Menu

Close

Here's the text.

The 164th Yokohama City Planning Council Project Table

Last Updated March 23, 2023

Deliberation Items

1 Urban Planning Projects
Explanation
Classification
Agenda item
Number
TitleContentsStatement of Position
Project Outline (PDF: 240KB)

1366

Yokohama International Port Capital Construction Plan
Change of Restricted Areas

[Aoba Bishigaoka 2-chome District]

In the Aoba Miyoshigaoka 2-chome district, taking advantage of the opportunity to abolish large-scale company housing, form a network of safe and comfortable pedestrian space, guide the functions necessary for the area through rational and sound advanced use of land. In order to promote a decarbonized society, we will promote town development while cooperating with initiatives carried out by the Association of Neighborhood Association, Store Associations, Area Management Organizations and other organizations in the area. At the same time, the "Restricted Area" and "Advanced District" will be changed.
Slide materials (PDF: 33,664KB)
Summary of public statement opinion and way of thinking of city (PDF: 135KB)

Yes (PDF: 179KB)

1367

Yokohama International Port Capital Construction Plan
Change of altitude district
1368Yokohama International Port Capital Construction Plan
Determination of District Planning
Project Outline (PDF: 109KB)

1369

Yokohama International Port Capital Construction Plan
Change of Urban Expressway Railway

[No. 7 Sotetsu/Tokyu Direct Line] (1369)

As a result of discussions and detailed design with related organizations along with the progress of the project, linearization between Hazawa Yokohama Kokudai Station and Shin-Yokohama Station, Shin-Yokohama Station, Shin-Yokohama Station, Shin-Tsunashima Station, and Shin-Tsunashima Station and Hiyoshi Station Because it is necessary to change the shape of the structure, the area of the main line will be changed.
In addition, the station name will be changed in accordance with this change.

[8/7/20 Shin-Yokohama Station North Exit Route 1] (1370)

As a result of discussions with related organizations and detailed design with the progress of the No. 7 Sotetsu / Tokyu Direct Line business, the shape of the entrance and exit of Shin-Yokohama Station was changed, so the connection form with the main line was changed. Was. As a result, it is necessary to change the position of the existing stairs, so the area of this route will be changed.

Slide materials (PDF: 33,477KB)

None
1370Yokohama International Port Capital Construction Plan
Road change
2 Other projects
Explanation classificationAgenda numberTitleContents
Outline of Projects (PDF: 84KB)1371Designation of specific production green spaces based on Article 10-2, Paragraph 3 of the Production Green Space Law

Of the areas that have already been designated as production green areas, those that are deemed to be particularly effective in forming a good urban environment to ensure that conservation is performed are designated as specific production green spaces. Based on rule of 2 Clause 3 of production green space law Article 10, we ask opinion of Yokohama-shi city planning council.
Slide materials (PDF: 1,864KB)

Project Outline (PDF: 108KB)1372

Installation of general waste treatment facilities and industrial waste treatment facilities based on Article 51 of the Building Standards Law

[Asahi Pretec Corp.]

A new municipal waste treatment facility and an industrial waste treatment facility (incineration facility) will be newly installed in Oguro-cho, Tsurumi-ku.

Slide materials (PDF: 12,042KB)
Permission standards and operational standards (PDF: 151KB) for industrial waste or general waste treatment facilities based on Article 51 of the Building Standards Law

Project Outline (PDF: 74KB)

1373Examination of statement of opinion based on Land Readjustment Act Article 55 Clause 3

[Old Kami-Seya Communication Facility District Land Readjustment Project]

Based on the provisions of Article 55, Paragraph 3 of the Land Readjustment Act, we will discuss the contents of the statement of position.
Slide materials (PDF: 1,341KB)
About business plan of former Kami-Seya communication facility district land readjustment project (reference materials) (PDF: 6,055KB)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Housing and Architecture Bureau Planning Department, Urban Planning Division

Phone: 045-671-2657

Phone: 045-671-2657

Fax: 045-550-4913

Email address: kc-toshikeikaku@city.yokohama.jp

Return to the previous page

Page ID: 875-487-334

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews