Menu

Close

Here's the text.

Hoshikawa Station, Tennocho Station, Hodogaya Station Area Road Specific Business Plan Text version

Last Updated November 8, 2024

Area Road Specific Business Plan around Hoshikawa Station, Tennocho Station, Hodogaya Station, Yokohama City <Developed in March 2020>

1.Introduction

In Yokohama City, following the enforcement of the Barrier-Free Law (Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons) in December 2006, everyone can conduct independent daily and social life We are promoting barrier-free measures to create an environment where people can do it.
In fiscal 2010, Hodogaya Ward formulated the Basic Plan for Barrier-Free Areas around Hoshikawa Station and promoted barrier-free areas around stations. Approximately eight years have passed since the formulation of this basic concept, and we will review it to build a further barrier-free environment based on the results and achievements so far, and develop barrier-free areas around Tennocho Station and Hodogaya Station. We decided to consider a new basic concept.
This time, in order to realize this new basic concept, we have formulated the "Hoshikawa Station, Tennocho Station, and Hodogaya Station Area Road Specific Business Plan in Yokohama City".
In the future, we will implement the project based on this plan.

2.Framework of Barrier-Free Law

(1) What is the Barrier-Free Law?

In order to improve the convenience and safety of mobility and facility use for the elderly, disabled, pregnant women, injured persons, etc., we will promote barrier-free by the following two major pillars.

Promotion of barrier-free public transportation, buildings, public facilities, etc.

When constructing or introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each company / building We obligate facility installation managers such as owners to comply with the "barrier-free maintenance standards (moving facilitation standards)" established for each facility. In addition, efforts are imposed on these existing facilities to comply with the standards.

Promotion of barrier-free facilities in priority areas

Municipalities are based on the Barrier-Free Law, in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and the movement between facilities is usually performed on foot (important maintenance area), we will formulate the "Barrier-Free Basic Concept" in order to promote barrier-free public transportation, buildings, roads, off-street parking lots, city parks, traffic lights, etc. with emphasis and integrally.

(2) What is the Basic Concept of Barrier-Free?

In priority maintenance districts, in order to promote barrier-free public transportation such as railway stations, public facilities such as roads and parks, and public buildings used by elderly people with disabilities, etc. It defines the range of priority maintenance districts and the contents of projects (specific projects, etc.) that should be implemented for barrier-free facilities.
In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out business of barrier-free in important point maintenance district.
In Yokohama-shi, we carry out business in principle five years after basic design development.

3.Priority maintenance areas and routes for barrier-free

In the Hodogaya-ku Barrier-Free Basic Concept, in the area around Hoshikawa Station, Tennocho Station, and Hodogaya Station, priority maintenance areas, life-related facilities, and life-related routes are defined.

What are life-related facilities?

Facilities such as passenger facilities, government facilities, and welfare facilities used by the elderly and disabled in daily life or social life.
Mainly, (1) the facility is used by an unspecified number of people, including the elderly and the disabled, and (2) the means leading to the facility are mainly Hoshikawa Station, Tennocho Station, Hodogaya Station. Facilities that meet the conditions of walking from.

What is a life-related route?

Of the routes between living-related facilities, it is particularly vulnerable to barrier-free, and is classified into "life-related routes (A)" and "life-related routes (B)" according to the target maintenance level. .

Life-related routes (A)

Of the lifestyle-related routes, routes that carry out maintenance in accordance with the standards for facilitating movement, etc. based on the Barrier-Free Law, or routes that have already been maintained in accordance with the standards.

Life-related routes (B)

Due to local restrictions such as topography and urbanization among the lifestyle-related routes, it cannot be set to Life-related Route A, but taking into account the road function and role of the route, movement based on the Barrier-Free Law as much as possible Routes to carry out maintenance in accordance with smoothing standards (set as Yokohama City's unique approach)

4.What is the Road Specific Business Plan?

With "road specific business plan", road manager establishes the following matters along basic design in important point maintenance district established in basic design.

  • "Road section" that implements road identification projects
  • "Contents and scheduled implementation period" of road-specific projects to be implemented for each section
  • Other "important matters to be considered" when implementing road-specific projects

5.Maintenance Policy

(1) Target year

As a general rule, maintenance will be carried out with the goal of FY2024.

(2) Setting the maintenance level

We will set maintenance levels such as renovation in consideration of regional characteristics, current design, and surrounding roadside conditions. In addition, in order to carry out effective maintenance, we plan cooperation and consistency with other companies and consider continuity of walking space.

(3) Business scope of the target route

In consideration of the network between living-related facilities, the business scope of the target route was set.

(4) Major maintenance standards

We carry out maintenance based on standard to establish in "the regulations about standard of structure of road necessary for smoothness such as Yokohama-shi movement" and "town development regulations of Yokohama-shi welfare".

6.Maintenance plan

In order to achieve barrier-free priority and integrally, we plan the following routes to carry out the business. In addition, we may carry out review of plan by adjustment and budget with other companies.

(1) Area around Hoshikawa Station

1) Business plan for individual routes
2) Routes subject to road specific business plans

Target routes and business plans are as follows:

Life-related routes (A)
Route name4 City Road Tsurugamine Tennocho Line Route 7147
Business SectionIn front of the Hodogaya Ward Office
Business extension70m
Project implementation period2021
Maintenance Policy[Issues]
A mistake has occurred in the block for guiding visually impaired persons (linear block) at the pedestrian crossing.
Intersections and blocks for guiding visually impaired people in route guidance are degraded or damaged.

[Measures]
The position of the block for guiding the visually impaired (line block) will be renovated to the center of the pedestrian crossing.
Renovation of intersections and blocks for guiding visually impaired people in route guidance.
Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 80m
Partial laying and renovation at intersections, etc. 5 locations
Life-related routes (B)
Route name5 City Road Tsurugamine Tennocho Line Route 7147
Business SectionIntersection in front of Hodogaya Ward Hall to Kawabe Koenmae Intersection
Business extension200m
Project implementation period2022
Maintenance Policy

[Issues]
When planted due to the rise of trees, there is a step on the sidewalk.
[Measures]
We will repair the planting masu.

Maintenance itemsOthers
6 renovations of planting masu
Life-related routes (B)
Route name10 City Road Hoshikawa Iwama Line Route 7143
Business SectionHoshikawa Elementary School Bus Stop-Hoshikawa Station Entrance Intersection
Business extension400m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
A telephone pole is installed on the shoulder of the road, which hinders walking.
[Measures]
We will consider the relocation of telephone poles.

Maintenance itemsOthers
Relocation of telephone poles, etc. 29 locations
Implementation of the Project
Care should be taken
Important matters
The relocation of telephone poles requires coordination with the relocation destination.
Life-related routes (B)
Route name12 City Road Hoshikawa Iwama Line Route 7143
Business SectionHoshikawa-cho intersection-in front of the tree nursery school
Business extension235m
Project implementation periodFiscal 2023-FY2024
Maintenance Policy

[Issues]
Blocks (gray) for guiding visually impaired persons that do not conform to JIS standards are installed at pedestrian crossings and windings.
The width of the sidewalk is narrow and some sidewalks are not installed.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Consider securing a walking space and maintain the sidewalk.

Maintenance itemsSecuring walking space
Width of sidewalk 242m
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 3 locations
Implementation of the Project
Care should be taken
Important matters
In implementing the sidewalk widening project, it is necessary to consult with related organizations and adjust the height with private land.
Life-related routes (A)
Route name16 City Road Mitsuzawa Route 306
Business SectionInageya Yokohama Hoshikawa Ekimae Store-Hoshikawa Bridge
Business extension80m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
The humanitarian bridge installed at Hoshikawa Bridge is not barrier-free (staircase format), and pedestrians are passing through the road.
There are no handrails on the stairs.
[Measures]
Review the operation form of Hoshikawa Bridge and secure barrier-free walking space.
A two-step handrail will be installed on the stairs.

