Business list (after examination)

Last Updated November 15, 2024

Business after the examination

 When looking for a business from the map, you can also see it from the assessment map (outside site).asesumap

Business in Yokohama City

Business list
No.Name of BusinessType of BusinessDate of submission of booksProcedure StatusLaws, etc.
1Yokohama Heliport Construction ProjectConstruction of an airfieldApril 15, 1980ServiceEnvironmental Impact Assessment Guidance Guidelines
2New construction of Meiji Gakuin University Tozuka School BuildingBusiness involving development activitiesNovember 27, 1980ServiceEnvironmental Impact Assessment Guidance Guidelines
3Urban Coastal Comprehensive Development Project (Minato Mirai 21 Plan)Business involving development activitiesNovember 5, 1981ServiceEnvironmental Impact Assessment Guidance Guidelines
4Daikoku Futo II (Part 2) District Public Water Landfill ProjectPublic water reclamationMay 25, 1982ServiceEnvironmental Impact Assessment Guidance Guidelines
5High-speed Gulf Line (from Honmoku to Kamariya)Construction of roadsNovember 30, 1982Partial serviceEnvironmental Impact Assessment Guidance Guidelines
6Overpass project between Komyoji and Kamiooka (Keikyu Shonan Line)Construction of railwaysApril 12, 1983ServiceEnvironmental Impact Assessment Guidance Guidelines
7National Route 1 Bypass Line (from Tokiwadai to Fujitsukacho)Construction of roadsDecember 10, 1983ServiceEnvironmental Impact Assessment Guidance Guidelines
8Urban Expressway Kanazawa Seaside LineConstruction of railwaysFebruary 24, 1984ServiceEnvironmental Impact Assessment Guidance Guidelines
9Sotetsu Izumino Line Phase 2 Extension ProjectConstruction of railwaysMay 10, 1985ServiceEnvironmental Impact Assessment Guidance Guidelines
10Higashitotsuka Kamishinano Comprehensive Development Project (including housing complex Research Institute)Business involving development activitiesJuly 8, 1985ServiceEnvironmental Impact Assessment Guidance Guidelines
11Urban Expressway No. 2 Municipal Subway Line 3Construction of railwaysSeptember 2, 1986ServiceEnvironmental Impact Assessment Guidance Guidelines
12Nagatsuta Specific Land Readjustment ProjectBusiness involving development activitiesMarch 31, 1987ServiceEnvironmental Impact Assessment Guidance Guidelines
13Public water reclamation project in Minamihonmokufuto areaPublic water reclamationJune 13, 1988Partial serviceEnvironmental Impact Assessment Guidance Guidelines
14Route 1 Bypass Line (from Kamikawai, Asahi-ku to Tsuda-cho, Midori-ku)Construction of roadsJuly 19, 1988ServiceEnvironmental Impact Assessment Guidance Guidelines
15Kamigo Development ProjectDevelopment activitiesNovember 8, 1988AbolitionEnvironmental Impact Assessment Guidance Guidelines
16(Tentative name) Maioka Research Park Development ProjectBusiness involving development activitiesJuly 17, 1989ServiceEnvironmental Impact Assessment Guidance Guidelines
17Construction of the Tsurumi Plant (tentative name) Environmental Business BureauConstruction of waste treatment facilitiesAugust 28, 1989ServiceEnvironmental Impact Assessment Guidance Guidelines
187th landfill project at Shinmeidai LandfillConstruction of waste treatment facilitiesOctober 26, 1989ServiceEnvironmental Impact Assessment Guidance Guidelines
19Kanagawa Police Headquarters Government Building Rooftop Heliport Installation ProjectConstruction of an airfieldDecember 7, 1990ServiceEnvironmental Impact Assessment Guidance Guidelines
20Tokyo Electric Power Company Yokohama Thermal Power Station Unit 7 and 8Construction of factories and business sitesOctober 1, 1991ServiceEnvironmental Impact Assessment Guidance Guidelines
21Yokohama Municipal Tokaichiba Housing Rebuilding BusinessBusiness involving development activitiesOctober 18, 1991ServiceEnvironmental Impact Assessment Guidance Guidelines
22Urban Expressway No. 1 Municipal Subway Line 1Construction of railwaysNovember 18, 1991ServiceEnvironmental Impact Assessment Guidance Guidelines
23Sotetsu Izumino Line 3rd extension projectConstruction of railwaysNovember 18, 1991ServiceEnvironmental Impact Assessment Guidance Guidelines
24Urban Expressway No. 4 Minato Mirai 21 Line (between Minato Mirai 21 and Motomachi)Construction of railwaysDecember 6, 1991ServiceEnvironmental Impact Assessment Guidance Guidelines
25High-speed Yokohama Loop South Line [Kamariya-cho, Kanazawa-ku to Kumizawa-cho, Totsuka-ku (Yokohama city area)]Construction of roadsMay 26, 1992Under constructionEnvironmental Impact Assessment Guidance Guidelines
26Public water reclamation project between Honmoku Futo B and C jettysPublic water reclamationJuly 9, 1992ServiceEnvironmental Impact Assessment Guidance Guidelines
27Construction of Kanazawa Plant (tentative name) Environmental Business BureauConstruction of waste treatment facilitiesMay 18, 1993ServiceEnvironmental Impact Assessment Guidance Guidelines
28Overpass project between Hiyoshi and Tsunashima Stations on the Tokyu Toyoko LineConstruction of railwaysOctober 25, 1993ServiceEnvironmental Impact Assessment Guidance Guidelines
29Urban Expressway No. 4 Minato Mirai 21 Line (between Yokohama Station and Minato Mirai 21 District)Construction of railways

May 13, 1994

ServiceEnvironmental Impact Assessment Guidance Guidelines
30Nippon Oil Refining Negishi Refinery Expansion PlanConstruction of factories and business sitesMay 23, 1994ServiceEnvironmental Impact Assessment Guidance Guidelines
31Power Development Isogo Thermal Power Plant Renewal (New Isoko No. 1 and 2) PlanConstruction of factories and business sitesOctober 6, 1995ServiceEnvironmental Impact Assessment Guidelines
32Shinkoyasu Station West Area Redevelopment ProjectConstruction of high-rise buildingsMarch 4, 1996ServiceEnvironmental Impact Assessment Guidelines
33Crossroad crossing project near Hoshikawa / Tennocho Station on the Sotetsu Main LineConstruction of railwaysJune 19, 1996ServiceEnvironmental Impact Assessment Guidelines
34Yokohama Marine Disaster Prevention Facilities Non-Public Heliport Development ProjectConstruction of an airfieldJune 26, 1996ServiceEnvironmental Impact Assessment Guidelines
35Large-scale buildings in the Kitanakadori Minami areaConstruction of high-rise buildingsNovember 7, 1996ServiceEnvironmental Impact Assessment Guidelines
36saijo Construction Project for North AreaBusiness involving development activitiesNovember 18, 1996ServiceEnvironmental Impact Assessment Guidelines
37Yokohama Port Said Block F-1 Urban Redevelopment ProjectConstruction of high-rise buildingsJuly 14, 1997ServiceEnvironmental Impact Assessment Guidelines
38Nippon Oil Refining Co., Ltd. Yokohama Refinery Power Plant Installation ProjectConstruction of factories and business sitesOctober 6, 1997ServiceEnvironmental Impact Assessment Guidelines
39Nippon Karit Hodogaya Plant Site Development PlanBusiness involving development activitiesNovember 5, 1997Partial serviceEnvironmental Impact Assessment Guidelines
40Tokyu Toyoko Line (between Yagami River Bridge and Hiyoshi Station) Double-track businessConstruction of railwaysMarch 27, 1998ServiceEnvironmental Impact Assessment Guidelines
41High-speed Yokohama Loop North LineNew construction of the Metropolitan Expressway, etc.June 29, 1998ServiceEnvironmental Impact Assessment Law
42Yokohama Shonan RoadConstruction of highway national roadsJune 26, 1998Under constructionEnvironmental Impact Assessment Law
43Negishi Refinery Gasification Complex Power PlantThermal power plantAugust 5, 1998ServiceEnvironmental Impact Assessment Law
44Urban Expressway No. 5 Municipal Subway Route 4Construction of ordinary railwaysOctober 8, 1998ServiceEnvironmental Impact Assessment Law
45Environmental Business Bureau Sakae Plant Renovation ProjectConstruction of waste treatment facilitiesMarch 10, 1999AbolitionEnvironmental Impact Assessment Guidelines
46(Tentative name) Seibu Shin-Yokohama Non-Public Heliport Development ProjectConstruction of an airfieldApril 15, 1999ServiceEnvironmental Impact Assessment Guidelines
47Yokohama Restyle (Re-Style) ProjectConstruction of waste treatment facilitiesAugust 15, 2002ServiceEnvironmental Impact Assessment Ordinance
48(Tentative name) Minato Mirai 21 District 40 Block Development PlanConstruction of high-rise buildingsNovember 15, 2002AbolitionEnvironmental Impact Assessment Ordinance
49Interior Development Project at YokohamayamaConstruction of high-rise buildingsNovember 20, 2002ServiceEnvironmental Impact Assessment Ordinance
50(Tentative name) Yokohama Port Said Block A-3 Development PlanConstruction of high-rise buildingsSeptember 19, 2003ServiceEnvironmental Impact Assessment Ordinance
51Term Intermediate Treatment Facility Installation BusinessConstruction of waste treatment facilitiesOctober 10, 2003ServiceEnvironmental Impact Assessment Ordinance
52(Tentative name) Kamiooka C Minami District Type 1 Urban Redevelopment ProjectConstruction of high-rise buildingsNovember 21, 2003ServiceEnvironmental Impact Assessment Ordinance
53Ougishima Power StationThermal power plantJanuary 22, 2004ServiceEnvironmental Impact Assessment Law
54Kosu Eco Factory Yokohama BayConstruction of waste treatment facilitiesApril 21, 2004ServiceEnvironmental Impact Assessment Ordinance
55Minami Honmoku Wharf Fifth Block Waste landfill Landfill Project (tentative name)Construction of waste treatment facilitiesJuly 9, 2004ServiceEnvironmental Impact Assessment Ordinance
56Yongchuan Gumi Daikokucho Head Office Plant Intermediate Processing ProjectConstruction of waste treatment facilitiesSeptember 21, 2004ServiceEnvironmental Impact Assessment Ordinance
57GE-TECHNOs Industrial Waste Management Facility Installation ProjectConstruction of waste treatment facilitiesOctober 27, 2004ServiceEnvironmental Impact Assessment Ordinance
58(Tentative name) New Campus of Orient Pharmaceutical UniversityConstruction of the National Institute of Natural SciencesNovember 4, 2004ServiceEnvironmental Impact Assessment Ordinance
59(Tentative name) Yokohama Kanazawa Cynthia R.C Center construction projectConstruction of waste treatment facilitiesSeptember 7, 2005ServiceEnvironmental Impact Assessment Ordinance
60(Tentative name) Kamigo Development ProjectBusiness related to development activitiesFebruary 10, 2006AbolitionEnvironmental Impact Assessment Ordinance
61Kitanakadori North District (A District) Redevelopment PlanConstruction of high-rise buildingsMay 22, 2006Under constructionEnvironmental Impact Assessment Ordinance
62Daikok Distribution Center Development ProjectBusiness related to development activitiesJuly 21, 2006AbolitionEnvironmental Impact Assessment Ordinance
63High-speed Yokohama Loop Northwest LineNew construction of the Metropolitan Expressway, etc.August 11, 2006ServiceEnvironmental Impact Assessment Law
64(Tentative name) Minato Mirai 21 Central District 42 Block Development PlanConstruction of high-rise buildingsMay 22, 2007ServiceEnvironmental Impact Assessment Ordinance
65(Tentative name) Minato Mirai 21 Central District 67 Block Development ProjectConstruction of high-rise buildingsJuly 20, 2007ServiceEnvironmental Impact Assessment Ordinance
66Sotetsu-JR Direct LineConstruction of railways and railroadsOctober 19, 2007ServiceEnvironmental Impact Assessment Ordinance
67(Tentative name) JFE Environment Co., Ltd. Tsurumi Eco Clean Construction ProjectConstruction of waste treatment facilitiesNovember 19, 2007ServiceEnvironmental Impact Assessment Ordinance
68Minato Mirai 21 43 Block CSK Group Headquarters Building Construction ProjectConstruction of high-rise buildingsJanuary 21, 2008AbolitionEnvironmental Impact Assessment Ordinance
69(Tentative name) Minato Mirai 21 Central District 46 Block Development ProjectConstruction of high-rise buildingsFebruary 5, 2008AbolitionEnvironmental Impact Assessment Ordinance
70(Tentative name) Construction of incineration ash recycling facilityConstruction of waste treatment facilitiesOctober 9, 2008AbolitionEnvironmental Impact Assessment Ordinance
71Sotetsu-Tokyu Direct LineConstruction of ordinary railwaysOctober 19, 2009ServiceEnvironmental Impact Assessment Law
72Tsurumi River Multipurpose Yusuichi Soil Detoxification Treatment ProjectConstruction of waste treatment facilitiesOctober 19, 2009End of businessEnvironmental Impact Assessment Ordinance
73(Tentative name) Yokohama-sta.-nishiguchi Station Building Project (JR Yokohama Tower, JR Yokohama Tsuruyacho Building)Construction of high-rise buildingsAugust 26, 2010ServiceEnvironmental Impact Assessment Ordinance
74(Tentative name) Minato Mirai 21 Central District 37 Block II Building PlanConstruction of high-rise buildingsSeptember 9, 2013End of procedureEnvironmental Impact Assessment Ordinance
75NIPPO Co., Ltd. (tentative name) Yokohama No. 2 Recycling Center New ProjectConstruction of waste treatment facilitiesMay 9, 2014AbolitionEnvironmental Impact Assessment Ordinance
76(Tentative name) Koshiba Oil Storage Facility Site Park Development PlanConstruction of sports facilities, recreation facilities, etc.July 31, 2014Partial serviceEnvironmental Impact Assessment Ordinance
77(Tentative name) Higashi Takashima Station North District C District Building PlanConstruction of high-rise buildingsMarch 11, 2015Under constructionEnvironmental Impact Assessment Ordinance
78Itech Co., Ltd. (tentative name) itech Ecopark Yokohama New BusinessConstruction of waste treatment facilitiesJune 11, 2015End of procedureEnvironmental Impact Assessment Ordinance
79Yokohama Station Kita-West Exit Tsuruya District Type 1 Urban Redevelopment ProjectConstruction of high-rise buildingsJune 19, 2015ServiceEnvironmental Impact Assessment Ordinance
80(Tentative name) New construction of APA Hotel & Resort <Yokohama Bay Tower>Construction of high-rise buildingsJuly 30, 2015ServiceEnvironmental Impact Assessment Ordinance
81Public water reclamation project in the Shinhonmokufuto area of Yokohama PortPublic water reclamationMarch 24, 2017Under constructionEnvironmental Impact Assessment Law
82Chugai Pharmaceutical Co., Ltd. Yokohama Research Center ProjectConstruction of the National Institute of Natural SciencesApril 11, 2017ServiceEnvironmental Impact Assessment Ordinance
83(Tentative name) Nakayama Station South Exit District Type 1 Urban Redevelopment ProjectConstruction of high-rise buildingsOctober 16, 2017End of procedureEnvironmental Impact Assessment Ordinance
84(Tentative name) Yokohama Gate Tower ProjectConstruction of high-rise buildingsJune 8, 2018End of procedureEnvironmental Impact Assessment Ordinance
85(Tentative name) Minato Mirai 21 Central District 37 Block Development PlanConstruction of high-rise buildingsAugust 22, 2018End of procedureEnvironmental Impact Assessment Ordinance
86Sotetsu Main Line (near Tsurugamine Station) Continuous Overpass Project

Construction of railways and railroads

September 10, 2018Under constructionEnvironmental Impact Assessment Ordinance
87Yokohama City Current City Hall Block Utilization ProjectConstruction of high-rise buildingsDecember 23, 2019Under constructionEnvironmental Impact Assessment Ordinance
88(Tentative name) Former Kamiseya Communication Facility Park Maintenance ProjectConstruction of sports facilities, recreation facilities, etc.January 9, 2020Under constructionEnvironmental Impact Assessment Ordinance
89(Tentative name) Urban Expressway Railroad Seya Line Development ProjectConstruction of railways and railroadsJanuary 9, 2020AbolitionEnvironmental Impact Assessment Ordinance
90Former Kamiseya Communication Facility District Land Readjustment ProjectLand readjustment projectJanuary 15, 2020Under constructionEnvironmental Impact Assessment Law
91Minato Mirai 21 Central District 53 Block Development ProjectConstruction of high-rise buildingsFebruary 28, 2020

End of procedure

Environmental Impact Assessment Ordinance
95(Tentative name) ENEOS Co., Ltd. R&D base construction projectConstruction of the National Institute of Natural SciencesMarch 5, 2021End of procedureEnvironmental Impact Assessment Ordinance
962027 International Horticultural ExpositionBusiness related to development activitiesMarch 18, 2021Under constructionEnvironmental Impact Assessment Ordinance
97(Tentative name) Kaigandori, Naka-ku, Yokohama-shi PlanConstruction of high-rise buildingsApril 19, 2021End of procedureEnvironmental Impact Assessment Ordinance
98Construction of a waste power generation incineration facility at Asahi Pretec Corporation Yokohama PlantConstruction of waste treatment facilitiesJune 15, 2021End of procedureEnvironmental Impact Assessment Ordinance
99(Tentative name) New construction of B-1 district in Kitanakadori north districtConstruction of high-rise buildingsAugust 13, 2021Under constructionEnvironmental Impact Assessment Ordinance
100(Tentative name) Kannai Ekimae Portmachi District Type 1 Urban Redevelopment ProjectConstruction of high-rise buildingsNovember 4, 2021Evaluation ReportEnvironmental Impact Assessment Ordinance
101Minato Mirai 21 Central District 52 Block Development Project PlanConstruction of high-rise buildingsDecember 3, 2021End of procedureEnvironmental Impact Assessment Ordinance
103Sanyu Plant Service Co., Ltd. Yokohama BAY Plant ProjectConstruction of waste treatment facilitiesDecember 27, 2022End of procedureEnvironmental Impact Assessment Ordinance

※A list of Class 2 projects that were judged before the introduction of the consideration book procedure (August 2011) and no longer require environmental impact assessment procedures.

Business list
No.Name of BusinessType of BusinessClass 2 Judgment DateLaws, etc.
1Yokohama Plant Construction ProjectConstruction of factories and business sitesJuly 2, 2003Environmental Impact Assessment Ordinance
2(Tentative name) Type 1 Urban Redevelopment Project in the South Exit of Futamatagawa StationConstruction of high-rise buildingsAugust 28, 2006Environmental Impact Assessment Ordinance

Business list
No.Name of BusinessType of BusinessDate of submission of booksProcedure StatusLaws, etc.
1Toa Oil Energy Supply FacilityThermal power plantMarch 25, 1999ServiceEnvironmental Impact Assessment Law
2Yokosuka Power Station Construction ProjectThermal power plantJanuary 11, 2001ServiceEnvironmental Impact Assessment Law
3Kawasaki City Planning Urban Expressway No. 1 Kawasaki Transit Expressway Railway Shinyurigaoka-Motosumiyoshi Construction ProjectConstruction of ordinary railwaysDecember 14, 2001AbolitionEnvironmental Impact Assessment Law
4Kawasaki Natural Gas Power PlantThermal power plantMay 16, 2002ServiceEnvironmental Impact Assessment Law
5Kawasaki Power Plant Replacement PlanThermal power plantMarch 6, 2006End of procedureEnvironmental Impact Assessment Law
6Kawasaki Thermal Power Station No. 2 Series 2-axis and 3-axis facilities expansion planThermal power plantSeptember 3, 2009ServiceEnvironmental Impact Assessment Law
7Chuo Shinkansen (between Tokyo and Nagoya)Construction of Shinkansen railwaysSeptember 26, 2011End of procedureEnvironmental Impact Assessment Law
8JFE Ougishima Thermal Power Plant Renewal PlanThermal power plantSeptember 5, 2014ServiceEnvironmental Impact Assessment Law
9Plan for expansion of Units 3 and 4 of Kawasaki Natural Gas Power PlantThermal power plantJune 10, 2015AbolitionEnvironmental Impact Assessment Law

Inquiries to this page

Environmental Impact Assessment Division, Environmental Conservation Department, Green Environment Bureau

Telephone: 045-671-2495

Telephone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page