Text version of Town Center, Tsuzuki-ku, Yokohama City Road Specific Business Plan

Last Updated November 14, 2024

Around Town Center, Tsuzuki-ku, Yokohama City Road Specific Business Plan <Developed in June 2010>

In December 2006, the "Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons" (commonly known as the new barrier-free law) was enforced. In response to this, Yokohama City is developing a basic concept around major stations and in areas where public facilities are concentrated.

In May 2010, we formulated the Basic Plan for Barrier-Free Areas in Tsuzuki-ku, Yokohama City, targeting the area around the Tsuzuki Ward   Town Center (the area around the town center), which has a variety of functions, including the Tsuzuki Ward   Office.

In order to realize this basic concept, Tsuzuki Ward   and Road and Highway Bureau have formulated a Road-Specific Business Plan that specifies the details of the project and the expected period of implementation. In the future, we will implement the project based on this plan.

(1) What is the New Barrier-Free Law?

The new barrier-free law is designed not only for the elderly and the physically handicapped, but also for all persons with disabilities, pregnant women, injured persons, etc., including intellectual, mental and developmental disabilities, as well as buildings and public transportation, as well as off-street parking lots and city parks. The purpose is to reduce the burden on the body involved in transportation and to improve the convenience and safety of transportation.

In addition, we will promote barrier-free through the following two major pillars.

  • Promotion of barrier-free public transportation, buildings, and public facilities
    When constructing or introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each company / building We obligate facility installation managers such as owners to comply with the "barrier-free standards (standards for facilitation such as movement)" established for each facility. In addition, efforts are imposed on these existing facilities to comply with the standards.
  • Promotion of barrier-free facilities in priority areas
    Municipalities are responsible for public transportation, buildings, roads, off-street parking in areas centered on passenger facilities such as railway stations, and in areas where facilities used by the elderly and disabled are gathered (important maintenance areas). In order to promote barrier-free parking, city parks, traffic lights, etc., we can create a "barrier-free basic concept" in a focused and integrated manner.

(2) What is the Basic Concept of Barrier-Free?

The barrier-free basic concept focuses on barrier-free passenger facilities such as railway stations, public facilities such as roads and parks, and public buildings used by the elderly, disabled, etc. in priority maintenance areas. In order to promote integrally, the area of the priority maintenance area, the route (life-related route) for barrier-free, and the contents of the business to be implemented for barrier-free.

In the area around the Tsuzuki Ward   Town Center, a council consisting of academics, citizens such as the elderly and disabled, related businesses and administrative organizations, etc. After repeated examinations at the preparatory meeting, a basic barrier-free concept was formulated.

In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out barrier-free in important point maintenance district with the goal of 2014.

In the Basic Plan for Barrier-Free Areas around Tsuzuki Ward   Town Center, formulated in May 2010, "Life-related routes (A)" and "Life-related routes (B)" are defined.

Life-related routes (A)

Routes that carry out maintenance in line with the standards for facilitation such as movement based on the law and the maintenance standards of the Yokohama City Welfare Town Development Ordinance, or maintenance based on both standards is made at this time, and smooth movement of elderly people, persons with disabilities, etc. Routes that do not particularly hinder

Life-related routes (B)

Considering the road function and role of the route and the restriction conditions such as the situation of urbanization and topography, after fully recognizing the concept of the standard for facilitating movement based on the law and the maintenance standards of the Yokohama City Welfare Town Development Ordinance, Routes that carry out maintenance for barrier-free by actively applying it mutatis mutandis (set as Yokohama City's own initiative)

  • "Road section" that implements road identification projects
  • "Contents and scheduled implementation period" of road-specific projects to be implemented for each section
  • Other "important matters to be considered" when implementing road-specific projects
    *Priority areas: Including the location of life-related facilities (stations, government offices, welfare facilities, other facilities), it is particularly necessary that the movement between each facility is usually performed on foot, and that projects to facilitate movement etc. be implemented. Area recognized.

(1) Target year

As a general rule, we will carry out maintenance with the goal until 2014.

(2) Setting the maintenance level

We will set maintenance levels such as renovation in consideration of regional characteristics, current design, and surrounding roadside conditions. In addition, in order to carry out effective maintenance, we plan cooperation and consistency with other companies and consider continuity of walking space.

(3) Main maintenance standards of the guidelines for smooth maintenance of road movement, etc.

We carry out maintenance based on "facilitation maintenance guidelines such as movement of road" and "town development regulations facility maintenance manual of Yokohama-shi welfare".

We show plan as follows about route to carry out business to plan barrier-free mainly, integrally.

In addition, in order to make the plan more effective, the plan may be reviewed through coordination with other businesses or budgets.

(1) Business plan for individual routes

(2) Routes subject to road specific business plans

Target routes and business plans are as follows:

Life-related routes (B)

Route name

(1)In front of emergency emergency clinics (Kitayamada 299)

Business Section

Tsuzuki Ward   Medical Center Entrance Intersection - Tsuzuki Ward   Holiday Emergency clinics

Business extension

70m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the main route from the entrance intersection of the Tsuzuki Ward   Medical Center to the Tsuzuki Ward   Holiday Emergency clinics.
[Issues] : There is a wave of pavement in the walking space.
[Measures] : Widen the sidewalk (1.5m → 2.0m) and semi-flat.

Maintenance items

Securing pedestrian spaces
Width of sidewalk 70m
Laying and renovation of blocks for guiding visually impaired persons
1 new installation at intersections, etc.

Matters to be considered

Road renovation is required in line with the widening of the sidewalk (separate examination is required)
Life-related routes (B)

Route name

(2)South side of Ushikubo Park (Kitayamada 305,306)

Business Section

Namiki Pedestrian Bridge (including pedestrian bridge)-Ushikubo Park

Business extension

240m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the main route from Namiki pedestrian bridge (including pedestrian bridge) to Ushikubo Park.
[Issues] : The pavement of the sidewalk going up to the pedestrian bridge is not flat, and the brightness ratio and standard of the block for guiding visually impaired persons in the stairs are different from the JIS standard.
[Measures] : Ensure flatness by renovating the pavement and repair blocks for guiding the visually impaired.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 130m2
Laying and renovation of blocks for guiding visually impaired persons
Installation of bus stop and stairs 3 new locations
Others
Installation of two-stage handrails 65m
Life-related routes (A)

Route name

(3)Ushikubo / Nakagawa Line (Ushikubo Nakagawa Line 7137)

Business Section

Namiki sidewalk Hashimoto-Uchiji intersection

Business extension

240m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is a route connecting Hashimoto, a tree-lined sidewalk, to the intersection.
[Issues] : There are places where the steps and slopes are tight at the intersection.
[Measures] : Renovation of steps and slopes at intersections, and renovation of blocks for guiding visually impaired people.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and slopes
Renovation of pavement materials 40m2
Laying and renovation of blocks for guiding visually impaired persons
Two new installations at intersections, etc.
Installation of bus stop and stairs 2 new locations
Life-related routes (A)

Route name

(4)North side of Center-Kita Station (Kitayamada 302,304,360)

Business Section

Mosaic Mall Kohoku side to Namiki sidewalk Hashimoto

Business extension

200m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the main route from the north side of Mosaic Mall Port to Hashimoto, a tree-lined sidewalk.
[Issues] : There is a step between the roadway and the sidewalk, and the laying of blocks for guiding the visually impaired is insufficient.
[Measures] : Renovation of steps and gradients at intersections and new construction and renovation of blocks for guiding visually impaired people.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and slopes
Renovation of pavement materials 10m2
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes (B)

Route name

(5)In front of Cherry / Hime Apple Park (Nakagawa 60,68, Kitayamada 373)

Business Section

Slight Pedestrian Bridge - Kusabue Road

Business extension

760m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the main route from the faint pedestrian bridge to the road of Kusabue.
[Issues] : There are no two-stage handrails on the sidewalks and slopes to the pedestrian bridge. In addition, there is no block for guiding visually impaired people on the stairs.
[Measures] : Two-step handrails will be installed on the sidewalk and slope. In addition, a block for guiding visually impaired persons will be installed on the stairs.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation of bus stops, stairs, etc. 2 locations
Others
Installation of two-stage handrails 45m
Life-related routes (A)

Route name

(6)Centerkita Station (Kitayamada 360,362, station square)

Business Section

Around Centerkita Square

Business extension

280m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is a route in front of the station near Centerkita Square.
[Issues] : There are places where the block for guiding visually impaired persons has deteriorated.
[Measures] : Repair blocks for guiding visually impaired persons.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 10m2
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 120m

Matters to be considered

About station square, we coordinate with taxi, bus company and consider repair.
Life-related routes (A)

Route name

(7)Minakita Walk (Nakagawa 39,47,97,101,159,238,240)

Business Section

Center-Kita Station to Center Minami Station

Business extension

830m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Route] : It is a route connecting Center-Kita Station to Center Minami Station.
[Issues] : There are some places where the flatness of the pavement is not maintained.
[Measures] : Refurbishment of the pavement. The installation of rest areas, etc. will be considered separately.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 10m2

Matters to be considered

We will continue to examine pedestrian traffic lines.
Life-related routes (A)

Route name

(8)In front of Yokohama City Museum of History (Nakagawa 33, 48,103)

Business Section

Minakita Walk ~ Otsuka Toshikatsudo Park

Business extension

290m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is a route connecting Minato Walk to Otsuka Toshikatsudo Park and leads to the Yokohama City Museum of History.
[Issues] : There are some places where the pavement is not flat. In addition, there is a deterioration of the block for guiding visually impaired persons.
[Measures] : Repair the pavement and laying blocks for guiding the visually impaired.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 5 locations
Life-related routes (A)

Route name

(9)In front of Tsuzuki's Culture Dream Studio (Nakagawa 33)

Business Section

In front of Tsuzuki's Culture Dream Studio

Business extension

180m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the route from Minato Walk to Tsuzuki's Culture Dream Studio.
[Issues] : There is a wave on the sidewalk. In addition, it is dangerous for pedestrians because there is a stop on the sidewalk.
[Measures] : The pavement will be renovated to eliminate the wave of the sidewalk. In addition, we will remove the car stop.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and slopes
Partial renovation (renovation only for sidewalks) 150m
Refurbishment of drainage facilities
Others
Refurbishment of car stoppers

Matters to be considered

Consultation with the parking lot manager is required.
Life-related routes (A)

Route name

(10-1) Minato-mae (Prefectural Road Yokohama Ikuta 1236)

Business Section

Walk-Kohoku Minamo-mae

Business extension

180m

Project implementation period

2010

Maintenance Policy

[Route] : It is the route from the Minami Walk to the front.
[Issues] : There is no block for guiding visually impaired people at the bus stop.
[Measures] : A block for guiding visually impaired people will be laid at the bus stop.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and slope
Laying and renovation of blocks for guiding visually impaired persons
Newly laid parts such as bus stop, stairs, etc.
Life-related routes (A)

Route name

(10-2) In front of Lurara Kohoku (prefectural road Yokohama Ikuta 1236)

Business Section

Walk ~ Lullara Kohoku-mae

Business extension

170m

Project implementation period

Fiscal 2010 to Fiscal 2011

Maintenance Policy

[Route] : It is the route from the Minami Walk to the front of Lullara Kohoku.
[Issues] : There is no block for guiding visually impaired people at the bus stop.
[Measures] : A new block for guiding visually impaired persons will be established.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
1 new construction of bus stop and stairs
Life-related routes (A)

Route name

(11-1) In front of Kohnan (Nakagawa 436)

Business Section

Reimei sidewalk Hashimoto to Kohnan Port Kita Centerminami store

Business extension

100m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is a route from Hashimoto on the dawn sidewalk to Kohnan Port Kita Centerminami.
[Issues] : There is no block for guiding visually impaired people in the pedestrian crossing. Also, the pavement is not flat.
[Measures] : Installation of blocks for guiding visually impaired people. In addition, the paving will be improved.

Maintenance items

Partial renovation of the sidewalk
Coloring of pavement 20m2
Laying and renovation of blocks for guiding visually impaired persons
Two new installations at intersections, etc.
Life-related routes (A)

Route name

(11-2) In front of Pine Create Building (Nakagawa 436)

Business Section

In front of the dawn sidewalk Hashimoto to Pine Create Building

Business extension

90m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is the route from Hashimoto on the dawn sidewalk to Pine Create Building.
[Issues] : The installation of blocks for guiding visually impaired persons is inadequate.
[Measures] : Laying blocks for guiding visually impaired persons

Maintenance items

Securing walking space
Width of sidewalk 30m
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 7 locations
Life-related routes (A)

Route name

(12)North side of center south station (Nakagawa 240, station square)

Business Section

Center Minami Station to Center Minami Station Square (North side)

Business extension

60m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Route] : It is a route from Center Minami Station to Center Minami Station Square.
[Issues] : There is an uninstalled block for guiding visually impaired persons at intersections.
[Measures] : A new block for guiding visually impaired persons will be established at intersections.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 60m

Matters to be considered

In the station square, secure the flat part of the taxi stand and renovate the guide block for the visually impaired.
Life-related routes (A)

Route name

(13)South side of Center Minami Station (Nakagawa 231)

Business Section

Center Minami Station to Center Minami Station Square (South side)

Business extension

90m

Project implementation period

2014

Maintenance Policy

[Route] : It is a route connecting the center south station to the center south station square.
[Issues] : The block for guiding visually impaired persons at intersections has deteriorated.
[Measures] : Renovation of blocks for guiding visually impaired persons

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes A(B)

Route name

(14)In front of Chigasakihigashi Elementary School (Nakagawa 235,305,408)

Business Section

In front of Center Minami Station bicycle parking lot-Chigasaki Park

Business extension

800m

Project implementation period

2014

Maintenance Policy

[Route] : It is a route connecting Chigasaki Park in front of the bicycle parking lot of Center Minami Station.
[Issues] : The block for guiding visually impaired persons is outside the JIS standard, and it is difficult to see it on stairs etc.
[Measures] : Renovation of blocks for guiding visually impaired persons

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Installation of bus stop and stairs 2 new locations
Others
1 repair of planting masu
Life-related routes (A)

Route name

(15)Aune KOHOKU Yoko (Nakagawa 243)

Business Section

Center Minami Station Square-AuneKOHOKU Side

Business extension

70m

Project implementation period

2014

Maintenance Policy

[Route] : It is a route from Center Minami Station Square to AuneKOHOKU.
[Issues] : Since the laying of blocks for guiding the visually impaired at the stairs is on the manhole, it is dangerous for traffic, such as the possibility of stepping over.
[Measures] : The shape should be easy to recognize, such as laying blocks for guiding visually impaired persons on manholes.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Installation of bus stop and stairs 13 new locations
Life-related routes (A)

Route name

(16)Center Minami Station Square (Nakagawa 234,235,297)

Business Section

Around Centerminami Square

Business extension

690m

Project implementation period

Fiscal 2011 - Fiscal 2012

Maintenance Policy

[Route] : Around Centerminami Square
[Issues] : Because pedestrians and bicycles are in the same space, safe walking spaces for pedestrians are not secured and dangerous.
Since the block for guiding visually impaired people is meandering, it is necessary to consider route guidance.
[Measures] : For route guidance, the block for guiding visually impaired persons is placed linearly.
A 3.5m wide walking space will be secured and the pavement will be renovated.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 710m2
Laying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 110m
Continuous laying and repair of route guidance 130m
Others
Set up a rest area 1
Life-related routes (A)

Route name

(17)In front of Tsuzuki Ward   General Government Building (Nakagawa 149,220,222)

Business Section

Tsuzuki Oldness and Pedestrian Bridge (including Pedestrian Bridge) to Showa University Northern Yokohama Hospital

Business extension

280m

Project implementation period

Fiscal 2011 - Fiscal 2012

Maintenance Policy

[Route] : It is the route from Tsuzuki Furusato Pedestrian Bridge to Showa University Northern Yokohama Hospital.
[Issues] : A flat walking space is not secured due to deterioration of the block for guiding the visually impaired and damage to the pavement.
[Measures] : Refurbishment of blocks and pavement for guiding visually impaired persons.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 200m2
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 110m
Life-related routes (A)

Route name

(18)Soy wind and view pedestrian bridge (Nakagawa 150,155,157)

Business Section

Showa University Northern Yokohama Hospital-mae – Overlooking pedestrian bridge (including pedestrian bridge)

Business extension

200m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Route] : It is the route from Showa University Northern Yokohama Hospital to the pedestrian bridge.
[Issues] : There is a deterioration of the block for guiding the visually impaired, and the pavement is sinking.
[Measures] : Renovation of blocks for guiding visually impaired persons and renovation of pavement.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 20m2
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 120m
Life-related routes (A)

Route name

(19)police department Tsuzuki (Nakagawa 219,222, Eda 321)

Business Section

Kakehashi Tsuzuki, a welfare activity base in front of police department Tsuzuki

Business extension

180m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Route] : It is a route from Tsuzuki police department to Kakehashi Tsuzuki, a welfare activity base.
[Issues] : There are sections where there are steep steps and gradients at the crossing of the roadway, and sections where there is no block for guiding visually impaired people.
[Measures] : Renovation of steps and slopes at the crossing of the roadway, and renovation of blocks for guiding visually impaired people.

Maintenance items

Partial renovation of the sidewalk
Renovation of pavement materials 40m2
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes (A)

Route name

(20)In front of Key South (Nakagawa 300)

Business Section

In front of Centerminami Station to Key South

Business extension

60m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Route] : It is a route from Center Minami Station to Key South.
[Issues] : The brightness ratio of the block for guiding visually impaired persons is insufficient.
[Measures] : Refurbished blocks for guiding visually impaired people.

Maintenance items

Laying and renovation of blocks for guiding visually impaired persons
Two parts laying and renovations at intersections, etc.

We show the following about contents to work on as road manager to promote "road specific business".

  • Utilizing city public relations magazines and websites, we provide information on the status of business implementation and approaches for barrier-free.
  • About illegal private property or illegal bicycle parking that hinders movement and narrows the effective width of the road, cooperation of roadside people and manners such as cyclists are important, and guidance, removal, promotion of bicycle parking lot use will be promoted in the future And so on.
  • About guidance sign, we make overall plan in Yokohama-shi based on basic designs. We will coordinate with each business and install information signs on the road.

In addition, in order to form a walking space network that allows everyone to move safely and comfortably, each person should understand each other and related parties such as traffic managers, railway operators, road occupants, roadside residents, etc. Cooperation is required. Thank you very much for your cooperation.

Inquiries to this page

Road and Highway Bureau Road Department Facilities Division

Telephone: 045-671-2731

Telephone: 045-671-2731

Fax: 045-550-3376

Email address: do-shisetsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 395-367-884

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews