Menu

Close

Here's the text.

Atlas Kamiooka Garden Building Agreement

Last Updated April 6, 2023

Image of the district where prior consultation is requested
Prior consultation request district (including building agreement area)

Preliminary consultation request district

Sites excluded from prior consultation request areas

  • Prior consultation request If there is a building plan on the site in the area, please contact the Steering Committee in advance.
  • Please refer to Urban Development Bureau area town development section (045-671-2667) for contact information of steering committee.
  • Please note that for adjacent land, we may join a building agreement in the future.
  • What is "Private Consultation Request Area"?
  • Authorized Building Agreement Area Map (PDF: 48KB)
    Detailed map of the building agreement area and adjacent land (land for those who do not agree with the agreement)
  • Building agreement (PDF: 146KB)
    ※Please be sure to check with each steering committee regarding the handling of agreement standards.
  • Overview of Restrictions (Excerpt from Agreement)
    (Restrictions on Buildings)
    Article 6 Use, form, structure, site, design, position and building equipment of buildings in the agreement area must be based on the standards set forth in the following items. Provided, however, that this shall not apply to those approved by the Steering Committee stipulated in Article 7.

    (1) The use of the building shall be as follows.
    B. Single-family homes
    B. A tenement house with two units
    Ha. Houses that also serve as offices, stores, and other similar uses, those stipulated in Article 130-3 of the Building Standards Law Enforcement Order
    Ni. Those attached to the buildings in the preceding items (excluding car garages)
    (2) The distance from the outer wall of the building or the surface of the pillar in place of this to the road boundary shall be 1.0 m or more, and the distance to the adjacent land boundary shall be 0.5 m or more. But it is not this limit about thing corresponding to any of the following in part of building or building in distance less than limit of this distance.
    B. The total length of the center line of the outer wall or the pillar in place of it must be 3m or less.
    B. Provided for storerooms and other similar uses, the height of the eaves must be 2.3m or less, and the total floor area must be within 5m2.
    (3) The height of the ground surface of the site shall not be changed. However, this does not apply to cuts and embankments for parking lots and stairs, slopes for wheelchairs, Tsukiyama in the garden, etc.
    (4) The height of the building shall not exceed 9.5m from the ground surface, and the height of the eaves shall not exceed 7m from the ground surface.
    (5) The number of floors of a building excluding the basement shall be 2 or less.
    (6) The site area shall be 125 m2 or more.
    (7) The roof of the building, the color of the outer wall, and the specifications of the gatepost, the pavement of the site, and the outdoor advertising materials shall be in harmony with the surrounding landscape.
    (8) The openings (excluding those facing the road) provided on the west and north walls of the building shall be constructed in consideration of the neighboring land, such as using glass, blindfolds, etc. Provided, however, that this shall not apply if the distance from the opening to the adjacent land boundary is more than 2.5m.
    (9) Wireless antennas or other similar items must not be installed outdoors.
    (10) The rooftop must not be installed anything other than solar panels, solar heat collection panels, or the like.
    (11) One or more Takagi shall be provided on the site, and a green space of 20% or more of the site area shall be secured. In this case, it can be regarded as 10 m2 per Takagi, 2 m2 per medium tree, and 0.4 m2 per shrubs (in this case, the tree height is 3 m or more for Takagi, 1 m or more and less than 3 m for middle trees, shrubs are less than 1 m.) 。
    (12) It is not possible to install a mount on the retaining wall of the site.
    (13) The height, position, and structure of the retaining wall at the time of the announcement of the building agreement approval must not be changed.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Bureau Regional Town Development Department Regional Town Development Division

Telephone: 045-671-2667

Telephone: 045-671-2667

Fax: 045-663-8641

Email address: tb-chiikimachika@city.yokohama.jp

Return to the previous page

Page ID: 614-876-794

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews