Menu

Close

Here's the text.

The 164th Yokohama City Planning Council Project Table

Last Updated March 23, 2023

Matters to be discussed

1 Urban planning projects
Explanation
Category
Agenda item
Number
TitleContentsStatement of Position
Project Overview (PDF: 240KB)

1366

Yokohama International Port Construction Project
Change of restricted zone

[Aoba Mishigaoka 2-chome district related]

In the Aoba Mishigaoka 2-chome district, we will seize opportunities for the abolition of large-scale company housing and create a network of safe and comfortable pedestrian spaces, while guiding local functions through rational and sound advanced use of land and promoting a decarbonized society. In addition, we will promote community development in cooperation with local associations such as Neighborhood Association, shopping associations, area management organizations and other organizations, etc., to promote community development and promote community development. At the same time, "Restricted Areas" and "Advanced Areas" will be changed.
Slide materials (PDF: 33,664KB)
Summary of public opinion and way of thinking of city (PDF: 135KB)

Yes (PDF: 179KB)

1367

Yokohama International Port Construction Project
Change of altitude district
1368Yokohama International Port Construction Project
Decision of city planning
Project Overview (PDF: 109KB)

1369

Yokohama International Port Construction Project
Change of Urban Expressway Railway

[No. 7 Sotetsu / Tokyu Direct Line] (1369)

As a result of consultation with related organizations and detailed design with the progress of the project, the alignment between Hazawa Yokohama National University Station and Shin-Yokohama Station, Shin-Yokohama Station, Shin-Tsunashima Station and Shin-Tsunashima Station and Hiyoshi Station We will change the area of this route because it is necessary to change the shape of the structure.
In addition, the name of the station will be changed according to this change.

[No. 8/7/20 Shin-Yokohama Station North Exit Route 1] (1370)

As a result of consultation with related organizations and detailed design with the progress of the No. 7 Sotetsu / Tokyu Direct Line business, the connection form with the main line was changed because the entrance shape of Shin-Yokohama Station was changed Was. As a result, it became necessary to change the position of the existing stairs, so the area of this route will be changed.

Slide materials (PDF: 33,477KB)

None
1370Yokohama International Port Construction Project
Change of road
2 Other projects
Explanation CategoryAgenda item numberTitleContents
Project Overview (PDF: 84KB)1371Designation of specific production green space based on Article 10-2, Paragraph 3 of the Production Green Space Act

Of the areas already designated as production green areas, those that are deemed to be particularly effective in creating a favorable urban environment to ensure that the conservation is performed are designated as specific production green areas. Based on the provisions of Article 10-2, Paragraph 3 of the Act, we will ask for the opinion of the Yokohama City Planning Council.
Slide materials (PDF: 1,864KB)

Project Overview (PDF: 108KB)1372

Installation of general waste treatment facilities and installation of industrial waste treatment facilities based on Article 51 of the Building Standards Law

[Asahi Pretec Corporation]

A general waste treatment facility and an industrial waste treatment facility (incineration facility) will be newly installed in Daikoku-cho, Tsurumi-ku.

Slide materials (PDF: 12,042KB)
Permission standards and operation standards for industrial waste or general waste treatment facilities based on Article 51 of the Building Standards Law (PDF: 151KB)

Project Overview (PDF: 74KB)

1373Examination of written opinion based on Article 55, Paragraph 3 of the Land Readjustment Act

[Old Kamiseya Communication Facility Area Land Readjustment Project]

Based on the provisions of Article 55, Paragraph 3 of the Land Readjustment Act, we will discuss the contents of the statement of position.
Slide materials (PDF: 1,341KB)
About business plan of former Kamiseya communication facility district land readjustment project (reference materials) (PDF: 6,055KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Planning Division, Housing and Architecture Bureau Planning Department

Telephone: 045-671-2657

Telephone: 045-671-2657

Fax: 045-550-4913

Email address: kc-toshikeikaku@city.yokohama.lg.jp

Return to the previous page

Page ID: 875-487-334

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews