Negishi Station, Isogo Station, folding screenura Station, Sugita Station, Shinsugita Station Area Road Specific Business Plan Text Version

Last update date March 24, 2023

Negishi Station, Isogo Station, Isogo Station, Fubuura Station, Sugita Station, Shinsugita Station Area Road Specific Business Plan <established in March 2023>

1.First of all,

In Yokohama City, following the enforcement of the Barrier-Free Law (Law Concerning the Promotion of Smooth Movement of Elderly and Disabled Persons) in December 2006, everyone can engage in independent daily and social life. We are promoting barrier-free measures to improve the environment.
In March 2014, Isogo Ward created the "Basic Concept for Barrier-Free Area around Sugita Station and Shin-Sugita Station" to promote barrier-free access. About eight years have passed since the formulation of this basic concept, and in order to build a further barrier-free environment based on past achievements and achievements, we have created a new Isogo Ward Barrier-Free Basic Concept.
This time, for the realization of this new basic concept, we have formulated the "Negishi Station, Isogo Station, folding screenura Station, Sugita Station, Shin Sugita Station, and Shinsugida Station Area Road Specific Business Plan".
In the future, we will implement the project based on this plan.

2.The barrier-free law system

(1) What is the Barrier-Free Law?

In order to improve the convenience and safety of transportation and facility use for the elderly, disabled, pregnant women, injured people, etc., the following two major pillars will promote barrier-free access.

Promotion of barrier-free public transportation, buildings, public facilities, etc.

When newly constructing and introducing public transportation (passenger facilities such as stations and bus terminals, vehicles such as railway vehicles and buses), as well as specific buildings, roads, off-street parking lots and city parks, each business operator・ We require facility setting managers such as building owners to conform to the "barrier-free maintenance standards (mooth facilitation standards for movement)" established for each facility. In addition, efforts are required for these existing facilities to meet the standards.

Promotion of barrier-free priority maintenance areas

Based on the Barrier-Free Law, municipalities are located in areas centered on passenger facilities such as railway stations, where facilities used by the elderly and disabled gather, and the movement between facilities is usually performed on foot (priority maintenance district) ), We devise "barrier-free basic design" to promote barrier-free such as public transportation, buildings, road, off-street parking lots, city parks, traffic lights, etc. .

(2) What is the Barrier-Free Basic Concept

In priority maintenance district, to promote barrier-free such as public transportation such as railway stations, public facilities such as roads and parks, and public buildings used by elderly people with disabilities in priority maintenance districts, We determine range of important maintenance district, contents of business (specific business) to carry out for barrier-free.
In addition, after basic design development, each company makes concrete business plan based on basic design and will carry out business of barrier-free in important point maintenance district.
In Yokohama-shi, we carry out business with the goal of five years from principle, basic design development.

3.Routes for priority maintenance areas and barrier-free

In the Isogo Ward Barrier-Free Basic Concept, in the areas around Negishi Station, Isogo Station, folding screenura Station, Sugita Station, and Shin-Sugita Station area, priority maintenance districts, living-related facilities, and life-related routes are defined.

What is a living-related facility?

Facilities such as passenger facilities, government facilities, and welfare facilities used by the elderly and disabled in daily life or social life.
Mainly, (1) facility must be used by an unspecified number of people, including the elderly and disabled. (2) The facility must be within walking distance (approximately 500m to 1km) from Negishi Station, Isogo Station, Fubuura Station, Sugita Station, and Shinsugida Station.

What is Life-Related Routes?

Among the routes connecting life-related facilities, this is a route that requires a particularly high need for barrier-free access, referring to the main traffic lines of pedestrians in the district and the current sidewalk conditions.

4.What is a road-specific business plan?

With "road specific business plan", road manager establishes the following matter according to basic design in important point maintenance district established in basic design.

  • "Road section" to carry out road identification business
  • "Contents and planned implementation period" of road specific projects to be implemented for each section
  • Other "important matters to be considered" when implementing road-specific projects

5.Maintenance Policy

(1) Target year

As a general rule, maintenance will be carried out with the goal of 2027.

(2) Maintenance level setting

Set the level of maintenance such as renovation will be set in consideration of regional characteristics, current design, and surrounding roadside conditions. In addition, in order to carry out effective maintenance, we plan cooperation and coordination with other companies and consider the continuity of walking space.

(3) Business scope of the target route

Considering the network between living-related facilities, the business scope of the target route was set.

(4) Main maintenance standards

We carry out maintenance based on standard to establish in "the regulations about standard of structure of road necessary for smoothness such as Yokohama-shi movement" and "town development regulations of Yokohama-shi welfare".

6.Maintenance Plan

We plan about route to carry out business as follows to plan barrier-free in a priority and integrated manner. In addition, we may carry out review of plan by adjustment with other companies and budget.

(1) Negishi Station Area

1) Business plan for individual routes
2) Target routes of road identification business plan

Target routes and business plans are as follows:

Life-related Routes
Route name9 Yamashita Motomaki Isoko Line
Business segmentsBetween Negishi Station Intersection and Yahatabashi Intersection
Business extension770m
Project implementation period2025
Maintenance Policy

[Problem]
The installation position of the block for guiding the visually impaired and the installation position of the vehicle stop is not consistent.
The pedestrian bridge stairs occupy the sidewalk, and there is no measure to alert visually impaired people.
The crossing slope of the sidewalk near the bus stop is steep.
Blocks for guiding the visually impaired are not installed in front of the pedestrian crossing and at the bus stop.

[Measures]
Review and reinstall the position of the block for guiding the visually impaired and the stopper.
A block for guiding the visually impaired will be installed around the pedestrian bridge stairs.
A block for guiding the visually impaired will be installed around the pedestrian bridge stairs.
Install blocks for guiding visually impaired persons will be installed in front of the pedestrian crossing and at bus stops.

Maintenance items

Renovation of sidewalks
Improvement of flatness 1 point
Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 20m
Intersections, etc. 2 new locations
Intersections, etc. 1 location
Others
New installation and improvement of vehicle stop

Life-related Routes
Route name14 Maita No. 474                          
Business segmentsSakashita Bridge Higashizume Intersection and Negishibashi Intersection
Business extension370m
Project implementation period2023
Maintenance Policy

[Problem]
The block for guiding the visually impaired is interrupted by the manhole.
[Measures]
Install a guide sheet in the manhole.

Maintenance items

Others
2 locations of guidance sheets

Life-related Routes
Route name16 Maita No. 465                         
Business segmentsCreate S.D. Isogo Maruyama store and Negishibashi Intersection
Business extension100m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no sidewalk.
[Measures]
Install a color belt.

Maintenance itemsOthers
Color belt 70m
Life-related Routes
Route name17 Maita No. 465                        
Business segmentsCreate S.D. Isogo Maruyama store and FUJI Negishibashi Store
Business extension60m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no sidewalk.
[Measures]
Install a color belt.

Maintenance itemsOthers
Color belt installation 60m
Life-related Routes
Route name19 Maita No. 548, Maita No. 554                
Business segmentsBetween Iwase Shopping Street Intersection and near Takito 2-chome Intersection
Business extension225m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is a large gap between the lid of the drainage facility.
A rainwater basin is protruding into the roadway.
[Measures]
Replace the lid of the drainage facility to a standard with a small gap.
Replace the lid of the drainage facility to a standard with a small gap.

Maintenance itemsOthers
Refurbishment of lids for drainage facilities
1 location of rainwater basin
Life-related Routes
Route name20 Maita No. 471                        
Business segmentsBetween Takito 2-chome Intersection and Maruyama 2-chome Intersection
Business extension185m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There are many places where vehicles can enter, and the sidewalk pavement is wavy.
[Measures]
Repair the sidewalk pavement.

Maintenance itemsRenovation of sidewalks
Improvement of flatness 1 point
Life-related Routes
Route nameNegishi Elementary School Entrance Intersection
Business segmentsNegishi Elementary School Entrance Intersection
Business extension25m
Project implementation period2025
Maintenance Policy

[Problem]
There is a large step in the pedestrian road boundary block near the pedestrian crossing.
The installation position of the block for guiding the visually impaired and the installation position of the vehicle stop is not consistent.
[Measures]
Renovation of the pedestrian road boundary block near the pedestrian crossing.
Reinstall the block for guiding the visually impaired and the stopper.

Maintenance items

Renovation of sidewalks
Renovation of the sidewalk boundary block 11m
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 1 location
Others
New installation and improvement of vehicle stop

Life-related Routes
Route namePool Center Entrance Intersection                             
Business segmentsPool Center Entrance Intersection
Business extension50m
Project implementation period2025
Maintenance Policy

[Problem]
There is a large gap between the lid of the drainage facility.
[Measures]
Replace the lid of the drainage facility to a standard with a small gap.

Maintenance items

Others
Refurbishment of lid of drainage facilities


(2) Isogo Station and Fubuura Station Area

1) Business plan for individual routes
2) Target routes of road identification business plan

Target routes and business plans are as follows:

Life-related Routes
Route name4 Isogo No. 245
Business segmentsBetween Isogo Ward Office and Isogo-Hamanishi Post Office
Business extension730m
Project implementation period2024
Maintenance Policy

[Problem]
The block for guiding visually impaired people has deteriorated.
[Measures]
The block for guiding visually impaired people has deteriorated.

Maintenance items

Installation and renovation of blocks for guiding visually impaired persons
Continuous laying and repair of route guidance 102m

At the time of project implementation
To be considered
Important matters

Blocks for guiding visually impaired persons that do not conform to the JIS standard are subject to renovation. (35m)
(Dimensions: 30cm x 30cm, color: yellow) Blocks for guiding visually impaired persons are
Ensure the brightness ratio. (67m)

Life-related Routes
Route name5 Isogo No. 245                                    
Business segmentsBetween Isogo Station and Yokohama City Social Education Corner
Business extension220m
Project implementation period2024
Maintenance Policy

[Problem]
The block for guiding the visually impaired is interrupted by the manhole.
[Measures]
The block for guiding the visually impaired is interrupted by the manhole.

Maintenance items

Others
Installation of guidance sheet 1m

Life-related Routes
Route name6 Isogo No. 245
Business segmentsBetween Isogo Station and Isogo Garage Intersection
Business extension540m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no block for guiding the visually impaired between the Ookagawa branch waterway and the intersection in front of Isogo Garage.
There is an unnecessary vehicle entry point on the sidewalk, and the crossing slope of the sidewalk is steep.
[Measures]
A block for guiding the visually impaired will be installed between the Okagawa Branch Waterway and the intersection circle section in front of Isogo Garage.
Refurbish the entry point of unnecessary vehicles.

Maintenance itemsRenovation of sidewalks
Improvement of flatness 1 point
Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 140m
Life-related Routes
Route name7 Isogo No. 245
Business segmentsBetween intersection in front of Isogo Garage and Isogo Post Office
Business extension175m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no block for guiding the visually impaired between the Isogo Garage-mae intersection and the Isogo Post Office.
[Measures]
A block for guiding the visually impaired will be installed between the Isogo Garage Intersection and the Isogo Post Office.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 126m
Life-related Routes
Route name9 Loop Route 2
Business segmentsBetween folding screengaura intersection and folding screengaura station square intersection
Business extension380m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no block for guiding the visually impaired between the folding screengaura intersection and the Keikyu Store folding screenura store.
There is an unnecessary vehicle entry point on the sidewalk, and the crossing slope of the sidewalk is steep.
[Measures]
A block for guiding the visually impaired will be installed between the folding screengaura intersection and the Keikyu Store folding screenura store.
Refurbish the entry point of unnecessary vehicles.

Maintenance itemsRenovation of sidewalks
Complete renovation 274m
Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 274m
Life-related Routes
Route name10 Mori No. 30                                   
Business segmentsIsogo Ward Office South side section
Business extension90m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no block for guiding visually impaired persons on the south side of the Isogo Ward Office.
[Measures]
A block for guiding visually impaired persons will be installed on the south side of the Isogo Ward Office.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 84m
Life-related Routes
Route name11 Sasashita Route 453                                 
Business segmentsBetween the intersection in front of folding screengaura Station and Keikyu Store Foldingura Store
Business extension90m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no block for guiding the visually impaired between folding screenura Station and Keikyu Store folding screenura store.
[Measures]
A block for guiding the visually impaired will be installed between folding screenura Station and Keikyu Store Folding Ura Store.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 51m
At the time of project implementation
To be considered
Important matters
Coordination with related organizations is required for folding screen Ura Station Square because it is outside the road area.
Life-related Routes
Route name14 Maita No.480                                 
Business segmentsShiomidai "Koban" (police box) Intersection
Business extension720m
Project implementation period2023
Maintenance Policy

[Problem]
Aloe planted in a tree-planting basin is dangerous.
The sidewalk in the tunnel is narrow and the bicycle is not thoroughly pushed.
[Measures]
Remove the aloe.
Review the currently installed cautionary signs for bicycle walking.

Maintenance itemsOthers
Removal of street trees
Review of caution markings
Life-related Routes
Route name15 Sasashita No. 150, Maita No.480
Business segmentsKoshinkai Shiomidai Hospital and Yokohama-Shiomidai Post Office
Business extension245m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is no flat part on the sidewalk near the push button signal, and the push button is difficult to push.
There is no block for guiding visually impaired people between the bus stop in front of the store and Koshinkai Shiomidai Hospital.
[Measures]
Repair the sidewalk around the push button.
A block for guiding the visually impaired will be installed between the bus stop in front of the store and Koshinkai Shiomidai Hospital.

Maintenance itemsRenovation of sidewalks
Partial renovation 28㎡
Installation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 133m
At the time of project implementation
To be considered
Important matters
With the installation of blocks for guiding visually impaired persons, pay attention to public-private boundaries and connections with hospitals.
Life-related Routes
Route name18 Isoko Station Central Pedestrian Bridge
Business segmentsEkimaechuuo, Isogo Pedestrian Bridge
Business extension125m
Project implementation period2024
Maintenance Policy

[Problem]
The steel plate slope at the elevator entrance is damaged.
There are no handrails on the pedestrian bridge.
It is difficult to understand the boundary between the flat part of the pedestrian bridge and the slope.
It is difficult to understand the location of the elevator on the side of Isogo Station.
[Measures]
Replace the steel plate slope.
A two-tier handrail will be installed on the pedestrian bridge.
Change the color of the flat part of the pedestrian bridge.
Install pictograms, etc. so that the location of the elevator can be identified.

Maintenance itemsOthers
Step 1 step improvement
Installation of two-stage handrails 195m
Measures such as pavement 1
1 pictograms, etc.
At the time of project implementation
To be considered
Important matters
Pay attention to the brightness ratio of flat pavement, slope pavement, and blocks for guiding visually impaired people.
Life-related Routes
Route name19 Isoko Station 2ndwalk Bridge
Business segmentsIsogo Station 2ndwalk Bridge
Business extension160m
Project implementation period2026
Maintenance Policy

[Problem]
The concrete of the pedestrian bridge slope is missing.
The handrail installed on the pedestrian bridge is installed at a low position with only one step.
It is difficult to understand the boundary between the flat part of the pedestrian bridge and the slope.
The block for guiding the visually impaired at the connection between the pedestrian bridge and the sidewalk has deteriorated.
[Measures]
Refurbished parts.
A two-tier handrail will be installed on the pedestrian bridge.
Change the color of the flat part of the pedestrian bridge.
For guiding the visually impaired.

Maintenance itemsRenovation of sidewalks
Partial renovation 1㎡
Installation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 2 locations
Others
Installation of two-stage handrails 300m
Measures such as pavement 1
At the time of project implementation
To be considered
Important matters
Pay attention to the brightness ratio of flat pavement, slope pavement, and blocks for guiding visually impaired people.
Life-related Routes
Route name20 Isogo Station Pedestrian Bridge                                
Business segmentsIsogo Station Pedestrian Bridge
Business extension45m
Project implementation periodFY2023 to FY2027
Maintenance Policy

[Problem]
There is a height difference on the footing on the pedestrian bridge stairs (Isogo Station side).
The block for guiding visually impaired people at the pedestrian bridge landing has deteriorated.
[Measures]
Improve the height difference of the stepping stone on the pedestrian bridge stairs (Isogo Station side).
For guiding the visually impaired.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Intersections, etc. 1 location
Others
Refurbishment of stairs
Life-related Routes
Route nameIsogo Station Square                                  
Business segmentsIsogo Station Square
Business extension150m
Project implementation period2024
Maintenance Policy

[Problem]
The sidewalk is uneven due to the rise of the tree.
[Measures]
Implement measures to prevent the rooting.

Maintenance itemsOthers
Implementation of construction work to prevent roots
Life-related Routes
Route nameHajime Mori Chome Intersection                                 
Business segmentsHajime Mori Chome Intersection
Business extension25m
Project implementation period2027
Maintenance Policy

[Problem]
The sidewalk and roadway at the intersection are flat, making the boundaries difficult to understand.
[Measures]
Modify the sidewalk boundary block.

Maintenance itemsRenovation of sidewalks
Repair of the sidewalk boundary block 26m
Life-related Routes
Route nameIntersection in front of folding screengaura Station                              
Business segmentsIntersection in front of folding screengaura Station
Business extension60m
Project implementation period2023
Maintenance Policy

[Problem]
There is no block for guiding visually impaired people on the sidewalk in contact with the pedestrian crossing.
[Measures]
Install a block for guiding the visually impaired.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Parts laid at intersections, etc. 7 new locations

(3) Sugita Station and Shin-Sugita Station Area

1) Business plan for individual routes
2) Target routes of road identification business plan

Target routes and business plans are as follows:

Life-related Routes
Route name3 Shinsugita Route 73
Business segmentsBetween Shinsugita Station Square (Bus Platform) and OKA Shinsugita store
Business extension140m
Project implementation period2027
Maintenance Policy

[Problem]
There is no block for guiding the visually impaired between each bus stop and the taxi stand.
[Measures]
Install a block for guiding the visually impaired.

Maintenance itemsInstallation and renovation of blocks for guiding visually impaired persons
Continuous installation of route guidance 140m
Life-related Routes
Route name5 Isogo No. 245                                    
Business segmentsBetween intersection in front of Sugita "Koban" (police box) and Shinsugita Park
Business extension400m
Project implementation period2023
Maintenance Policy

[Problem]
The pavement on the roadway has deteriorated.
[Measures]
Repair the pavement of the roadway.

Maintenance itemsRenovation of road structure
Roadway repair 46㎡
Life-related Routes
Route nameShinsugita Station Intersection                                    
Business segmentsShinsugita Station Intersection
Business extension45m
Project implementation period2023
Maintenance Policy

[Problem]
The pavement on the sidewalk has deteriorated.
[Measures]
Repair the pavement of the sidewalk.

Maintenance itemsRenovation of sidewalks
Partial renovation 1㎡

7.Promotion of Road Specific Business Plan

In order to promote "road specific business", we will show the following about the contents to work as a road manager.

  • Utilizing websites, etc., we will provide information on the status of barrier-free business implementation and initiatives.
  • We perform instruction, removal to cancel illegal private use article narrowing effective width of road and illegally parked bicycles that hinder traffic, and call for the use of bicycle parking lots.

In order to form a walking space network that allows all people to travel safely and comfortably, the cooperation of related parties such as traffic managers, railway operators, road occupants, and roadside residents is required. Thank you very much for your cooperation.

For inquiries to this page

Road and Highway Bureau Road Department Facilities Division

Phone: 045-671-2731

Phone: 045-671-2731

Fax: 045-651-5443

Email address: do-shisetsu@city.yokohama.jp

Return to the previous page

Page ID: 559-849-937

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews