. |
Maintenance contents | Renovation of crossing gradient 2 locations |
Matters to be considered | The cooperation of Yokohama Rosai Hospital is required (renovation of blocks for guiding visually impaired persons) |
Route name | (4)Arena Street (Kikuna No. 66, etc.) |
---|---|
Business segments | From Yokohama Arena to West Gate Hashimae -1 |
Line extension | 890 meters |
Projected year | FY2006 to FY2008 |
Maintenance Policy | The route to the Yokohama Arena and Nissan Stadium via the Arata Miyauchi Yokohama Line, and is a wide, generally flat and easy to walk. Therefore, renovation of "steps and gradients" and "longitudinal gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Renovation of steps and gradients 22 locations Renovation of longitudinal gradient About block for guiding visually impaired person Continuous installation of route guidance 630m Intersections, etc. 22 locations Refurbishment of vehicles 22 locations |
Matters to be considered | Implemented maintenance and adjustment of brick street |
Route name | (5)Brick Street (Kikuna No. 63, etc.) |
---|---|
Business segments | From Shin-Yokohama Station Square to Shin-Yokohama Ekimae Park |
Line extension | 350 meters |
Projected year | Fiscal 2007 to 2008 |
Maintenance Policy | The route to the Nissan Stadium area is wide and generally flat, and it is a sidewalk with "blocks for guiding the visually impaired" is laid continuously, but the steps and gradients with the private land are steep. Therefore, the route from Ring Route 2 to Shin-Yokohama Chuo-dori will be fully renovated, such as "steps and gradients" and "longitudinal gradients". |
Maintenance contents | Complete renovation 110m About block for guiding visually impaired person Continuous laying of route guidance 250m 5 parts of intersections, etc. 5 locations 4 locations for car stoppage |
Matters to be considered | Implemented maintenance and coordination of Arena Street |
Route name | (6)Stadium Street (Kikuna No. 137, etc.) |
---|---|
Business segments | From Route 2 to Hamatori Bridge |
Line extension | 350 meters |
Projected year | 2008 |
Maintenance Policy | This sidewalk leads to the Nissan Stadium area, with an effective width secured and is generally flat, and a sidewalk with "blocks for guiding the visually impaired" is laid continuously. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Improvement of sidewalk steps and gradients About block for guiding visually impaired person 5 parts of intersections, etc. 5 locations 5 locations for car stoppages |
Route name | (7)Futoo Shindo |
---|---|
Business segments | From Route 2 to Yokohama Kohoku Region Joint Government Building |
Line extension | 250 meters |
Projected year | 2008 |
Maintenance Policy | It is a sidewalk that leads to the Yokohama Kohoku Regional Joint Government Building, with an effective width secured and is a sidewalk that is generally flat and easy to walk. Therefore, appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | About block for guiding visually impaired person Intersections, etc. 6 locations |
Route name | (8)In front of Shinyokohama local activity home (city road Okurayama Route 229) |
---|---|
Business segments | From Futoo Shindo, Kohoku Sports Center |
Line extension | 300 meters |
Projected year | 2008 |
Maintenance Policy | It is a route to the Shinyokohama Community Activity Home and the Kohoku Sports Center, with an effective width secured and is a generally flat and easy to walk. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Improvement of sidewalk steps and gradients About block for guiding visually impaired person Continuous installation of route guidance 210m Intersections, etc. 4 locations 1 location of information sign |
Route name | (9)In front of Yokohama Arena (Kikuna No. 13) |
---|---|
Business segments | From Loop Route 2 to Shin-Yokohama Chuo-dori |
Line extension | 180 meters |
Projected year | 2009 |
Maintenance Policy | It is a wide, generally flat and easy to walk. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Renovation of steps and gradients of sidewalks 2 locations About block for guiding visually impaired person Continuous installation of route guidance 75m Intersections, etc. 4 locations |
Matters to be considered | Cooperation of Yokohama Arena is required (Laying blocks for guiding visually impaired persons on site, etc.) |
Route name | (10)Shin-Yokohama Chuo-dori (City Road Kikuna No. 317, etc.) |
---|---|
Business segments | From Futoo Shindo, west gate bridge front -2 |
Line extension | 1,240 meters |
Projected year | 2009 |
Maintenance Policy | This is a sub route from the Yokohama Arena to the Yokohama Kohoku Regional Joint Government Building, with an effective width secured and is a sidewalk that is generally flat and easy to walk. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Renovation of steps and rubbed gradients of sidewalks 11 About block for guiding visually impaired person Intersections, etc. 11 locations Refurbishment of vehicles 11 locations |
Route name | (11)West Gate Bridge -1 (Kikuna No. 146) |
---|---|
Business segments | From Arena Street to Shin-Yokohama Chuo-dori |
Line extension | 80 meters |
Projected year | 2010 |
Maintenance Policy | This is a sub-route from Arena Street to the Nissan Stadium via the West Gate Bridge. It is a narrow effective width (1.5m) but is generally flat and easy to walk. Therefore, repair of "steps and gradients" and appropriate laying and renovation of "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Improvement of sidewalk steps and gradients About block for guiding visually impaired person Intersections, etc. 4 locations |
Matters to be considered | In order to secure an effective width of the sidewalk (2m) of the sidewalk, it is necessary to consider maintenance by taking the opportunity (removal of planting belt (W = 0.8m), etc.) |
Route name | (12)West Gate Bridge -2 (Kikuna No. 147, etc.) |
---|---|
Business segments | From Shin-Yokohama Chuo-dori to Shin-Yokohama Ekimae Park |
Line extension | 120 meters |
Projected year | 2010 |
Maintenance Policy | This is a sub-route from Arena Street to the Nissan Stadium via the West Gate Bridge, with an effective width (1.5m). Therefore, repair of "steps and gradients" and "vehicle stop" and appropriate laying and renovating "blocks for guiding visually impaired people" will be implemented. |
Maintenance contents | Renovation of steps and gradients of sidewalks 6 About block for guiding visually impaired person Intersections, etc. 6 locations 6 places to repair car stop |
Matters to be considered | Cooperation of private businesses is required to secure an effective width (2m) of the sidewalk (retreatment, etc.) It is necessary to take the opportunity to consider maintenance. |
Cooperation of citizens, including roadsides, is indispensable in order for the target route that aims to be barrier-free through the "Road Specific Business" effectively.
About contents to work on as road manager, we show as follows.
- Utilizing city public relations magazines and websites, etc., we provide information on the business implementation status and initiatives for barrier-free.
- Regarding illegal private properties and illegal bicycle parking, etc. that narrow the effective width of roads that hinder movement, cooperation of roadside people and manners such as bicycle users are important, and guidance, removal, and promotion of bicycle parking lot use in the future. Calls.
- As abandoned bicycle measures, we devise "measure business guidelines such as Yokohama-shi bicycles" which showed role allotment such as administration, citizen or railroad company and promote.
Road maintenance to be promoted based on the "Traffic Barrier-Free Law" will be focused and integrated by 2010, so that each person can understand each other and all people can move safely and comfortably We aim to form a space network, so we ask for your cooperation.
For inquiries to this page
Road and Highway Bureau Road Department Facilities Division
Phone: 045-671-2731
Phone: 045-671-2731
Fax: 045-651-5443
Email address: do-shisetsu@city.yokohama.jp
Page ID: 551-639-850