Maintenance itemsRenovation of road structure
Renovation of roadways 493㎡
Renovation of sidewalks
Partial renovation 27㎡
Others
Renovation of stairs, etc.
Implementation of the Project
Care should be taken
Important matters
The operation of the Hoshikawa Bridge is currently under discussion.
Life-related routes (A)
Route name17 City Road Tennocho Route 5
Business SectionFrom Hoshikawa Station Entrance Intersection to Hoshikawa Station
Business extension110m
Project implementation period2021
Maintenance Policy

[Issues]
There is no block for guiding the visually impaired at the intersection.
[Measures]
A block for guiding visually impaired persons will be installed at the intersection.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
6 new installations at intersections, etc.
Life-related routes (A)
Route name18 City Road Mitsuzawa Route 307
Business SectionNorth Exit of Hoshikawa Station to Hodogaya Ward Hall Intersection
Business extension70m
Project implementation period2021
Maintenance Policy

[Issues]
There is a degraded or damaged block for guiding visually impaired people in route guidance.
There are degraded and damaged parts of the sidewalk pavement.
[Measures]
Refurbished blocks for guiding visually impaired people.
The sidewalk pavement will be renovated.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 68m
Others
Consideration of pavement renovation
Life-related routes (B)
Route name22 City Road Tennocho Route 12
Business SectionDomae, Hodogaya Public Association, Yokohama
Business extension50m
Project implementation period2022
Maintenance Policy

[Issues]
There is a deterioration or damage of the block for guiding the visually impaired at the pedestrian crossing. Also, the installation position of the block is not appropriate.
[Measures]
In conjunction with the renovation of the block for guiding the visually impaired, a block will be installed at an appropriate position (crosswalk width).

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Two parts laying and renovations at intersections, etc.
Life-related routes (B)
Route name23 City Road Tennocho Route 12
Business SectionIntersection in front of Yanagibashi-Kawabe-Koen
Business extension115m
Project implementation period2022
Maintenance Policy

[Issues]
There is no block for guiding the visually impaired (dotted block) above and below the stairs.
There are degraded and damaged parts of the sidewalk pavement.
When planted due to the rise of trees, there is a step on the sidewalk.
[Measures]
A block for guiding visually impaired persons (dotted blocks) is installed above and below the stairs.
The sidewalk pavement will be renovated.
We will repair the planting masu.

Maintenance itemsRenovation of sidewalks
Complete renovation 146m
Laying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 5m
Others
Renovation of planting masu 10 places
Implementation of the Project
Care should be taken
Important matters
Regarding the mounting part in front of Yanagibashi, we will consider correcting along with the improvement of the surrounding area.
Life-related routes (B)
Route name24 City Road Mitsuzawa Route 317
Business SectionIntersection in front of Kawabe Park - Lions Mansion Yokohama Hoshikawa-mae
Business extension75m
Project implementation period2022
Maintenance Policy

[Issues]
There is no block for guiding the visually impaired at the pedestrian crossing.
[Measures]
A block for guiding visually impaired persons will be installed at the pedestrian crossing.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 6m
Life-related routes (A)
Route name25 City Road Tennocho Routes 24 and 93
Business SectionIntersection in front of the nursery school and in front of the mailer elementary school
Business extension200m
Project implementation period2021
Maintenance Policy

[Issues]
Blocks (gray) for guiding visually impaired persons that do not conform to JIS standards are installed at pedestrian crossings and windings.
There is no block for guiding the visually impaired at the pedestrian crossing.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
A block for guiding visually impaired persons will be installed at the pedestrian crossing.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Partial laying at intersections, etc. New construction 1 Partial laying at intersections, etc. 3
Life-related routes (B)
Route name26 City Road Tennocho Routes 24 and 93
Business SectionFrom the intersection in front of Mailiko Elementary School to Aeon Tennocho
Business extension250m
Project implementation period2022
Maintenance Policy

[Issues]
Blocks (gray) for guiding visually impaired persons that do not conform to JIS standards are installed at pedestrian crossings and windings.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes (A)
Route name27 City Road Tennocho Route 17
Business SectionIn front of Aeon Tennocho
Business extension60m
Project implementation period2021
Maintenance Policy

[Issues]
When planted due to the rise of trees, there is a step on the sidewalk.
[Measures]
We will repair the planting masu.

Maintenance itemsOthers
9 renovations of planting masu

(2) Area around Tennocho Station

1) Business plan for individual routes
2) Routes subject to road specific business plans

Target routes and business plans are as follows:

Life-related routes (A)
Route name1 City Road Tennocho Route 39
Business SectionIn front of Western Youth Plaza Happy Square to Tennocho Park
Business extension140m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed in the winding section.
The grating lid usually has an eyelash.
Due to the narrow space between the entrance of the vehicle on the sidewalk and the short section of the general section, the sidewalk is often undulations, hindering walking.
There are places where it is necessary to ensure the safety of pedestrians.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the grating lid in fine detail.
The sidewalk boundary block will be renovated.
A car stop will be installed on the pedestrian crossing.

Maintenance itemsRenovation of sidewalks
Partial renovation 41㎡
Renovation of apron block 28m
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 5 locations
Others
2 new construction and improvement of car stops
Life-related routes (B)
Route name2 City Road Tennocho Route 42
Business SectionTennocho Park-Matsubara Shopping Street
Business extension130m
Project implementation periodFY2021 to FY2022
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed in the winding section.
Due to the narrow space between the entrance of the vehicle on the sidewalk and the short section of the general section, the sidewalk is often undulations, hindering walking.
A telephone pole is installed on a narrow sidewalk, which hinders walking.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
The sidewalk boundary block will be renovated.
We will consider the relocation of telephone poles.

Maintenance itemsRenovation of sidewalks
Partial renovation 17㎡
Renovation of apron block 9m
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 7 locations
Others
Relocation of telephone poles, etc.
Implementation of the Project
Care should be taken
Important matters
Relocation of telephone poles requires coordination with the relocation destination.
Life-related routes (A)
Route name3 City Road Tennocho Route 20
Business SectionIn front of Aeon Tennocho Store-in front of Horiuchi Pharmacy
Business extension145m
Project implementation period2021
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
There is no block for guiding the visually impaired at the intersection.
[Measures]
Replace or install it in a block for guiding visually impaired persons that conform to JIS standards.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
8 new installations at intersections, etc.
Partial laying and renovation at intersections, etc. 3 locations
Life-related routes (A)
Route name5 City Road Tennocho Route 20
Business SectionSilk Road Tennocho
Business extension150m
Project implementation period2021
Maintenance Policy

[Issues]
There are degraded and damaged parts of the sidewalk pavement.
A block for guiding visually impaired persons whose use is unknown is installed.
[Measures]
The sidewalk pavement will be renovated.
Remove blocks for guiding visually impaired persons.

Maintenance itemsRenovation of sidewalks
Partial renovation 120㎡
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc.
Life-related routes (A)
Route name7 City Road Tennocho Route 96
Business SectionIn front of Mailiko Elementary School to Yokohama Business Park
Business extension355m
Project implementation period2021
Maintenance Policy

[Issues]
Blocks for guiding visually impaired persons that do not conform to JIS standards are installed at intersections and pedestrian crossings.
A car stop is installed in the center of the pedestrian crossing, blocking the walking traffic line.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Rehabilitate the car stop to an appropriate position.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 6 locations
Others
New construction and improvement of car stoppers 6 locations
Life-related routes (B)
Route name9 City Road Tennocho Route 160
Business SectionIn front of Yokohama Business Park - Kobe-cho Eastern Neighborhood Associationskan
Business extension90m
Project implementation period2022
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
The grating lid usually has an eyelash.
There are degraded or damaged parts of the apron block.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the grating lid in fine detail.
Alter the apron block.

Maintenance itemsRenovation of sidewalks
Renovation of apron block 9m
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes (B)
Route name10 City Road Tennocho Route 162
Business SectionFormer Furumachi Bridge Ruins-Tennocho Station Park
Business extension250m
Project implementation period2022
Maintenance Policy

[Issues]
Blocks for guiding visually impaired persons that do not conform to JIS standards are installed at intersections and pedestrian crossings.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
In order to guide from Tennocho Station to the bus stop, a block for guiding visually impaired persons (line block) will be installed.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 15m
Partial laying and renovation at intersections, etc. 4 locations
Life-related routes (A)
Route name11 City Road Hoshikawa Iwama Line Route 7143
Business SectionHodogaya Public Works Office Entrance Intersection
Business extension270m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
A car stop is installed in the center of the pedestrian crossing, blocking the walking traffic line.
There are degraded and damaged parts in the vehicle entrance on the sidewalk.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Rehabilitate the car stop to an appropriate position.
The sidewalk pavement will be renovated.

Maintenance itemsRenovation of sidewalks
Securing flat parts 3 locations
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 2m
9 parts laying and renovations at intersections, etc.
Others
New construction and improvement of car stoppers 6 locations
Implementation of the Project
Care should be taken
Important matters
It is necessary to coordinate with related parties to secure the flat part.
Life-related routes (A)
Route name12 City Road Hoshikawa Iwama Line Route 7143
Business SectionHodogaya Public Works Office Entrance Intersection - Shinmei-shamae Intersection
Business extension145m
Project implementation period2021
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
A car stop is installed in the center of the pedestrian crossing, blocking the walking traffic line.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Rehabilitate the car stop to an appropriate position.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 5 locations
Others
New construction and improvement of car stoppers
Life-related routes (A)
Route name13 City Road Hoshikawa Iwama Line Route 7143
Business SectionShinmei-sha-mae intersection to Daimon-dori intersection
Business extension160m
Project implementation period2021
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
There is no block for guiding the visually impaired at the intersection.
[Measures]
Replace or install it in a block for guiding visually impaired persons that conform to JIS standards.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
1 new installation at intersections, etc.
Partial laying and renovation at intersections, etc. 5 locations
Life-related routes (B)
Route name15 City Road Tennocho Route 97
Business SectionIn front of Neighborhood Associationskan in the eastern part of Kobe-cho to the former Furumachi site
Business extension45m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
The standard for the sidewalk boundary block at the pedestrian crossing is not appropriate.
The sidewalk is not well maintained, which hinders walking.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the pedestrian road boundary block with a standard suitable for pedestrian crossings.
Consider securing a walking space and maintain the sidewalk.

Maintenance itemsSecuring walking space
Width of sidewalk 40m
Renovation of sidewalks
Renovation of apron block 5m
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 4 locations
Implementation of the Project
Care should be taken
Important matters
The widening of the sidewalk will be considered at the time of conversion of private land.
Life-related routes (B)
Route name16 City Road Tennocho Routes 26 and 97
Business SectionFormer Furumachi site-in front of Horiuchi pharmacy
Business extension390m
Project implementation period2022
Maintenance Policy

[Issues]
There are no blocks for guiding visually impaired people at pedestrian crossings and intersections. Also, the installation position is inappropriate.
[Measures]
Install and renovate blocks for guiding visually impaired people at pedestrian crossings and intersections.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
5 new installations at intersections, etc.
Partial laying and renovation at intersections, etc.
Life-related routes (B)
Route name19 City Road Tennocho Routes 108, 113
Business SectionTennocho Station North Exit-In front of the Fifth Seto Building
Business extension220m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
Blocks for guiding visually impaired persons that do not conform to JIS standards are installed at intersections and winding sections.
There are deterioration and damage to the pavement of the bridge roadway.
There are degraded and damaged parts of the sidewalk pavement.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
The roadway pavement of the bridge will be renovated.
The sidewalk pavement will be renovated.

Maintenance itemsRenovation of road structure
Renovation of roadways 181㎡
Renovation of sidewalks
Partial renovation 26㎡
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 17 locations
Life-related routes (B)
Route name20 City Road Tennocho Route 61
Business SectionIn front of Kadoichi Building - in front of Diamond Tennocho Building
Business extension120m
Project implementation period2020
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed in the winding section.
The grating lid usually has an eyelash.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the grating lid in fine detail.

Maintenance itemsRenovation of sidewalks
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 8 locations
Life-related routes (A)
Route name21 City Road Hodogaya Station Asama Line Route 7140
Business SectionDaimon-dori Intersection to Tennocho Ekimae Park
Business extension240m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
Blocks for guiding visually impaired persons that do not conform to JIS standards are installed at intersections and winding sections.
The block for guiding the visually impaired at the bus stop is installed in an inappropriate position.
There are degraded and damaged parts of the sidewalk pavement.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Refurbish the block for guiding visually impaired persons at the bus stop to an appropriate position.
The sidewalk will be completely renovated.

Maintenance itemsRenovation of sidewalks
Complete renovation 467m
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 129m
Partial laying and renovation at intersections, etc. 12 locations
Life-related routes (B)
Route name22 City Road Hodogaya Station Asama Line Route 7140
Business SectionIn front of Tennocho Station Park
Business extension45m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
A block for guiding visually impaired persons that does not conform to JIS standards is installed in the winding section.
The grating lid usually has an eyelash.
There are degraded and damaged parts of the sidewalk pavement.
When planted due to the rise of trees, there is a step on the sidewalk.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the grating lid in fine detail.
The sidewalk pavement will be completely renovated.

Maintenance itemsRenovation of sidewalks
Complete renovation 79m
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 39m
Partial laying and renovation at intersections, etc. 5 locations
Life-related routes (B)
Route name23 City Road Hodogaya Station Asama Line Route 7140
Business SectionIn front of Tennocho Station Park to Inamura Building
Business extension270m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
Blocks for guiding visually impaired persons that do not conform to JIS standards are installed at intersections and winding sections.
The grating lid usually has an eyelash.
There are degraded and damaged parts of the sidewalk pavement.
There are degraded or damaged parts of the apron block.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
Replace the grating lid in fine detail.
The sidewalk will be completely renovated.
Alter the apron block.

Maintenance itemsRenovation of sidewalks
Complete renovation 492m
Renovation of apron block 19m
Refurbishment of drainage facilities
Laying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 39m
Partial laying and renovation at intersections, etc. 15 locations
Others
Consideration of protective fence installation 540m
Implementation of the Project
Care should be taken
Important matters
The installation of protective fences will be considered according to land use (roadside conditions).
Part of the sidewalk will be maintained in accordance with the continuous grade separation project.

(3) Area around Hodogaya Station

1) Business plan for individual routes
2) Routes subject to road specific business plans

Target routes and business plans are as follows:

Life-related routes (A)
Route name3 City Road Hodogaya Station Asama Line Route 7140
Business SectionIwamacho "Koban" (police box) Intersection - Hodogaya Station West Exit Traffic Plaza
Business extension215m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
A block (gray) for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
There is no block for guiding the visually impaired at the pedestrian crossing.
There are steps on the sidewalk due to deterioration and damage of the pavement and the rise of planting masu.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
A block for guiding visually impaired persons will be installed at the pedestrian crossing.
The sidewalk will be completely renovated.

Maintenance itemsRenovation of sidewalks
Complete renovation 332m
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 8m
1 new installation at intersections, etc.
Partial laying and renovation at intersections, etc. 11 locations
Life-related routes (A)
Route name4 City Road Hodogaya Station Asama Line Route 7140
Business SectionIwamacho "Koban" (police box) Intersection - Daimon Street Intersection
Business extension320m
Project implementation periodFY2022 to FY2023
Maintenance Policy

[Issues]
A block (gray) for guiding visually impaired persons that does not conform to JIS standards is installed at the intersection.
There are steps on the sidewalk due to deterioration and damage of the pavement and the rise of planting masu.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
The sidewalk will be completely renovated.

Maintenance itemsRenovation of sidewalks
Complete renovation 640m
Laying and renovation of blocks for guiding visually impaired persons
Partial laying and renovation at intersections, etc. 7 locations
Life-related routes (B)
Route name5 National Route 1
Business SectionHodogaya Station East Exit Bus Terminal Exit Intersection - Subaru Nursery School
Business extension285m
Project implementation periodFY2020 to FY2023
Maintenance Policy

[Issues]
The position of the block for guiding the visually impaired at the pedestrian crossing is not appropriate.
There is no block for guiding the visually impaired (line block) to the bus stop on National Route 1.
There are degraded and damaged parts of the sidewalk pavement.
There is no flatness in the pedestrian crossing.
[Measures]
Renovate the block for guiding the visually impaired at the pedestrian crossing to an appropriate position.
Install a block (line block) for guiding visually impaired people from the pedestrian crossing to the bus stop.
The sidewalk pavement will be renovated.
Secure a flat part in the pedestrian crossing.

Maintenance itemsRenovation of sidewalks
Partial renovation 64㎡
Securing flat parts 2 locations
Laying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 46m
Partial laying and renovation at intersections, etc.
Implementation of the Project
Care should be taken
Important matters
The renovation of the sidewalk should be coordinated with the Urban Development Bureau, including the construction of the site of the former Hodogaya Prefectural Tax Office.
Life-related routes (B)
Route name10 Hodogaya Station East Exit Pedestrian Bridge
Business SectionHodogaya Station East Exit to Hodogaya Station East Exit Traffic Plaza
Business extension140m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
There is no barrier-free route for up and down movement of Hodogaya Station East Exit Pedestrian Bridge and Hodogaya Station East Exit Traffic Plaza.
[Measures]
Install elevators and blocks for guiding visually impaired people to guide them to elevators.

Maintenance itemsLaying and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 15m
Others
1 new elevator
Life-related facilities
Route nameHodogaya Station West Exit Traffic Plaza
Business SectionHodogaya Station West Exit Traffic Plaza
Business extension177m
Project implementation periodFY2020 to FY2024
Maintenance Policy

[Issues]
The position of the block for guiding the visually impaired at the pedestrian crossing is not appropriate.
There is no block for guiding the visually impaired at the pedestrian crossing.
There are deterioration of sidewalk pavement, apron block, and damaged parts.
[Measures]
Renovate the block for guiding the visually impaired at the pedestrian crossing to an appropriate position.
A block for guiding visually impaired persons will be installed at the pedestrian crossing.
The sidewalk will be completely renovated.
Alter the apron block.

Maintenance itemsRenovation of sidewalks
Complete renovation 239m
Renovation of apron block 4m
Laying and renovation of blocks for guiding visually impaired persons
7 new installations at intersections, etc.
Partial laying and renovation at intersections, etc. 3 locations
Life-related facilities
Route nameHodogaya Station East Exit Traffic Plaza
Business SectionHodogaya Station East Exit Traffic Plaza
Business extension163m
Project implementation periodFY2020 to FY2021
Maintenance Policy

[Issues]
Blocks (gray) for guiding visually impaired persons that do not conform to JIS standards are installed.
There are degraded and damaged parts of the pavement.
[Measures]
Replace with blocks for guiding visually impaired persons that conform to JIS standards.
The pavement will be completely renovated.

Maintenance itemsRenovation of sidewalks
Complete renovation 163m
Laying and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 164m
Partial laying and renovation at intersections, etc. 4 locations
Implementation of the Project
Care should be taken
Important matters
A block for guiding visually impaired people will be installed according to the bus and taxi platform.

7.Promotion of Road Specific Business Plan

We show the following about contents to work on as road manager to promote "road specific business".

  • Utilizing websites, etc., we will provide information on the status of barrier-free business implementation and initiatives.
  • We perform instruction, removal to cancel illegal private use article to narrow effective width of road and to prevent illegally occupied bicycles which hinder traffic and call for use of bicycle parking lot.

In order to form a walking space network that allows everyone to move safely and comfortably, the cooperation of traffic managers, railway operators, road occupants, roadside residents, etc. is required. Thank you very much for your cooperation.

Inquiries to this page

Road and Highway Bureau Road Department Facilities Division

Telephone: 045-671-2731

Telephone: 045-671-2731

Fax: 045-550-3376

Email address: do-shisetsu@city.yokohama.lg.jp

Return to the previous page

Page ID: 483-179-056

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews