Around Oguchi Station and Koyasu Station, Yokohama City Road Specific Business Plan Text Version

Last Updated June 19, 2020

Yokohama City Oguchi Station and Koyasu Station Area Road Specific Business Plan

 In response to the enforcement of the Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons (New Barrier-Free Law) in December 2006, Yokohama City has been promoting various barrier-free measures, including the development of basic concepts.
 In response to this, Kanagawa Ward established the “Oguchi Station and Koyasu Station Area Barrier-Free Basic Concept” in December 2011, targeting areas around Oguchi Station and Koyasu Station, where facilities used by an unspecified number of people, including cultural facilities, welfare facilities, and commercial facilities.
 To realize this basic concept, Kanagawa Ward and Road and Highway Bureau have formulated a road-specific business plan that defines the details of the project and the planned implementation period. In the future, we will implement the project based on this plan.

(1) What is the New Barrier-Free Law?

 In order to improve the convenience and safety of transportation and facility use for the elderly, disabled, pregnant women, and injured people, the following two major pillars will promote barrier-free use.

  • Promotion of barrier-free public transportation, buildings, public facilities, etc.
     When newly constructing and introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each business operator・ We require facility setting managers such as building owners to conform to the "barrier-free maintenance standards (mooth facilitation standards for movement)" established for each facility. In addition, efforts are imposed on existing facilities to conform to the standards.
  • Promotion of barrier-free areas of priority maintenance areas (*)
     Municipalities are located in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and in areas where transportation between facilities is usually performed on foot (priority maintenance districts) In order to promote barrier-free services such as buildings, roads, off-street parking lots, city parks, traffic lights, etc., we can create a "barrier-free basic design".
※ Priority maintenance district
 The area of the entire district is approximately less than 400ha, there are three or more living-related facilities, and a considerable number of elderly people, persons with disabilities, etc. who use the facilities, move between the facilities is on foot It is a district that is expected to be carried out on, and it is recognized that it is necessary to promote focused and integrated barrier-free barrier-free. The boundaries of the priority maintenance area are clearly indicated by town boundaries, character boundaries, roads, rivers, railways, facilities such as railways, city planning roads, etc.

(2) What is the Barrier-Free Basic Concept

 In priority maintenance district, to promote barrier-free such as public transportation such as railway stations, public facilities such as roads and parks, public buildings used by the elderly and disabled in priority maintenance districts, routes (life-related routes) aiming for barrier-free, and contents of business (specific businesses) to be carried out for barrier-free.
 In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out barrier-free in important point maintenance district. In Yokohama-shi, we carry out business with the goal of five years from principle, basic design development.

 In the "Oguchi Station / Koyasu Station Area Barrier-Free Basic Concept", "Life-related facilities" and "Life-related routes" are defined.

Living-related facilities

 Facilities such as passenger facilities, government facilities, and welfare facilities that are used by the elderly and disabled in daily or social life.
 Mainly, (1) the facility must be used by an unspecified number of people, including the elderly and disabled, and (2) means to reach the facility is mainly on foot from Oguchi Station and Koyasu Station. Facility that satisfies the conditions.

Life-related Routes

 A route between living-related facilities, especially a route that requires a high need to be barrier-free.
 Life-related routes are classified into the following two categories according to the target maintenance level in the implementation of projects related to the maintenance of roads.

Life-Related Routes (A)
  • Of life-related routes, routes that carry out maintenance in accordance with the standards for facilitation such as movement based on the law and the maintenance standards of the Yokohama City Welfare Town Development Ordinance, or routes that have already been maintained in line with both standards.
Life-Related Routes (B)
  • Among lifestyle-related routes, it cannot be set to lifestyle-related route A due to local restrictions such as topography and urbanization conditions, but considering the road function and role of the route, facilitating smooth movement based on the law as much as possible (set as Yokohama City's original approach)

 With "road specific business plan", road manager establishes the following matter according to basic design in important point maintenance district established in basic design.

  • "Road section" to carry out road identification business
  • "Contents and planned implementation period" of road specific projects to be implemented for each section
  • Other "important matters to be considered" when implementing road-specific projects

 (1) Target year
   As a general rule, we will work toward the implementation of the business with the goal of 2016.
 (2) Maintenance level setting
   Set the level of maintenance such as renovation will be set in consideration of regional characteristics, current design, and surrounding roadside conditions. In order to implement effective maintenance.
  In addition to coordinating and coordinating with other businesses, we will consider the continuity of walking space.
 (3) Main maintenance standards for road movement facilitation maintenance
   We carry out maintenance based on "Guidelines for facilitating the movement of roads" and "Yokohama City Welfare Town Development Ordinance Facility Maintenance Manual"
  I'll do it.

 We show plan as follows about route to carry out business to plan barrier-free mainly integrally and integrally.
 In addition, in order to make the plan more effective, the plan may be reviewed due to coordination with other companies or budgets.

 Target routes and business plans are as follows:

Life-Related Routes (B)

Route name

1 Kaminogi Park Entrance

Business segments

Kaminogi Park Entrance Intersection ~ Kaminogi Park Entrance

Business extension

380m

Project implementation period

From FY2015 to FY2016

Maintenance Policy

[Problem] : There are no blocks for guiding the visually impaired, a decrease in the effective width of the sidewalk due to street lights, and steep crossing gradients.
[Measures] : Improve new blocks for guiding visually impaired people, relocate street lights, and improve crossing gradients.

Maintenance items

Full renovation of the sidewalk 100m
Partial renovation of the sidewalk
Renovation of steps and gradients 2 locations
Installation and renovation of blocks for guiding visually impaired persons
Parts laid at intersections, etc. 9 new locations
Intersections, etc. 2 locations
Others
Relocation of lighting columns, etc.

Matters to be considered

Regarding the relocation of road lighting, adjustment with the relocation destination is required.
The sidewalk maintenance needs to be coordinated with some roadside institutions.
Life-Related Routes (A)

Route name

2 In front of the Kaminogi district center

Business segments

In front of Life Oguchi store to Irie 2-chome intersection

Business extension

390m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Problem] : There are steep places where the slope of the pedestrian crossing is steep, a decrease in the effective width of the sidewalk by telephone box, and places where blocks for guiding the visually impaired has not been laid.
[Measures] : Improve the gradient of the pedestrian crossing, secure the effective width of the sidewalk by relocating the telephone box, and properly lay blocks for guiding the visually impaired.

Maintenance items

Partial renovation of the sidewalk
Renovation of steps and gradients 8 locations
Installation and renovation of blocks for guiding visually impaired persons
Construction of parts such as intersections 10 new locations
Intersections, etc. 3 locations

Matters to be considered

The sidewalk maintenance needs to be coordinated with some roadside institutions.
Life-Related Routes (B)

Route name

3 In front of the post office

Business segments

Oguchi Station East Exit to Kotaki Bridge (Irie River)

Business extension

80m

Project implementation period

From FY2015 to FY2016

Maintenance Policy

[Problem] : There are places where blocks for guiding visually impaired people are not laid.
[Measures] : A new block for guiding visually impaired persons.

Maintenance items

Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 1 new location
Life-Related Routes (B)

Route name

4 Oguchi Station South Level Crossing

Business segments

Irie Crossing and Irie 2-chome intersection

Business extension

160m

Project implementation period

From FY2015 to FY2016

Maintenance Policy

[Problem] : There are places where the vertical gradient is steep and places where blocks for guiding the visually impaired are not laid.
[Measures] : New sidewalks will be constructed to improve the vertical gradient, improve the slope of pedestrian crossings, and establish blocks for guiding visually impaired persons.

Maintenance items

New sidewalk 10 m
Partial renovation of the sidewalk
5 locations for steps and gradients
Installation and renovation of blocks for guiding visually impaired persons
Construction of parts such as intersections 10 new locations
Life-Related Routes (A)

Route name

5 Oguchi Station West Exit Rotary North

Business segments

Yokohama Oguchi Post Office~ Oguchi Station Square

Business extension

200m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Problem] : There are places where the effective width is not secured due to road lighting. In addition, there are places where continuous wavewaving sidewalks or blocks for guiding visually impaired people are not laid.
[Measures] : By relocating lighting columns, the effective width of the sidewalk will be widened. In addition, full renovation of roads and sidewalks, improvement of wavy sidewalks, change to permeable pavement, and appropriate laying blocks for guiding visually impaired persons will be performed.

Maintenance items

Widening of the sidewalk 50 m
Complete renovation of sidewalk 210 m
Partial renovation of the sidewalk
Improvement of steps and rubbed gradients
Installation and renovation of blocks for guiding visually impaired persons
Continuous laying of route guidance 100 m
Intersections, etc. 2 new locations
Intersections, etc. 4 locations
Others
Relocation of lighting columns, etc.

Matters to be considered

Regarding the relocation of road lighting, adjustment with the relocation destination is required.
Life-Related Routes (A)

Route name

6 In front of the Bank of Yokohama

Business segments

Oguchi-dori Intersection-Oguchi Station Square

Business extension

130m

Project implementation period

From FY2012 to FY2013

Maintenance Policy

[Problem] : It is a steep slope of the pedestrian crossing and a lifestyle-related route (A), but it is not permeable pavement. In addition, there are places where blocks for guiding the visually impaired are not laid.
[Measures] : Improve the gradient of the pedestrian crossing, change to permeable pavement, and establish a new block for guiding visually impaired people.

Maintenance items

Complete renovation of sidewalk 210 m
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 1 new location
Life-Related Routes (B)

Route name

7 Oguchi-dori Shopping Street

Business segments

Oguchi-dori Intersection~ National Route 1

Business extension

390m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Problem] : Blocks for guiding visually impaired persons have not been properly laid. In addition, there are obstacles near the block for guiding visually impaired people.
[Measures] : Appropriate laying and removing blocks for guiding visually impaired persons. In addition, the continuous laying of blocks for guiding the visually impaired will be renovated to avoid obstacles.

Maintenance items

Partial renovation of the sidewalk
3 locations for steps and gradients
Renovation of pavement material 120 m2
Installation and renovation of blocks for guiding visually impaired persons
Continuous laying of route guidance 20 m
Intersections, etc. 6 new locations
Intersections, etc. 1 location
Life-Related Routes (B)

Route name

8 Oguchi 1st Avenue

Business segments

Nishi Koyasu Underground North Exit - National Route 1

Business extension

220m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Problem] : There are places where the steps on the pedestrian crossing are high and places where there is unevenness on the sidewalk.
[Measures] : Partial renovation of the sidewalk to eliminate steps and eliminate unevenness.

Maintenance items

Partial renovation of the sidewalk
7 locations for steps and gradients
Life-Related Routes (B)

Route name

9 Koyasu Station Entrance

Business segments

Keihin Koyasu Station Entrance Intersection to Koyasu Station

Business extension

80m

Project implementation period

From FY2013 to FY2014

Maintenance Policy

[Problem] : There is no block for guiding the visually impaired because there is no sidewalk set up just before the railroad crossing.
[Measures] : Construction of sidewalks and new blocks for guiding visually impaired people.

Maintenance items

New sidewalk 10 m
Partial renovation of the sidewalk
3 locations for steps and gradients
Installation and renovation of blocks for guiding visually impaired persons
Construction of parts such as intersections 4 new locations
Life-Related Routes (B)

Route name

10 Nishi Koyasu Underpass

Business segments

Nishi Koyasu Underpass

Business extension

40m

Project implementation period

2012

Maintenance Policy

[Problem] : The handrail in the underpass is one step, and there is no Braille indication. In addition, the block for guiding the visually impaired is severely deteriorated.
[Measures] : Change the handrails to two steps and attach the Braille destination sign. In addition, the block for guiding the visually impaired will be renovated, and in order to improve safety, visually easy identification will be provided at the stairs nostrils.

Maintenance items

Installation and renovation of blocks for guiding visually impaired persons
Continuous laying of route guidance 20 m
Intersections, etc. 1 location
Others
Two renovations of stairs, etc.
Life-Related Routes (B)

Route name

11 Entrance to School for the Blind

Business segments

Part of the route from Oguchi Kobo No. 3 Contact TOMO near intersection to the Municipal Special Needs School for Blind

Business extension

230m

Project implementation period

2012

Maintenance Policy

[Problem] : There are places where the crossing gradient is steep, and places where blocks for guiding the visually impaired are aging and damaged.
[Measures] : Improve the crossing slope by renovating the sidewalk and renovating blocks for guiding visually impaired people.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and gradients
3 locations for crossing gradients
Installation and renovation of blocks for guiding visually impaired persons
Continuous laying repair of route guidance 30 m
Intersections, etc. 3 locations
Life-Related Routes (B)

Route name

12 JR Oguchi Company's house west

Business segments

Part of the route from Oguchi Kobo No. 3 Contact TOMO near intersection to the Municipal Special Needs School for Blind

Business extension

120m

Project implementation period

2013

Maintenance Policy

[Problem] : There are places where blocks for guiding visually impaired people are aging and damaged.
[Measures] : Refurbishment blocks for guiding the visually impaired.

Maintenance items

Installation and renovation of blocks for guiding visually impaired persons
Continuous laying repair of route guidance 10 m
Life-Related Routes (B)

Route name

In front of school for the Blind

Business segments

Municipal School for the Blind-Orthopaedic surgery

Business extension

500m

Project implementation period

2013

Maintenance Policy

[Problem] : It is a route to a special support school for the blind, but there are many damaged areas because there is no sidewalk and a block for guiding the visually impaired is laid on one side of the road.
[Measures] : Refurbishment blocks for guiding the visually impaired.

Maintenance items

Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 450 m
Others
One renovation of stairs, etc.
Life-Related Routes (B)

Route name

14 In front of Shonan Shinkin Bank

Business segments

Orthopaedic surgery Railroad Crossing

Business extension

200m

Project implementation period

From FY2014 to FY2015

Maintenance Policy

[Problem] : There are places where the slope of the pedestrian crossing is steep, and there are places where blocks for guiding visually impaired people are not properly laid.
[Measures] : Improve the slope of the pedestrian crossing, establish a new sidewalk (extension), and establish a block for guiding visually impaired people.

Maintenance items

New sidewalk 2 m
Partial renovation of the sidewalk
6 locations for steps and gradients
Installation and renovation of blocks for guiding visually impaired persons
New construction of intersections, etc. 12 locations
Life-Related Routes (A)

Route name

15 Oguchi Station West Exit Rotary South

Business segments

Signal intersection on the east side of Oguchi Station Square to Oguchi-dori Intersection

Business extension

100m

Project implementation period

From FY2014 to FY2015

Maintenance Policy

[Problem] : Although it is a steep slope of the pedestrian crossing and a lifestyle-related route (A), there are not permeable pavement, and there are places where blocks for guiding the visually impaired is not laid.
[Measures] : Improve the slope of the pedestrian crossing, change the sidewalk to permeable pavement, and properly lay blocks for guiding visually impaired people.

Maintenance items

Full renovation of the sidewalk 200 m
Partial renovation of the sidewalk
Improvement of steps and rubbed gradients
Installation and renovation of blocks for guiding visually impaired persons
Parts laid at intersections, etc. 7 new locations
Life-Related Routes (B)

Route name

16 In front of Oguchi Hospital

Business segments

Signal intersection on the east side of Oguchi-dori Intersection~ Yokohama Shinkin Bank Oguchi Branch

Business extension

80m

Project implementation period

2016

Maintenance Policy

[Problem] : There is no sidewalk, only roadside lines, and there is a lot of parking on the street.
[Measures] : By laying color belts, the walking space is secured.

Maintenance items

Others
Color belt laying 80 m
Life-Related Routes (B)

Route name

17 JR Ko Line Bridge

Business segments

Nanashimacho Intersection - Koyasu 1-chome intersection

Business extension

320m

Project implementation period

From FY2015 to FY2016

Maintenance Policy

[Problem] : It is a route without a sidewalk, and there is no Braille destination sign on this line bridge.
[Measures] : A walking space is secured by laying a color belt, and a Braille destination sign will be attached to this bridge.

Maintenance items

Partial renovation of the sidewalk
Refurbishment of steps and gradients
Others
Color belt laid 360 m
Two renovations of stairs, etc.

 In order to promote "road specific business", we will show the following about the contents to work as a road manager.

  • Utilizing city public relations magazines and websites, etc., we provide information on the business implementation status and initiatives for barrier-free.
  • Regarding illegal private properties and illegal bicycle parking, etc., which hinder movement and narrow the effective width of the road, cooperation of roadside people and manners such as bicycle users are important, and guidance, removal, and promotion of bicycle parking lot use in the future Calls.

 In addition, in order to form a walking space network where all people can travel safely and comfortably, each and every one understands each other, and related parties such as traffic managers, railway operators, road occupation companies, roadside residents, and roadside residents. Cooperation is required. Thank you very much for your cooperation.

For inquiries to this page

Road and Highway Bureau Road Department Facilities Division

Phone: 045-671-2731

Phone: 045-671-2731

Fax: 045-651-5443

Email address: do-shisetsu@city.yokohama.jp

Return to the previous page

Page ID: 621-843-853

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews