Around Oguchi Station and Koyasu Station, Yokohama City Road Specific Business Plan Text Version
Last Updated June 19, 2020
Yokohama City Oguchi Station and Koyasu Station Area Road Specific Business Plan
1. First of all,
2. New Barrier-Free Law
3. Routes for priority maintenance areas and barrier-free
4. What is a road-specific business plan?
5. Maintenance Policy
6. Maintenance Plan
(1) Business plan for individual routes
(2) Target routes of road identification business plan
7. Promotion of Road Specific Business Plan
In response to the enforcement of the Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons (New Barrier-Free Law) in December 2006, Yokohama City has been promoting various barrier-free measures, including the development of basic concepts.
In response to this, Kanagawa Ward established the “Oguchi Station and Koyasu Station Area Barrier-Free Basic Concept” in December 2011, targeting areas around Oguchi Station and Koyasu Station, where facilities used by an unspecified number of people, including cultural facilities, welfare facilities, and commercial facilities.
To realize this basic concept, Kanagawa Ward and Road and Highway Bureau have formulated a road-specific business plan that defines the details of the project and the planned implementation period. In the future, we will implement the project based on this plan.
(1) What is the New Barrier-Free Law?
In order to improve the convenience and safety of transportation and facility use for the elderly, disabled, pregnant women, and injured people, the following two major pillars will promote barrier-free use.
- Promotion of barrier-free public transportation, buildings, public facilities, etc.
When newly constructing and introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each business operator・ We require facility setting managers such as building owners to conform to the "barrier-free maintenance standards (mooth facilitation standards for movement)" established for each facility. In addition, efforts are imposed on existing facilities to conform to the standards. - Promotion of barrier-free areas of priority maintenance areas (*)
Municipalities are located in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and in areas where transportation between facilities is usually performed on foot (priority maintenance districts) In order to promote barrier-free services such as buildings, roads, off-street parking lots, city parks, traffic lights, etc., we can create a "barrier-free basic design".
- ※ Priority maintenance district
- The area of the entire district is approximately less than 400ha, there are three or more living-related facilities, and a considerable number of elderly people, persons with disabilities, etc. who use the facilities, move between the facilities is on foot It is a district that is expected to be carried out on, and it is recognized that it is necessary to promote focused and integrated barrier-free barrier-free. The boundaries of the priority maintenance area are clearly indicated by town boundaries, character boundaries, roads, rivers, railways, facilities such as railways, city planning roads, etc.
(2) What is the Barrier-Free Basic Concept
In priority maintenance district, to promote barrier-free such as public transportation such as railway stations, public facilities such as roads and parks, public buildings used by the elderly and disabled in priority maintenance districts, routes (life-related routes) aiming for barrier-free, and contents of business (specific businesses) to be carried out for barrier-free.
In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out barrier-free in important point maintenance district. In Yokohama-shi, we carry out business with the goal of five years from principle, basic design development.
In the "Oguchi Station / Koyasu Station Area Barrier-Free Basic Concept", "Life-related facilities" and "Life-related routes" are defined.
Living-related facilities
Facilities such as passenger facilities, government facilities, and welfare facilities that are used by the elderly and disabled in daily or social life.
Mainly, (1) the facility must be used by an unspecified number of people, including the elderly and disabled, and (2) means to reach the facility is mainly on foot from Oguchi Station and Koyasu Station. Facility that satisfies the conditions.
Life-related Routes
A route between living-related facilities, especially a route that requires a high need to be barrier-free.
Life-related routes are classified into the following two categories according to the target maintenance level in the implementation of projects related to the maintenance of roads.
- Life-Related Routes (A)
- Of life-related routes, routes that carry out maintenance in accordance with the standards for facilitation such as movement based on the law and the maintenance standards of the Yokohama City Welfare Town Development Ordinance, or routes that have already been maintained in line with both standards.
- Life-Related Routes (B)
- Among lifestyle-related routes, it cannot be set to lifestyle-related route A due to local restrictions such as topography and urbanization conditions, but considering the road function and role of the route, facilitating smooth movement based on the law as much as possible (set as Yokohama City's original approach)
With "road specific business plan", road manager establishes the following matter according to basic design in important point maintenance district established in basic design.
- "Road section" to carry out road identification business
- "Contents and planned implementation period" of road specific projects to be implemented for each section
- Other "important matters to be considered" when implementing road-specific projects
(1) Target year
As a general rule, we will work toward the implementation of the business with the goal of 2016.
(2) Maintenance level setting
Set the level of maintenance such as renovation will be set in consideration of regional characteristics, current design, and surrounding roadside conditions. In order to implement effective maintenance.
In addition to coordinating and coordinating with other businesses, we will consider the continuity of walking space.
(3) Main maintenance standards for road movement facilitation maintenance
We carry out maintenance based on "Guidelines for facilitating the movement of roads" and "Yokohama City Welfare Town Development Ordinance Facility Maintenance Manual"
I'll do it.
We show plan as follows about route to carry out business to plan barrier-free mainly integrally and integrally.
In addition, in order to make the plan more effective, the plan may be reviewed due to coordination with other companies or budgets.
Target routes and business plans are as follows:
Route name | 1 Kaminogi Park Entrance |
---|---|
Business segments | Kaminogi Park Entrance Intersection ~ Kaminogi Park Entrance |
Business extension | 380m |
Project implementation period | From FY2015 to FY2016 |
Maintenance Policy | [Problem] : There are no blocks for guiding the visually impaired, a decrease in the effective width of the sidewalk due to street lights, and steep crossing gradients. |
Maintenance items | Full renovation of the sidewalk 100m Partial renovation of the sidewalk Renovation of steps and gradients 2 locations Installation and renovation of blocks for guiding visually impaired persons Parts laid at intersections, etc. 9 new locations Intersections, etc. 2 locations Others Relocation of lighting columns, etc. |
Matters to be considered | Regarding the relocation of road lighting, adjustment with the relocation destination is required. The sidewalk maintenance needs to be coordinated with some roadside institutions. |
Route name | 2 In front of the Kaminogi district center |
---|---|
Business segments | In front of Life Oguchi store to Irie 2-chome intersection |
Business extension | 390m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Problem] : There are steep places where the slope of the pedestrian crossing is steep, a decrease in the effective width of the sidewalk by telephone box, and places where blocks for guiding the visually impaired has not been laid. |
Maintenance items | Partial renovation of the sidewalk Renovation of steps and gradients 8 locations Installation and renovation of blocks for guiding visually impaired persons Construction of parts such as intersections 10 new locations Intersections, etc. 3 locations |
Matters to be considered | The sidewalk maintenance needs to be coordinated with some roadside institutions. |
Route name | 3 In front of the post office |
---|---|
Business segments | Oguchi Station East Exit to Kotaki Bridge (Irie River) |
Business extension | 80m |
Project implementation period | From FY2015 to FY2016 |
Maintenance Policy | [Problem] : There are places where blocks for guiding visually impaired people are not laid. |
Maintenance items | Installation and renovation of blocks for guiding visually impaired persons Intersections, etc. 1 new location |
Route name | 4 Oguchi Station South Level Crossing |
---|---|
Business segments | Irie Crossing and Irie 2-chome intersection |
Business extension | 160m |
Project implementation period | From FY2015 to FY2016 |
Maintenance Policy | [Problem] : There are places where the vertical gradient is steep and places where blocks for guiding the visually impaired are not laid. |
Maintenance items | New sidewalk 10 m Partial renovation of the sidewalk 5 locations for steps and gradients Installation and renovation of blocks for guiding visually impaired persons Construction of parts such as intersections 10 new locations |
Route name | 5 Oguchi Station West Exit Rotary North |
---|---|
Business segments | Yokohama Oguchi Post Office~ Oguchi Station Square |
Business extension | 200m |
Project implementation period | From FY2012 to FY2013 |
Maintenance Policy | [Problem] : There are places where the effective width is not secured due to road lighting. In addition, there are places where continuous wavewaving sidewalks or blocks for guiding visually impaired people are not laid. |
Maintenance items | Widening of the sidewalk 50 m Complete renovation of sidewalk 210 m Partial renovation of the sidewalk Improvement of steps and rubbed gradients Installation and renovation of blocks for guiding visually impaired persons Continuous laying of route guidance 100 m Intersections, etc. 2 new locations Intersections, etc. 4 locations Others Relocation of lighting columns, etc. |
Matters to be considered | Regarding the relocation of road lighting, adjustment with the relocation destination is required. |
Route name | 6 In front of the Bank of Yokohama |
---|---|
Business segments | Oguchi-dori Intersection-Oguchi Station Square |
Business extension | 130m |
Project implementation period | From FY2012 to FY2013 |
Maintenance Policy | [Problem] : It is a steep slope of the pedestrian crossing and a lifestyle-related route (A), but it is not permeable pavement. In addition, there are places where blocks for guiding the visually impaired are not laid. |
Maintenance items | Complete renovation of sidewalk 210 m Installation and renovation of blocks for guiding visually impaired persons Intersections, etc. 1 new location |
Route name | 7 Oguchi-dori Shopping Street |
---|---|
Business segments | Oguchi-dori Intersection~ National Route 1 |
Business extension | 390m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Problem] : Blocks for guiding visually impaired persons have not been properly laid. In addition, there are obstacles near the block for guiding visually impaired people. |
Maintenance items | Partial renovation of the sidewalk 3 locations for steps and gradients Renovation of pavement material 120 m2 Installation and renovation of blocks for guiding visually impaired persons Continuous laying of route guidance 20 m Intersections, etc. 6 new locations Intersections, etc. 1 location |
Route name | 8 Oguchi 1st Avenue |
---|---|
Business segments | Nishi Koyasu Underground North Exit - National Route 1 |
Business extension | 220m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Problem] : There are places where the steps on the pedestrian crossing are high and places where there is unevenness on the sidewalk. |
Maintenance items | Partial renovation of the sidewalk 7 locations for steps and gradients |
Route name | 9 Koyasu Station Entrance |
---|---|
Business segments | Keihin Koyasu Station Entrance Intersection to Koyasu Station |
Business extension | 80m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Problem] : There is no block for guiding the visually impaired because there is no sidewalk set up just before the railroad crossing. |
Maintenance items | New sidewalk 10 m Partial renovation of the sidewalk 3 locations for steps and gradients Installation and renovation of blocks for guiding visually impaired persons Construction of parts such as intersections 4 new locations |
Route name | 10 Nishi Koyasu Underpass |
---|---|
Business segments | Nishi Koyasu Underpass |
Business extension | 40m |
Project implementation period | 2012 |
Maintenance Policy | [Problem] : The handrail in the underpass is one step, and there is no Braille indication. In addition, the block for guiding the visually impaired is severely deteriorated. |
Maintenance items | Installation and renovation of blocks for guiding visually impaired persons Continuous laying of route guidance 20 m Intersections, etc. 1 location Others Two renovations of stairs, etc. |
Route name | 11 Entrance to School for the Blind |
---|---|
Business segments | Part of the route from Oguchi Kobo No. 3 Contact TOMO near intersection to the Municipal Special Needs School for Blind |
Business extension | 230m |
Project implementation period | 2012 |
Maintenance Policy | [Problem] : There are places where the crossing gradient is steep, and places where blocks for guiding the visually impaired are aging and damaged. |
Maintenance items | Partial renovation of the sidewalk Refurbishment of steps and gradients 3 locations for crossing gradients Installation and renovation of blocks for guiding visually impaired persons Continuous laying repair of route guidance 30 m Intersections, etc. 3 locations |
Route name | 12 JR Oguchi Company's house west |
---|---|
Business segments | Part of the route from Oguchi Kobo No. 3 Contact TOMO near intersection to the Municipal Special Needs School for Blind |
Business extension | 120m |
Project implementation period | 2013 |
Maintenance Policy | [Problem] : There are places where blocks for guiding visually impaired people are aging and damaged. |
Maintenance items | Installation and renovation of blocks for guiding visually impaired persons Continuous laying repair of route guidance 10 m |
Route name | In front of school for the Blind |
---|---|
Business segments | Municipal School for the Blind-Orthopaedic surgery |
Business extension | 500m |
Project implementation period | 2013 |
Maintenance Policy | [Problem] : It is a route to a special support school for the blind, but there are many damaged areas because there is no sidewalk and a block for guiding the visually impaired is laid on one side of the road. |
Maintenance items | Installation and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 450 m Others One renovation of stairs, etc. |
Route name | 14 In front of Shonan Shinkin Bank |
---|---|
Business segments | Orthopaedic surgery Railroad Crossing |
Business extension | 200m |
Project implementation period | From FY2014 to FY2015 |
Maintenance Policy | [Problem] : There are places where the slope of the pedestrian crossing is steep, and there are places where blocks for guiding visually impaired people are not properly laid. |
Maintenance items | New sidewalk 2 m Partial renovation of the sidewalk 6 locations for steps and gradients Installation and renovation of blocks for guiding visually impaired persons New construction of intersections, etc. 12 locations |
Route name | 15 Oguchi Station West Exit Rotary South |
---|---|
Business segments | Signal intersection on the east side of Oguchi Station Square to Oguchi-dori Intersection |
Business extension | 100m |
Project implementation period | From FY2014 to FY2015 |
Maintenance Policy | [Problem] : Although it is a steep slope of the pedestrian crossing and a lifestyle-related route (A), there are not permeable pavement, and there are places where blocks for guiding the visually impaired is not laid. |
Maintenance items | Full renovation of the sidewalk 200 m Partial renovation of the sidewalk Improvement of steps and rubbed gradients Installation and renovation of blocks for guiding visually impaired persons Parts laid at intersections, etc. 7 new locations |
Route name | 16 In front of Oguchi Hospital |
---|---|
Business segments | Signal intersection on the east side of Oguchi-dori Intersection~ Yokohama Shinkin Bank Oguchi Branch |
Business extension | 80m |
Project implementation period | 2016 |
Maintenance Policy | [Problem] : There is no sidewalk, only roadside lines, and there is a lot of parking on the street. |
Maintenance items | Others Color belt laying 80 m |
Route name | 17 JR Ko Line Bridge |
---|---|
Business segments | Nanashimacho Intersection - Koyasu 1-chome intersection |
Business extension | 320m |
Project implementation period | From FY2015 to FY2016 |
Maintenance Policy | [Problem] : It is a route without a sidewalk, and there is no Braille destination sign on this line bridge. |
Maintenance items | Partial renovation of the sidewalk Refurbishment of steps and gradients Others Color belt laid 360 m Two renovations of stairs, etc. |
In order to promote "road specific business", we will show the following about the contents to work as a road manager.
- Utilizing city public relations magazines and websites, etc., we provide information on the business implementation status and initiatives for barrier-free.
- Regarding illegal private properties and illegal bicycle parking, etc., which hinder movement and narrow the effective width of the road, cooperation of roadside people and manners such as bicycle users are important, and guidance, removal, and promotion of bicycle parking lot use in the future Calls.
In addition, in order to form a walking space network where all people can travel safely and comfortably, each and every one understands each other, and related parties such as traffic managers, railway operators, road occupation companies, roadside residents, and roadside residents. Cooperation is required. Thank you very much for your cooperation.
For inquiries to this page
Road and Highway Bureau Road Department Facilities Division
Phone: 045-671-2731
Phone: 045-671-2731
Fax: 045-651-5443
Email address: do-shisetsu@city.yokohama.jp
Page ID: 621-843-853