- Yokohama-shi Top Page
- Business
- Menu by field
- Construction and City Planning
- Urban planning
- City Planning Council
- Project Table
- The 164th Yokohama City Planning Council Project Table
Here's the text.
The 164th Yokohama City Planning Council Project Table
Last Updated March 23, 2023
Matters to be discussed
Explanation Category | Agenda item Number | Title | Contents | Statement of Position |
---|---|---|---|---|
Project Overview (PDF: 240KB) | 1366 | Yokohama International Port Construction Project Change of restricted zone | [Aoba Mishigaoka 2-chome district related] In the Aoba Mishigaoka 2-chome district, we will seize opportunities for the abolition of large-scale company housing and create a network of safe and comfortable pedestrian spaces, while guiding local functions through rational and sound advanced use of land and promoting a decarbonized society. In addition, we will promote community development in cooperation with local associations such as Neighborhood Association, shopping associations, area management organizations and other organizations, etc., to promote community development and promote community development. At the same time, "Restricted Areas" and "Advanced Areas" will be changed. | Yes (PDF: 179KB) |
1367 | Yokohama International Port Construction Project Change of altitude district | |||
1368 | Yokohama International Port Construction Project Decision of city planning | |||
Project Overview (PDF: 109KB) | 1369 | Yokohama International Port Construction Project Change of Urban Expressway Railway | [No. 7 Sotetsu / Tokyu Direct Line] (1369) As a result of consultation with related organizations and detailed design with the progress of the project, the alignment between Hazawa Yokohama National University Station and Shin-Yokohama Station, Shin-Yokohama Station, Shin-Tsunashima Station and Shin-Tsunashima Station and Hiyoshi Station We will change the area of this route because it is necessary to change the shape of the structure. [No. 8/7/20 Shin-Yokohama Station North Exit Route 1] (1370) As a result of consultation with related organizations and detailed design with the progress of the No. 7 Sotetsu / Tokyu Direct Line business, the connection form with the main line was changed because the entrance shape of Shin-Yokohama Station was changed Was. As a result, it became necessary to change the position of the existing stairs, so the area of this route will be changed. ・Slide materials (PDF: 33,477KB) | None |
1370 | Yokohama International Port Construction Project Change of road |
Explanation Category | Agenda item number | Title | Contents | |
---|---|---|---|---|
Project Overview (PDF: 84KB) | 1371 | Designation of specific production green space based on Article 10-2, Paragraph 3 of the Production Green Space Act | Of the areas already designated as production green areas, those that are deemed to be particularly effective in creating a favorable urban environment to ensure that the conservation is performed are designated as specific production green areas. Based on the provisions of Article 10-2, Paragraph 3 of the Act, we will ask for the opinion of the Yokohama City Planning Council. | |
Project Overview (PDF: 108KB) | 1372 | Installation of general waste treatment facilities and installation of industrial waste treatment facilities based on Article 51 of the Building Standards Law | [Asahi Pretec Corporation] A general waste treatment facility and an industrial waste treatment facility (incineration facility) will be newly installed in Daikoku-cho, Tsurumi-ku. | |
1373 | Examination of written opinion based on Article 55, Paragraph 3 of the Land Readjustment Act | [Old Kamiseya Communication Facility Area Land Readjustment Project] Based on the provisions of Article 55, Paragraph 3 of the Land Readjustment Act, we will discuss the contents of the statement of position. |
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Urban Planning Division, Housing and Architecture Bureau Planning Department
Telephone: 045-671-2657
Telephone: 045-671-2657
Fax: 045-550-4913
Email address: kc-toshikeikaku@city.yokohama.lg.jp
Page ID: 875-487-334