Permission (law Article 85) of temporary building

Last update date December 18, 2020

About permission of temporary building

When we admit that we do not have problem in in fire prevention and hygiene in security with temporary building by Building Standard Act Article 85 Paragraph 5 and Paragraph 6 (permission of temporary building), we set period and say installed building temporarily. Temporary permission application is necessary before confirmation application. In addition, in security, please consult beforehand to window in judging that we do not have problem in in fire prevention and hygiene as we may demand correspondence individually. Window, please refer to "about consultation about building certification" for making a reservation of talking.

Permission standard

Permission standards (the September 25, 2018 enforcement) such as temporary performance ground based on regulations of Building Standard Act Article 85 Paragraph 5 << pdf format >> (PDF: 205KB)

Application book

<permission application>
Permission application (departmental order No. 44 style) → Two copies of principals and vice << Word format >> (word: 20KB)

<report accompanied with plan change>
Plan change approval registration form (Yokohama-shi Building Standard Act detailed enforcement regulations Article 15 Paragraph 1) → Two copies of principals and vice (Word) (word: 83KB)

<attached book (Yokohama-shi Building Standard Act detailed enforcement regulations Article 8 Paragraph 1)>

Attached book
1Reason book
2Guide map of temporary building and position figureWhen there is this construction, show the place and distance to temporary building clearly
3PlanSpecify the neighboring situation, site difference in elevation, road width
4Ground plan, elevation, cross section
5In the case of leased land, it is use consent form of landShow use consent period clearly
6Progress scheduleWhen there are process until start of construction - completion - removal of the building concerned and this construction, specify about connection with this construction
7

When there is this construction, to confirm progress and certainty of conduct, copying of documents proving contract (subcontract) of copying of the comfirmed proof or this construction

When, in process, attachment is difficult
  • Identification of confirmation application undertaking of this construction
  • Law, authorization based on the regulations
8Proxy
9Others
  • Structure check, certificate of various prior consultation
  • Prior consultation vote about house exhibit space master plan (in new house exhibit space only in the case of plan)

Flow of procedure

Temporary flow

Please refer to "standard handling of Housing and Architecture Bureau authorization period required for disposal" for standard processing period.
Please refer to "building certification Q&A" for common Q&A.
※Please consult about procedure of Building Standard Act Article 85 Paragraph 6 individually.


Application charges

With law revision, it revised the fee regulations.

  • Planning permission fee 120,000 yen such as temporary performance ground based on regulations of law Article 85 Paragraph 5
  • Planning permission fee 160,000 yen such as temporary performance ground based on regulations of law Article 85 Paragraph 6

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Housing and Architecture Bureau architecture leadership city area Building Control Section

Telephone: 045-671-4510