- Yokohama-shi Top Page
- Living and Procedures
- Community Development and Environment
- Roads
- Safety facilities
- Creating a Road that is Friendly to People
- Barrier-free business for roads in Yokohama City
- About road specific business plan
- Hoshikawa Station, Tennocho Station, Hodogaya Station Area Road Specific Business Plan Text version
Here's the text.
Hoshikawa Station, Tennocho Station, Hodogaya Station Area Road Specific Business Plan Text version
Last Updated November 8, 2024
Area Road Specific Business Plan around Hoshikawa Station, Tennocho Station, Hodogaya Station, Yokohama City <Developed in March 2020>
1. Introduction
2. Framework of Barrier-Free Law
3. Priority maintenance areas and routes for barrier-free
4. What is the Road Specific Business Plan?
(1) Area around Hoshikawa Station
1) Business plan for individual routes
2) Routes subject to road specific business plans
(2) Area around Tennocho Station
1) Business plan for individual routes
2) Routes subject to road specific business plans
(3) Area around Hodogaya Station
1) Business plan for individual routes
1.Introduction
In Yokohama City, following the enforcement of the Barrier-Free Law (Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons) in December 2006, everyone can conduct independent daily and social life We are promoting barrier-free measures to create an environment where people can do it.
In fiscal 2010, Hodogaya Ward formulated the Basic Plan for Barrier-Free Areas around Hoshikawa Station and promoted barrier-free areas around stations. Approximately eight years have passed since the formulation of this basic concept, and we will review it to build a further barrier-free environment based on the results and achievements so far, and develop barrier-free areas around Tennocho Station and Hodogaya Station. We decided to consider a new basic concept.
This time, in order to realize this new basic concept, we have formulated the "Hoshikawa Station, Tennocho Station, and Hodogaya Station Area Road Specific Business Plan in Yokohama City".
In the future, we will implement the project based on this plan.
2.Framework of Barrier-Free Law
(1) What is the Barrier-Free Law?
In order to improve the convenience and safety of mobility and facility use for the elderly, disabled, pregnant women, injured persons, etc., we will promote barrier-free by the following two major pillars.
Promotion of barrier-free public transportation, buildings, public facilities, etc.
When constructing or introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each company / building We obligate facility installation managers such as owners to comply with the "barrier-free maintenance standards (moving facilitation standards)" established for each facility. In addition, efforts are imposed on these existing facilities to comply with the standards.
Promotion of barrier-free facilities in priority areas
Municipalities are based on the Barrier-Free Law, in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and the movement between facilities is usually performed on foot (important maintenance area), we will formulate the "Barrier-Free Basic Concept" in order to promote barrier-free public transportation, buildings, roads, off-street parking lots, city parks, traffic lights, etc. with emphasis and integrally.
(2) What is the Basic Concept of Barrier-Free?
In priority maintenance districts, in order to promote barrier-free public transportation such as railway stations, public facilities such as roads and parks, and public buildings used by elderly people with disabilities, etc. It defines the range of priority maintenance districts and the contents of projects (specific projects, etc.) that should be implemented for barrier-free facilities.
In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out business of barrier-free in important point maintenance district.
In Yokohama-shi, we carry out business in principle five years after basic design development.
3.Priority maintenance areas and routes for barrier-free
In the Hodogaya-ku Barrier-Free Basic Concept, in the area around Hoshikawa Station, Tennocho Station, and Hodogaya Station, priority maintenance areas, life-related facilities, and life-related routes are defined.
What are life-related facilities?
Facilities such as passenger facilities, government facilities, and welfare facilities used by the elderly and disabled in daily life or social life.
Mainly, (1) the facility is used by an unspecified number of people, including the elderly and the disabled, and (2) the means leading to the facility are mainly Hoshikawa Station, Tennocho Station, Hodogaya Station. Facilities that meet the conditions of walking from.
What is a life-related route?
Of the routes between living-related facilities, it is particularly vulnerable to barrier-free, and is classified into "life-related routes (A)" and "life-related routes (B)" according to the target maintenance level. .
Life-related routes (A)
Of the lifestyle-related routes, routes that carry out maintenance in accordance with the standards for facilitating movement, etc. based on the Barrier-Free Law, or routes that have already been maintained in accordance with the standards.
Life-related routes (B)
Due to local restrictions such as topography and urbanization among the lifestyle-related routes, it cannot be set to Life-related Route A, but taking into account the road function and role of the route, movement based on the Barrier-Free Law as much as possible Routes to carry out maintenance in accordance with smoothing standards (set as Yokohama City's unique approach)
4.What is the Road Specific Business Plan?
With "road specific business plan", road manager establishes the following matters along basic design in important point maintenance district established in basic design.
- "Road section" that implements road identification projects
- "Contents and scheduled implementation period" of road-specific projects to be implemented for each section
- Other "important matters to be considered" when implementing road-specific projects
5.Maintenance Policy
(1) Target year
As a general rule, maintenance will be carried out with the goal of FY2024.
(2) Setting the maintenance level
We will set maintenance levels such as renovation in consideration of regional characteristics, current design, and surrounding roadside conditions. In addition, in order to carry out effective maintenance, we plan cooperation and consistency with other companies and consider continuity of walking space.
(3) Business scope of the target route
In consideration of the network between living-related facilities, the business scope of the target route was set.
(4) Major maintenance standards
We carry out maintenance based on standard to establish in "the regulations about standard of structure of road necessary for smoothness such as Yokohama-shi movement" and "town development regulations of Yokohama-shi welfare".
6.Maintenance plan
In order to achieve barrier-free priority and integrally, we plan the following routes to carry out the business. In addition, we may carry out review of plan by adjustment and budget with other companies.
(1) Area around Hoshikawa Station
1) Business plan for individual routes
2) Routes subject to road specific business plans
Target routes and business plans are as follows:
Route name | 4 City Road Tsurugamine Tennocho Line Route 7147 |
---|---|
Business Section | In front of the Hodogaya Ward Office |
Business extension | 70m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] A mistake has occurred in the block for guiding visually impaired persons (linear block) at the pedestrian crossing. Intersections and blocks for guiding visually impaired people in route guidance are degraded or damaged. [Measures] The position of the block for guiding the visually impaired (line block) will be renovated to the center of the pedestrian crossing. Renovation of intersections and blocks for guiding visually impaired people in route guidance. |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 80m Partial laying and renovation at intersections, etc. 5 locations |
Route name | 5 City Road Tsurugamine Tennocho Line Route 7147 |
---|---|
Business Section | Intersection in front of Hodogaya Ward Hall to Kawabe Koenmae Intersection |
Business extension | 200m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Others 6 renovations of planting masu |
Route name | 10 City Road Hoshikawa Iwama Line Route 7143 |
---|---|
Business Section | Hoshikawa Elementary School Bus Stop-Hoshikawa Station Entrance Intersection |
Business extension | 400m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Others Relocation of telephone poles, etc. 29 locations |
Implementation of the Project Care should be taken Important matters | The relocation of telephone poles requires coordination with the relocation destination. |
Route name | 12 City Road Hoshikawa Iwama Line Route 7143 |
---|---|
Business Section | Hoshikawa-cho intersection-in front of the tree nursery school |
Business extension | 235m |
Project implementation period | Fiscal 2023-FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Securing walking space Width of sidewalk 242m Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 3 locations |
Implementation of the Project Care should be taken Important matters | In implementing the sidewalk widening project, it is necessary to consult with related organizations and adjust the height with private land. |
Route name | 16 City Road Mitsuzawa Route 306 |
---|---|
Business Section | Inageya Yokohama Hoshikawa Ekimae Store-Hoshikawa Bridge |
Business extension | 80m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of road structure Renovation of roadways 493㎡ Renovation of sidewalks Partial renovation 27㎡ Others Renovation of stairs, etc. |
Implementation of the Project Care should be taken Important matters | The operation of the Hoshikawa Bridge is currently under discussion. |
Route name | 17 City Road Tennocho Route 5 |
---|---|
Business Section | From Hoshikawa Station Entrance Intersection to Hoshikawa Station |
Business extension | 110m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons 6 new installations at intersections, etc. |
Route name | 18 City Road Mitsuzawa Route 307 |
---|---|
Business Section | North Exit of Hoshikawa Station to Hodogaya Ward Hall Intersection |
Business extension | 70m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 68m Others Consideration of pavement renovation |
Route name | 22 City Road Tennocho Route 12 |
---|---|
Business Section | Domae, Hodogaya Public Association, Yokohama |
Business extension | 50m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Two parts laying and renovations at intersections, etc. |
Route name | 23 City Road Tennocho Route 12 |
---|---|
Business Section | Intersection in front of Yanagibashi-Kawabe-Koen |
Business extension | 115m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 146m Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 5m Others Renovation of planting masu 10 places |
Implementation of the Project Care should be taken Important matters | Regarding the mounting part in front of Yanagibashi, we will consider correcting along with the improvement of the surrounding area. |
Route name | 24 City Road Mitsuzawa Route 317 |
---|---|
Business Section | Intersection in front of Kawabe Park - Lions Mansion Yokohama Hoshikawa-mae |
Business extension | 75m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 6m |
Route name | 25 City Road Tennocho Routes 24 and 93 |
---|---|
Business Section | Intersection in front of the nursery school and in front of the mailer elementary school |
Business extension | 200m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Partial laying at intersections, etc. New construction 1 Partial laying at intersections, etc. 3 |
Route name | 26 City Road Tennocho Routes 24 and 93 |
---|---|
Business Section | From the intersection in front of Mailiko Elementary School to Aeon Tennocho |
Business extension | 250m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 4 locations |
Route name | 27 City Road Tennocho Route 17 |
---|---|
Business Section | In front of Aeon Tennocho |
Business extension | 60m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Others 9 renovations of planting masu |
(2) Area around Tennocho Station
1) Business plan for individual routes
2) Routes subject to road specific business plans
Target routes and business plans are as follows:
Route name | 1 City Road Tennocho Route 39 |
---|---|
Business Section | In front of Western Youth Plaza Happy Square to Tennocho Park |
Business extension | 140m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Partial renovation 41㎡ Renovation of apron block 28m Refurbishment of drainage facilities Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 5 locations Others 2 new construction and improvement of car stops |
Route name | 2 City Road Tennocho Route 42 |
---|---|
Business Section | Tennocho Park-Matsubara Shopping Street |
Business extension | 130m |
Project implementation period | FY2021 to FY2022 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Partial renovation 17㎡ Renovation of apron block 9m Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 7 locations Others Relocation of telephone poles, etc. |
Implementation of the Project Care should be taken Important matters | Relocation of telephone poles requires coordination with the relocation destination. |
Route name | 3 City Road Tennocho Route 20 |
---|---|
Business Section | In front of Aeon Tennocho Store-in front of Horiuchi Pharmacy |
Business extension | 145m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons 8 new installations at intersections, etc. Partial laying and renovation at intersections, etc. 3 locations |
Route name | 5 City Road Tennocho Route 20 |
---|---|
Business Section | Silk Road Tennocho |
Business extension | 150m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Partial renovation 120㎡ Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. |
Route name | 7 City Road Tennocho Route 96 |
---|---|
Business Section | In front of Mailiko Elementary School to Yokohama Business Park |
Business extension | 355m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 6 locations Others New construction and improvement of car stoppers 6 locations |
Route name | 9 City Road Tennocho Route 160 |
---|---|
Business Section | In front of Yokohama Business Park - Kobe-cho Eastern Neighborhood Associationskan |
Business extension | 90m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Renovation of apron block 9m Refurbishment of drainage facilities Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 4 locations |
Route name | 10 City Road Tennocho Route 162 |
---|---|
Business Section | Former Furumachi Bridge Ruins-Tennocho Station Park |
Business extension | 250m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 15m Partial laying and renovation at intersections, etc. 4 locations |
Route name | 11 City Road Hoshikawa Iwama Line Route 7143 |
---|---|
Business Section | Hodogaya Public Works Office Entrance Intersection |
Business extension | 270m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Securing flat parts 3 locations Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 2m 9 parts laying and renovations at intersections, etc. Others New construction and improvement of car stoppers 6 locations |
Implementation of the Project Care should be taken Important matters | It is necessary to coordinate with related parties to secure the flat part. |
Route name | 12 City Road Hoshikawa Iwama Line Route 7143 |
---|---|
Business Section | Hodogaya Public Works Office Entrance Intersection - Shinmei-shamae Intersection |
Business extension | 145m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 5 locations Others New construction and improvement of car stoppers |
Route name | 13 City Road Hoshikawa Iwama Line Route 7143 |
---|---|
Business Section | Shinmei-sha-mae intersection to Daimon-dori intersection |
Business extension | 160m |
Project implementation period | 2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons 1 new installation at intersections, etc. Partial laying and renovation at intersections, etc. 5 locations |
Route name | 15 City Road Tennocho Route 97 |
---|---|
Business Section | In front of Neighborhood Associationskan in the eastern part of Kobe-cho to the former Furumachi site |
Business extension | 45m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Securing walking space Width of sidewalk 40m Renovation of sidewalks Renovation of apron block 5m Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 4 locations |
Implementation of the Project Care should be taken Important matters | The widening of the sidewalk will be considered at the time of conversion of private land. |
Route name | 16 City Road Tennocho Routes 26 and 97 |
---|---|
Business Section | Former Furumachi site-in front of Horiuchi pharmacy |
Business extension | 390m |
Project implementation period | 2022 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons 5 new installations at intersections, etc. Partial laying and renovation at intersections, etc. |
Route name | 19 City Road Tennocho Routes 108, 113 |
---|---|
Business Section | Tennocho Station North Exit-In front of the Fifth Seto Building |
Business extension | 220m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of road structure Renovation of roadways 181㎡ Renovation of sidewalks Partial renovation 26㎡ Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 17 locations |
Route name | 20 City Road Tennocho Route 61 |
---|---|
Business Section | In front of Kadoichi Building - in front of Diamond Tennocho Building |
Business extension | 120m |
Project implementation period | 2020 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Refurbishment of drainage facilities Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 8 locations |
Route name | 21 City Road Hodogaya Station Asama Line Route 7140 |
---|---|
Business Section | Daimon-dori Intersection to Tennocho Ekimae Park |
Business extension | 240m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 467m Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 129m Partial laying and renovation at intersections, etc. 12 locations |
Route name | 22 City Road Hodogaya Station Asama Line Route 7140 |
---|---|
Business Section | In front of Tennocho Station Park |
Business extension | 45m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 79m Refurbishment of drainage facilities Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 39m Partial laying and renovation at intersections, etc. 5 locations |
Route name | 23 City Road Hodogaya Station Asama Line Route 7140 |
---|---|
Business Section | In front of Tennocho Station Park to Inamura Building |
Business extension | 270m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 492m Renovation of apron block 19m Refurbishment of drainage facilities Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 39m Partial laying and renovation at intersections, etc. 15 locations Others Consideration of protective fence installation 540m |
Implementation of the Project Care should be taken Important matters | The installation of protective fences will be considered according to land use (roadside conditions). Part of the sidewalk will be maintained in accordance with the continuous grade separation project. |
(3) Area around Hodogaya Station
1) Business plan for individual routes
2) Routes subject to road specific business plans
Target routes and business plans are as follows:
Route name | 3 City Road Hodogaya Station Asama Line Route 7140 |
---|---|
Business Section | Iwamacho "Koban" (police box) Intersection - Hodogaya Station West Exit Traffic Plaza |
Business extension | 215m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 332m Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 8m 1 new installation at intersections, etc. Partial laying and renovation at intersections, etc. 11 locations |
Route name | 4 City Road Hodogaya Station Asama Line Route 7140 |
---|---|
Business Section | Iwamacho "Koban" (police box) Intersection - Daimon Street Intersection |
Business extension | 320m |
Project implementation period | FY2022 to FY2023 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 640m Laying and renovation of blocks for guiding visually impaired persons Partial laying and renovation at intersections, etc. 7 locations |
Route name | 5 National Route 1 |
---|---|
Business Section | Hodogaya Station East Exit Bus Terminal Exit Intersection - Subaru Nursery School |
Business extension | 285m |
Project implementation period | FY2020 to FY2023 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Partial renovation 64㎡ Securing flat parts 2 locations Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 46m Partial laying and renovation at intersections, etc. |
Implementation of the Project Care should be taken Important matters | The renovation of the sidewalk should be coordinated with the Urban Development Bureau, including the construction of the site of the former Hodogaya Prefectural Tax Office. |
Route name | 10 Hodogaya Station East Exit Pedestrian Bridge |
---|---|
Business Section | Hodogaya Station East Exit to Hodogaya Station East Exit Traffic Plaza |
Business extension | 140m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Laying and renovation of blocks for guiding visually impaired persons Continuous installation of route guidance 15m Others 1 new elevator |
Route name | Hodogaya Station West Exit Traffic Plaza |
---|---|
Business Section | Hodogaya Station West Exit Traffic Plaza |
Business extension | 177m |
Project implementation period | FY2020 to FY2024 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 239m Renovation of apron block 4m Laying and renovation of blocks for guiding visually impaired persons 7 new installations at intersections, etc. Partial laying and renovation at intersections, etc. 3 locations |
Route name | Hodogaya Station East Exit Traffic Plaza |
---|---|
Business Section | Hodogaya Station East Exit Traffic Plaza |
Business extension | 163m |
Project implementation period | FY2020 to FY2021 |
Maintenance Policy | [Issues] |
Maintenance items | Renovation of sidewalks Complete renovation 163m Laying and renovation of blocks for guiding visually impaired persons Continuous laying and repair of route guidance 164m Partial laying and renovation at intersections, etc. 4 locations |
Implementation of the Project Care should be taken Important matters | A block for guiding visually impaired people will be installed according to the bus and taxi platform. |
7.Promotion of Road Specific Business Plan
We show the following about contents to work on as road manager to promote "road specific business".
- Utilizing websites, etc., we will provide information on the status of barrier-free business implementation and initiatives.
- We perform instruction, removal to cancel illegal private use article to narrow effective width of road and to prevent illegally occupied bicycles which hinder traffic and call for use of bicycle parking lot.
In order to form a walking space network that allows everyone to move safely and comfortably, the cooperation of traffic managers, railway operators, road occupants, roadside residents, etc. is required. Thank you very much for your cooperation.
Inquiries to this page
Road and Highway Bureau Road Department Facilities Division
Telephone: 045-671-2731
Telephone: 045-671-2731
Fax: 045-550-3376
Email address: do-shisetsu@city.yokohama.lg.jp
Page ID: 483-179-056