Sugita Station, Shinsugita Station Area Road Specific Business Text Version

Last Updated June 19, 2020

Around Sugita Station, Shin-Sugita Station, Yokohama City Area Road Specific Business Plan <Developed in April 2014>

In Yokohama City, following the enforcement of the Barrier-Free Law (Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons) in December 2006, everyone can engage in independent daily and social life. We are promoting barrier-free measures to improve the environment. In Isogo Ward, we have formulated the “Basic Concept for Barrier-Free Area around Sugita Station and Shin-Sugita Station in Yokohama City Sugita Station and Shin-Sugita Station Area Barrier-Free Basic Concept”.

This time, for the realization of this basic design, we have formulated the "Sugita Station, Yokohama City Sugita Station and Shin-Sugita Station Area Road Specific Business Plan". In the future, we will implement the project based on this plan.

(1) What is the Barrier-Free Law?

The Barrier-Free Law is designed to provide buildings and public transportation, as well as off-street parking lots and city parks for all people, including the elderly, the physically handicapped, intellectual, mental and developmental disabilities, pregnant women, and injured people. With the aim of reducing the burden on the body involved in moving and improving the convenience and safety of transportation, we will promote barrier-free through the following two measures.

  • Barrier-free public transportation, buildings, public facilities, etc.
    When constructing and introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, For facility installation managers such as building owners, it is mandatory to conform to the "barrier-free maintenance standards (standards for facilitating movement, etc.) established for each facility. In addition, efforts are imposed on existing facilities to conform to the standards.
  • Integrated barrier-free priority maintenance areas
    Municipalities are responsible for public transportation, buildings, roads, off-street parking lots in areas centered on passenger facilities such as railway stations, and in areas where facilities used by the elderly and disabled are gathered (priority maintenance districts). In order to promote barrier-free such as city parks, traffic lights, etc., we can create a "barrier-free basic concept" can be created.

(2) What is the Barrier-Free Basic Concept

In priority maintenance district, to promote barrier-free such as public transportation such as railway stations, public facilities such as roads and parks, public buildings used by the elderly and disabled in priority maintenance districts, routes (life-related routes) aiming for barrier-free, and contents of business (specific businesses) to be carried out for barrier-free.

After basic design development, each company makes concrete business plan based on basic design and will carry out barrier-free in important point maintenance district. In Yokohama-shi, we carry out business for the purpose of business completion within five years from principle, basic design development.

In the "Basic Concept for Barrier-Free Area around Sugita Station and Shin-Sugita Station in Yokohama City", "Life-related facilities" and "Life-related Routes" are defined.

Living-related facilities

Facilities such as passenger facilities, government facilities, and welfare facilities used by the elderly and disabled in daily life or social life.

Mainly, (1) the facility must be used by an unspecified number of people, including the elderly and the disabled, and (2) means to reach the facility is mainly on foot from Sugita Station and Shinsugita Station Facility that satisfies the condition.

Life-related Routes

This is a route between living-related facilities, especially a route that requires a high need for barrier-free.

In addition, life-related routes are classified into the following two categories according to the target maintenance level.

Life-Related Routes (A)

Among lifestyle-related routes, routes that implement maintenance in accordance with the standards for facilitating movement, etc. based on the barrier-free law, or routes that have already been developed in accordance with the standards.

Life-Related Routes (B)

Due to local constraints such as topography and urbanization conditions, it is not possible to set a lifestyle-related route A, but in consideration of the road function and role of that route, movement based on the barrier-free law as much as possible. Routes (set as Yokohama City's unique approach)

With "road specific business plan", road manager establishes the following matter according to basic design in important point maintenance district established in basic design.

  • "Road section" to carry out road identification business
  • "Contents and planned implementation period" of road specific projects to be implemented for each section
  • Other "important matters to be considered" when implementing road-specific projects

(1) Target year

As a general rule, maintenance will be carried out with the goal of 2018.

(2) Maintenance level setting

Set the level of maintenance such as renovation will be set in consideration of regional characteristics, current design, and surrounding roadside conditions. In addition, in order to carry out effective maintenance, we plan cooperation and coordination with other companies and consider the continuity of walking space.

(3) Business scope of the target route

Considering the network between living-related facilities, the business scope of the target route was set.

(4) Main maintenance standards

We carry out maintenance based on standard to establish in "the regulations about standard of structure of road necessary for smoothness such as Yokohama-shi movement" and "town development regulations of Yokohama-shi welfare".

We plan about route to carry out business as follows to plan barrier-free in a priority and integrated manner.

In addition, we may carry out review of plan by adjustment with other companies and budget.

(1) Business plan for individual routes

(2) Target routes of road identification business plan

Target routes and business plans are as follows:

Life-related Routes (B)

Route name

1 Keikyu Sugita Station West (City Road Shinsugita No. 58)

Business segments

Intersection between Keikyu Sugita Station West Exit and Keikyu Sugita Station West

Business extension

80m

Project implementation period

2014

Maintenance Policy

[Problem] : There are places where walking space is not secured. There is a place where the gap between the drainage basin is wide and the like canes are sandwiched.
[Measures] : Install color belts and replace drainage basin lids.

Maintenance items

Renovation of drainage facilities
4 areas of drainage basins
Others
Color belt and roadside line installation 80 m
Life-related Routes (B)

Route name

2-1 Sugita Shopping Street (prefectural road Yokohama Isehara 1235)

Business segments

Seitenbashi Intersection between Plara Sugita

Business extension

260m

Project implementation period

From FY2015 to FY2016

Maintenance Policy

[Problem] : There is a place where the gap between the drainage basin is wide and the like canes are sandwiched. There are places where the pavement is rattled and difficult to walk.
[Measures] : Replace the drainage basin lid, and repair the pavement.

Maintenance items

Renovation of sidewalks
Securing flat part 3 locations
Renovation of drainage facilities
Renovation of drainage basins 25 locations
Life-related Routes (B)

Route name

2-2 Plara Sugita south side (prefectural road Yokohama Isehara 1235)

Business segments

Intersection in front of Plara Sugita to the intersection on the west side of Keikyu Sugita Station

Business extension

110m

Project implementation period

From FY2016 to FY29

Maintenance Policy

[Problem] : There is a step in the drainage facility. The vertical gradient of the road before the railroad crossing is steeper. The sidewalk pavement in front of Prarara Sugita is slippery.
[Measures] : Renovation of drainage facilities, alleviate road gradients, repair pavement materials, etc.

Maintenance items

Roadway repair 19 m2
Renovation of sidewalks
Repair of pavement material 212 m2
Renovation of drainage facilities
Refurbishment of drainage facilities 5 m
Renovation of drainage basin
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 2 new locations

Matters to be considered

Coordination with neighboring administrators is required
Life-related Routes (A)

Route name

3 Rabisuta Shinsugita south side (city road Shinsugita Route 77)

Business segments

An intersection in front of "Koban" (police box) Sugita

Business extension

90m

Project implementation period

From FY2015 to FY29

Maintenance Policy

[Problem] : At the Sugita "Koban" (police box) intersection, there are places where the flat part in front of the pedestrian crossing is not secured.
[Measures] : Ensure a flat part in front of the pedestrian crossing.

Maintenance items

Renovation of sidewalks
Securing flat part
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 2 locations
Life-related Routes (A)

Route name

4 In front of Shinsugita Station Square (City Road Shinsugita No. 74)

Business segments

Intersection in front of Sugita "Koban" (police box) to Shinsugita Station Square (Bus Platform)

Business extension

40m

Project implementation period

From FY2015 to FY29

Maintenance Policy

[Problem] : There are places where the flat part in front of the pedestrian crossing is not secured, places where the block for guiding the visually impaired does not conform to the JIS standard, and places where the gap between the drainage basin is wide and canes are sandwiched.
[Measures] : Secure a flat part in front of the pedestrian crossing, repair blocks for guiding visually impaired people, and replace drainage basin lids.

Maintenance items

Renovation of sidewalks
Complete renovation 106 m2
Renovation of drainage facilities
Renovation of drainage basin
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 3 locations
Life-related Routes (A)

Route name

7-1 Isogo Industrial Road 1 (City Road Shinsugita No. 245)

Business segments

Shinsugita Station Square (taxi platform) to the intersection in front of Sugita "Koban" (police box)

Business extension

110m

Project implementation period

From FY2015 to FY29

Maintenance Policy

[Problem] : The flat part in front of the crossing belt to the general car platform is not secured. The taxi stand hasn't been cut down. There is no continuous guidance by block for guiding visually impaired persons. There is a place where the crossing gradient is steep. It is necessary to secure a safe walking space on the sidewalk.
[Measures] : Secure a flat part in front of the crossing belt, devaluation of taxi stands, and completely renovate the sidewalk by raising the roadway. A new block for guiding visually impaired persons will be newly constructed. Ensure a safe walking space based on the bicycle traffic plan.

Maintenance items

Roadway repair 452 m2
Renovation of sidewalks
Complete renovation 272 m2
Securing flat part
Renovation of pavement materials 6 m2
Renovation of drainage facilities
Refurbishment of drainage facilities 42 m
3 locations for drainage basins
Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 116 m
Intersections, etc. 2 new locations
Intersections, etc. 2 locations
Life-related Routes (A)

Route name

7-2 Isogo Industrial Road 2 (City Road Shinsugita No. 245)

Business segments

Intersection in front of Sugita "Koban" (police box) and intersection near Shinsugita Park

Business extension

410m

Project implementation period

From FY2016 to FY2018

Maintenance Policy

[Problem] : There is a place where the flat part in front of the pedestrian crossing is not secured. There are some places where the pavement is not flat. There are places where the stop position of the car stop is too close to the block for guiding visually impaired. There are places where the block for guiding the visually impaired is degraded. There is a place where the vertical gradient is tight. It is necessary to secure a safe walking space on the sidewalk.
[Measures] : Improve the vertical gradient and secure a flat part by completely renovating the sidewalk. Renovation of pavement materials, car stops, and blocks for guiding visually impaired persons. Ensure a safe walking space based on the bicycle traffic plan.

Maintenance items

Renovation of sidewalks
Complete renovation 88 m2
Securing flat part 3 locations
Repair of pavement material 2,652 m2
Renovation of drainage facilities
Renovation of drainage basins
Installation and renovation of blocks for guiding visually impaired persons
Continuous laying repair of route guidance 404 m
Construction of parts such as intersections 4 new locations
Intersections, etc. 4 locations
Others
31 refurbishment
Relocation of telephone pole
Life-related Routes (A)

Route name

8 In front of Shinsugita Park (city road Shinsugita No. 158)

Business segments

Intersection near Shinsugita Park - Shinsugita Park

Business extension

50m

Project implementation period

From FY2016 to FY2018

Maintenance Policy

[Problem] : There are places where the gradient is steep, and there are places where blocks for guiding the visually impaired is not installed.
[Measures] : Repair the gradient and install blocks for guiding visually impaired persons.

Maintenance items

Renovation of sidewalks
Securing flat part 2
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 1 new location
Life-Related Routes (-)

Route name

9 Shinsugita Station Square (Bus Platform) (City Road Shinsugita Route 73)

Business segments

Shinsugita Station Square (Bus Platform)

Business extension

190m

Project implementation period

FY29 to FY2018

Maintenance Policy

[Problem] : There are slippery sidewalk pavements and blocks for guiding visually impaired people that do not conform to JIS standards.
[Measures] : Full renovation of sidewalk pavement and renovation of blocks for guiding visually impaired persons.

Maintenance items

Renovation of sidewalks
Renovation of pavement materials 1,315 m2
Renovation of drainage facilities
Renovation of drainage basin
Installation and renovation of blocks for guiding visually impaired persons
10 parts of intersections, etc. 10 locations

In order to promote "road specific business", we will show the following about the contents to work as a road manager.

  • Utilizing websites, etc., we will provide information on the status of barrier-free business implementation and initiatives.
  • We perform instruction, removal to cancel illegal private use article narrowing effective width of road and illegally parked bicycles that hinder traffic, and call for the use of bicycle parking lots.

In order to form a walking space network that allows all people to travel safely and comfortably, the cooperation of related parties such as traffic managers, railway operators, road occupants, and roadside residents is required. Thank you very much for your cooperation.

For inquiries to this page

Road and Highway Bureau Road Department Facilities Division

Phone: 045-671-2731

Phone: 045-671-2731

Fax: 045-651-5443

Email address: do-shisetsu@city.yokohama.jp

Return to the previous page

Page ID: 476-051-220

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews