Oguchi Station / Koyasu Station Area Road Specific Business Plan Text version of Yokohama City
Last Updated November 14, 2024
Around Oguchi Station and Koyasu Station, Yokohama City Road Specific Business Plan
1. Introduction
2. New Barrier-Free Law
3. Priority maintenance areas and routes for barrier-free
4. What is the Road Specific Business Plan?
5. Maintenance Policy
6. Maintenance plan
(1) Business plan for individual routes
(2) Routes subject to road specific business plans
7. Promotion of Road Specific Business Plan
In Yokohama City, following the enforcement of the "Law Concerning the Promotion of Smooth Movement of Elderly People and Disabled Persons (New Barrier-Free Law)" in December 2006, various barrier-free measures such as the formulation of basic plans are promoted. doing.
In December 2011, the city of Yokohama formulated the Basic Concept for Barrier-Free Areas around Oguchi Station and Koyasu Station, where cultural facilities, welfare facilities, commercial facilities and other facilities used by an unspecified number of people are concentrated as living bases in Kanagawa Ward.
In order to realize this basic concept, Kanagawa Ward and Road and Highway Bureau have formulated a Road-Specific Business Plan that specifies the details of the project and the expected period of implementation. In the future, we will implement the project based on this plan.
(1) What is the New Barrier-Free Law?
In order to improve the convenience and safety of mobility and facility use for the elderly, disabled, pregnant women, injured persons, etc., we will promote barrier-free by the following two major pillars.
- Promotion of barrier-free public transportation, buildings, public facilities, etc.
When constructing or introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each company / building We obligate facility installation managers such as owners to comply with the "barrier-free maintenance standards (moving facilitation standards)" established for each facility. In addition, efforts are imposed on these existing facilities to comply with the standards. - Promotion of barrier-free access to priority maintenance areas (*)
Municipalities are located in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and in areas where movement between facilities is usually performed on foot (priority maintenance areas), In order to promote barrier-free transportation such as public transportation, buildings, roads, off-street parking lots, city parks, traffic lights, etc., we can create a "barrier-free basic concept" in an integrated manner.
- ※ Priority maintenance areas
- The area of the entire district is less than 400ha, where there are three or more living-related facilities, and a considerable number of elderly people and persons with disabilities who use the facility can move between the facilities on foot. It is a district that is expected to be performed, and it is recognized that it is necessary to promote priority and integrated barrier-free. The boundaries of the priority maintenance area will be clearly displayed as much as possible by town boundaries, character boundaries, roads, rivers, railways, etc., city planning roads, etc.
(2) What is the Basic Concept of Barrier-Free?
In priority maintenance districts, to promote barrier-free public transportation such as railway stations, public facilities such as roads and parks, and public buildings used by the elderly, disabled, etc. It defines the range of priority maintenance districts, routes (life-related routes) to make barrier-free, and the contents of projects (specific projects, etc.) to be implemented for barrier-free.
In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out barrier-free in important point maintenance district. In Yokohama-shi, we carry out business in principle five years after basic design development.
In the "Basic Concept for Barrier-Free around Oguchi Station / Koyasu Station", "Life-related facilities" and "Life-related routes" are defined.
Life-related facilities
Facilities such as passenger facilities, government facilities, and welfare facilities used by the elderly and disabled in daily life or social life.
Mainly, (1) the facility is used by an unspecified number of people, including the elderly and the disabled, and (2) the means leading to the facility are mainly on foot from Oguchi Station and Koyasu Station. Facilities that meet the conditions.
Life-related routes
Routes between living-related facilities, especially those that need to be barrier-free.
In addition, life-related routes are classified into the following two categories according to the target maintenance level in the implementation of projects related to the maintenance of roads.
- Life-related routes (A)
- Among life-related routes, routes that carry out maintenance in line with the standards for facilitation such as movement based on the law and the maintenance standards of the Yokohama City Welfare Town Development Ordinance, or routes that have already been maintained along both standards, etc.
- Life-related routes (B)
- Of the life-related routes, due to local restrictions such as terrain and urbanization, it cannot be set to life-related routes A, but taking into account the road function and role of the route, travel based on the law as much as possible Routes to carry out maintenance in accordance with smoothing standards (set as Yokohama City's unique approach)
With "road specific business plan", road manager establishes the following matters along basic design in important point maintenance district established in basic design.
- "Road section" that implements road identification projects
- "Contents and scheduled implementation period" of road-specific projects to be implemented for each section
- Other "important matters to be considered" when implementing road-specific projects
(1) Target year
As a general rule, we will work toward the implementation of the business with the goal of 2016.
(2) Setting the maintenance level
We will set maintenance levels such as renovation in consideration of regional characteristics, current design, and surrounding roadside conditions. In order to implement effective maintenance
We plan cooperation and consistency with other companies and consider continuity of walking space.
(3) Main maintenance standards of the guidelines for smooth maintenance of road movement, etc.
Implemented maintenance based on "Guidelines for Smooth Movement of Roads" and "Yokohama City Welfare Town Development Ordinance Facility Maintenance Manual".
I'll do it.
We show plan as follows about route to carry out business to plan barrier-free mainly, integrally.
In addition, in order to make the plan more effective, the plan may be reviewed through coordination with other businesses or budgets.
Target routes and business plans are as follows:
Route name | 1 Entrance of God's Tree Park |
---|---|
Business Section | Jinnogi Park Entrance Intersection-Kaminogi Park Entrance |
Business extension | 380m |
Project implementation period | Fiscal 2015 to Fiscal 2016 |
Maintenance Policy | [Issues] : There are unlayed blocks for guiding visually impaired people, reduced the effective width of sidewalks due to street lights, and steep crossing gradients. |
Maintenance items | Complete renovation of the sidewalk 100m Partial renovation of the sidewalk Refurbishment of steps and slopes Laying and renovation of blocks for guiding visually impaired persons 9 new installations at intersections, etc. Two parts laying and renovations at intersections, etc. Others Relocation of lighting pillars, etc. |
Matters to be considered | Regarding the relocation of road lighting, coordination with the relocation destination is required. The maintenance of sidewalks requires coordination with some roadside institutions. |
Route name | 2 In front of the Kaminogi District Center |
---|---|
Business Section | Life Oguchi Store-Irie 2-chome Intersection |
Business extension | 390m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Issues] : There are steep slopes at the pedestrian crossing, a decrease in the effective width of the sidewalk due to telephone boxes, and unlayed blocks for guiding visually impaired people. |
Maintenance items | Partial renovation of the sidewalk 8 renovations of steps and slopes Laying and renovation of blocks for guiding visually impaired persons 10 new installations at intersections, etc. Partial laying and renovation at intersections, etc. 3 locations |
Matters to be considered | The maintenance of sidewalks requires coordination with some roadside institutions. |
Route name | 3 In front of the Oguchi Ekimae Post Office |
---|---|
Business Section | Oguchi Station East Exit to Kotaki Bridge (Iriegawa) |
Business extension | 80m |
Project implementation period | Fiscal 2015 to Fiscal 2016 |
Maintenance Policy | [Issues] : There are places where blocks for guiding visually impaired persons are not laid. |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons 1 new installation at intersections, etc. |
Route name | 4 Crossing on the south side of Oguchi Station |
---|---|
Business Section | Irie Railroad Crossing-Irie 2-chome Intersection |
Business extension | 160m |
Project implementation period | Fiscal 2015 to Fiscal 2016 |
Maintenance Policy | [Issues] : There are places where the longitudinal gradient is steep, and places where blocks for guiding visually impaired people are not laid. |
Maintenance items | New construction of sidewalk 10 m Partial renovation of the sidewalk 5 renovations of steps and slopes Laying and renovation of blocks for guiding visually impaired persons 10 new installations at intersections, etc. |
Route name | 5 Oguchi Station West Exit Rotary North |
---|---|
Business Section | Yokohama Oguchi Post Office-Oguchi Station Square |
Business extension | 200m |
Project implementation period | From FY2012 to FY2013 |
Maintenance Policy | [Issues] : There are places where the effective width is not secured by road lighting etc. In addition, there are places where there is no continuous wave sidewalk or block for guiding visually impaired people. |
Maintenance items | Width of sidewalk 50 m Complete renovation of the sidewalk 210 m Partial renovation of the sidewalk Refurbishment of steps and slopes Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 100 m Two new installations at intersections, etc. Partial laying and renovation at intersections, etc. 4 locations Others Relocation of lighting pillars, etc. |
Matters to be considered | Regarding the relocation of road lighting, coordination with the relocation destination is required. |
Route name | 6 In front of the Bank of Yokohama |
---|---|
Business Section | Oguchi-dori Intersection-Oguchi Station Square |
Business extension | 130m |
Project implementation period | From FY2012 to FY2013 |
Maintenance Policy | [Issues] : It is a steep slope of the pedestrian crossing, or a life-related route (A), but not a permeable pavement. In addition, there are unlayed blocks for guiding visually impaired persons. |
Maintenance items | Complete renovation of the sidewalk 210 m Laying and renovation of blocks for guiding visually impaired persons 1 new installation at intersections, etc. |
Route name | 7 Oguchi-dori Shopping Street |
---|---|
Business Section | Oguchi-dori Intersection-National Route 1 |
Business extension | 390m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Issues] : Blocks for guiding visually impaired persons have not been properly laid. In addition, there is an obstacle near the block for guiding visually impaired people that is continuously laid. |
Maintenance items | Partial renovation of the sidewalk Renovation of steps and slopes Renovation of pavement materials 120 m2 Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 20 m 6 new installations at intersections, etc. Partial laying and renovation at intersections, etc. |
Route name | 8 Large Exit 1st Street |
---|---|
Business Section | Nishi-Koyasu Underpass North Exit-National Route 1 |
Business extension | 220m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Issues] : There are places where there are high steps on the pedestrian crossing or where the sidewalk is uneven. |
Maintenance items | Partial renovation of the sidewalk Refurbishment of steps and slopes |
Route name | 9 Entrance of Koyasu Station |
---|---|
Business Section | Keihin Koyasu Station Entrance Intersection to Koyasu Station |
Business extension | 80m |
Project implementation period | From FY2013 to FY2014 |
Maintenance Policy | [Issues] : There is no sidewalk until just before the railroad crossing, so there is no block for guiding the visually impaired. |
Maintenance items | New construction of sidewalk 10 m Partial renovation of the sidewalk Renovation of steps and slopes Laying and renovation of blocks for guiding visually impaired persons 4 new installations at intersections, etc. |
Route name | 10 Nishi Koyasu Underpass |
---|---|
Business Section | Nishi-Koyasu Underpass |
Business extension | 40m |
Project implementation period | 2012 |
Maintenance Policy | [Issues] : The railing in the underpass is one step, and there is no Braille display. In addition, the block for guiding visually impaired persons is severely degraded. |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 20 m Partial laying and renovation at intersections, etc. Others Renovation of stairs, etc. |
Route name | 11 Entrance to School for the Blind |
---|---|
Business Section | Part of the route from the intersection near Oguchi Kobo No. 3 Fureai TOMO to the Municipal Special Needs School for the Blind |
Business extension | 230m |
Project implementation period | 2012 |
Maintenance Policy | [Issues] : There are places where the crossing slope is steep, and places where the block for guiding the visually impaired is aging and damaged. |
Maintenance items | Partial renovation of the sidewalk Refurbishment of steps and slope 3 renovations of crossing gradients Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 30 m Partial laying and renovation at intersections, etc. 3 locations |
Route name | 12 JR Oguchi Company |
---|---|
Business Section | Part of the route from the intersection near Oguchi Kobo No. 3 Fureai TOMO to the Municipal Special Needs School for the Blind |
Business extension | 120m |
Project implementation period | 2013 |
Maintenance Policy | [Issues] : There are places where the block for guiding visually impaired persons is aging and damaged. |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 10 m |
Route name | 13 In front of the School for the Blind |
---|---|
Business Section | Municipal Special Needs School for the Blind: Orthopaedic surgery Takahashi |
Business extension | 500m |
Project implementation period | 2013 |
Maintenance Policy | [Issues] : Although it is a route to the special needs school for the blind, there are many damaged areas because there is no sidewalk and blocks for guiding the visually impaired are laid on one side of the road. |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 450 m Others 1 renovation of stairs, etc. |
Route name | 14 In front of Shonan Shinkin Bank |
---|---|
Business Section | Takahashi Orthopaedic surgery-mae to Irie railroad crossing |
Business extension | 200m |
Project implementation period | From FY2014 to FY2015 |
Maintenance Policy | [Issues] : There are places where the slope of the pedestrian crossing is steep, and places where blocks for guiding visually impaired persons are not properly laid. |
Maintenance items | New construction of sidewalk 2 m Partial renovation of the sidewalk 6 renovations of steps and slopes Laying and renovation of blocks for guiding visually impaired persons Partial laying at intersections, etc. 12 new locations |
Route name | 15 Oguchi Station West Exit Rotary South |
---|---|
Business Section | Signal intersection on the east side of Oguchi Station Square-Oguchi Dori Intersection |
Business extension | 100m |
Project implementation period | From FY2014 to FY2015 |
Maintenance Policy | [Issues] : Although it is a steep slope at the pedestrian crossing and a life-related route (A), there are not permeable pavement, and there are unlayed blocks for guiding visually impaired people. |
Maintenance items | Complete renovation of the sidewalk 200 m Partial renovation of the sidewalk Refurbishment of steps and slopes Laying and renovation of blocks for guiding visually impaired persons 7 new installations at intersections, etc. |
Route name | 16 In front of a large hospital |
---|---|
Business Section | Signal Intersection on the east side of Oguchi-dori Intersection-Yokohama Shinkin Bank Oguchi Branch |
Business extension | 80m |
Project implementation period | 2016 |
Maintenance Policy | [Issues] : There is no sidewalk, only the roadside line, and it is a route with many street parking. |
Maintenance items | Others Installation of color belt 80 m |
Route name | 17 JR Ko Line Bridge |
---|---|
Business Section | Nanashimacho Intersection-Koyasu 1-chome Intersection |
Business extension | 320m |
Project implementation period | Fiscal 2015 to Fiscal 2016 |
Maintenance Policy | [Issues] : It is a route without a sidewalk, and there is no Braille destination indication on this bridge. |
Maintenance items | Partial renovation of the sidewalk Refurbishment of steps and slope Others Installation of color belt 360 m Renovation of stairs, etc. |
We show the following about contents to work on as road manager to promote "road specific business".
- Utilizing city public relations magazines and websites, we provide information on the status of business implementation and approaches for barrier-free.
- About illegal private property or illegal bicycle parking that hinders movement and narrows the effective width of the road, cooperation of roadside people and manners such as cyclists are important, and guidance, removal, promotion of bicycle parking lot use will be promoted in the future And so on.
In addition, in order to form a walking space network that allows everyone to move safely and comfortably, each person should understand each other and related parties such as traffic managers, railway operators, road occupants, roadside residents, etc. Cooperation is required. Thank you very much for your cooperation.
Inquiries to this page
Road and Highway Bureau Road Department Facilities Division
Telephone: 045-671-2731
Telephone: 045-671-2731
Fax: 045-550-3376
Email address: do-shisetsu@city.yokohama.lg.jp
Page ID: 621-843-853