Electrical equipment section style downloading

Last Updated July 31, 2023

List of documents to be submitted

1.Documents required at the time of construction contract and at the time of commencement

Documents to be submitted
NumberDocument nameSubmission deadline

Submission method

Documents
1Instructions for “Methods for Separation and Demolition, etc.”

Construction contract
Prior to submission

E-mail, etc.Resources and Waste Recycling Bureau
2Construction start documents

Construction contract
Deadline for Description

E-mail, etc.Housing and Architecture Bureau
3Breakdown of contract price

After the conclusion of the contract
5 Date of opening

E-mail, etc.Housing and Architecture Bureau
4Process schedule

After the conclusion of the contract
5 Date of opening

E-mail, etc.Housing and Architecture Bureau

5

On-site proxy/agent, Chief Engineer, Supervising Engineer, Special Supervising Engineer, Assistant to Supervising Engineer

After the conclusion of the contract
5 Date of opening

E-mail, etc.Housing and Architecture Bureau
6Guarantee (prepayment guarantee)

Prepayment invoice
At the time of submission

1 original copy
(Representative seal)

7Invoice (for advance payment)At the time of request for advance payment

1 original copy
E-mail, etc.

8Fire insurance securities (copy)After the insurance policy arrivesE-mail, etc.
9Construction work insurance policy (copy)After the insurance policy arrivesE-mail, etc.
10Emergency Communication SystemWhen the construction organization is decidedE-mail, etc.
11Collins Techris Notice (Request for Confirmation for Registration)

After the conclusion of the contract
10 Date of opening

Collins system
12Corins Techris Registration Confirmation Form (Registration Order)

After the conclusion of the contract
10 Date of opening

Collins system
13Construction industry retirement allowance mutual aid system allocation report (Form No. 1)2 months after the conclusion of the contract1 original copyBid door (outside site)
14Mount for submitting payment receipt (Form No. 033)After receipt of certificate stamp1 original copyBid door (outside site)
15Reason for delay in submission of storage documents (construction retirement mutual aid system)2 months after the conclusion of the contractE-mail, etc.Housing and Architecture Bureau
16Pledge on the Protection of Personal InformationBefore starting constructionE-mail, etc.Civic Affairs Bureau
17Training Implementation Report on Personal Information ProtectionBefore starting constructionE-mail, etc.Civic Affairs Bureau
18Recycling Resource Utilization Plan
Covlis (COBRIS) Construction by-product information exchange system - for construction materials-
Before starting constructionE-mail, etc.
19Recycling Resource Utilization Promotion Plan
Covlis (COBRIS) Construction by-product information exchange system - Construction by-product unloading work-
Before starting constructionE-mail, etc.
20Explanatory materials for the survey results specified in Article 18-15, Paragraph 1 of the Air Pollution Control ActBefore starting constructionE-mail, etc.
21Appointed General Safety and Health Officer registration formBefore starting constructionE-mail, etc.Housing and Architecture Bureau
22Pre-Consultation Check Sheet for Electronic DeliveryBefore starting constructionThe supervisor in charge sends an email to the site proxy/agent.

Finance Bureau

23Comprehensive Construction PlanBefore starting constructionE-mail, etc.Housing and Architecture Bureau
24Implementation ScheduleBefore starting constructionE-mail, etc.Reference (PDF: 284KB)
25Safety Management PlanBefore starting constructionE-mail, etc.Reference (PDF: 66KB)

2.Documents required during construction

Documents to be submitted
NumberDocument nameSubmission deadlineSubmission methodDocuments
1Notice of Selection of Professional Engineers

A professional engineer
When specified

E-mail, etc.Housing and Architecture Bureau
2Construction system ledger (including construction system diagram and worker list)

Subcontract Contract
After the conclusion

E-mail, etc.Finance Bureau
Subcontractor Selection Notice

Subcontract Contract
After the conclusion

E-mail, etc.Housing and Architecture Bureau
Subcontract Contract Record

Subcontract Contract
After the conclusion

E-mail, etc.Housing and Architecture Bureau
6List of specialized companies

Subcontract Contract
After the conclusion

E-mail, etc.Housing and Architecture Bureau
7Construction Meeting BookFrom time to time

1 original copy
(Institute proxy/agent)

Reference (PDF: 225KB)
8Construction Industry Retirement Payment Mutual Aid certificate stamp Payment Book (Form No. 2) (at the time of change)After receipt of certificate stamp1 original copyBid door (outside site)
9Mount for submitting payment receipt (Form No. 033)After receipt of certificate stamp1 original copyBid door (outside site)
10Request for consent for construction materials, etc.When determining materialsE-mail, etc.Housing and Architecture Bureau
11Construction drawingBefore constructionE-mail, etc.
12Materials for consultation with related organizationsBefore constructionE-mail, etc.
13Construction plan by type of construction (including construction guidelines)Before constructionE-mail, etc.Housing and Architecture Bureau
14About (construction / power outage work) of private electric facilities10 days before work dayE-mail, etc.Reference (PDF: 98KB)
15Electrical equipment work plan10 days before work dayE-mail, etc.Reference (PDF: 260KB)
16Industrial Waste Treatment PlanBefore unloading industrial wasteE-mail, etc.Housing and Architecture Bureau
17Industrial Waste Disposal ReportAfter disposal of industrial wasteE-mail, etc.Housing and Architecture Bureau
18Notification of confirmation and disposal of construction by-productsBefore unloading industrial wasteE-mail, etc.Housing and Architecture Bureau
19Monthly construction report (including construction report, construction progress report table, construction record photo, and monthly schedule of the following month)5th of the following month1 original copyReference (PDF: 84KB)
202-day weekly holiday acquisition planEnd of the previous monthE-mail, etc.Finance Bureau
212-day weekly holiday acquisition results16th of this monthE-mail, etc.Finance Bureau
22Notification of on-site leave

3 days before holidays

E-mail, etc.Housing and Architecture Bureau
23Construction Material Inspection Application Form specified in the design documents7 days before the inspection date1 original copyReference (PDF: 277KB)
24Out-of-site inspection application7 days before the inspection date1 original copyHousing and Architecture Bureau
25Test ReportsAt the end of the testE-mail, etc.
26Check sheet for electrical equipment construction inspectionAt the end of the in-house inspectionE-mail, etc.Reference (PDF: 75KB)
27Application for partial inspection of construction work completed14 days before the inspection date1 original copyHousing and Architecture Bureau
28Volume Calculation Report14 days before the inspection dateE-mail, etc.Reference (PDF: 324KB)
29Application for extension of construction completion deadline

Completion deadline
At the time of application for extension

E-mail, etc.Housing and Architecture Bureau
30Process schedule (at the time of change)

Completion deadline
At the time of extension

E-mail, etc.Housing and Architecture Bureau
31Collins Techris Notice (Request for Confirmation for Registration)

After the change agreement
10 Date of opening

Collins system
32Collins Techris Registration Confirmation (Change Registration)

After the change agreement
10 Date of opening

Collins system
33Accident ReportIn the event of an accident

1 original copy
(Representative seal)

Housing and Architecture Bureau
34Notice of Emergency MeasuresWhen emergency measures are needed1 original copyHousing and Architecture Bureau

3.Documents required for completion

Documents to be submitted
NumberDocument nameSubmission deadlineSubmission methodDocuments
1Return of generated materialsWhen returning generated materials, etc.

E-mail, etc.

Reference (PDF: 79KB)
2Construction Industry Retirement Payment Mutual Aid certificate stamp Payment Book (Form No. 2) (when completed)At the time of completion1 original copyBid door (outside site)
3Construction Industry Retirement Payment Mutual Aid certificate stamp Paste Performance Report (Form No. 3)At the time of completion1 original copyBid door (outside site)
4Payment appropriation results summary table (Form No. 031)At the time of completion1 original copyBid door (outside site)
5Electrical equipment ledgerAt the time of completionE-mail, etc.Housing and Architecture Bureau
6Completed booksAt the time of completion

A4 file
Electronic media

7Completed drawingAt the time of completion

Bookbinding
Electronic media

8Construction photos (including completed photos)At the time of completionElectronic media
9Recycling Resource Utilization Implementation Statement
Covlis (COBRIS) Construction by-product information exchange system - for construction materials-
At the time of completionE-mail, etc.
10Recyclable Resource Utilization Promotion Implementation
Covlis (COBRIS) Construction by-product information exchange system - Construction by-product unloading work-
At the time of completionE-mail, etc.
11Recycling ReportAt the time of completionE-mail, etc.Resources and Waste Recycling Bureau
12Materials related to asbestosAt the time of completionE-mail, etc.Reference External Site
13Completed construction registration formregistration formDate of completion1 original copyHousing and Architecture Bureau
14Delivery of construction objectsInspection date

1 original copy
(Representative seal)

Housing and Architecture Bureau
15Collins Techris Notice (Request for Confirmation for Registration)10 days after the inspectionCollins system
16Collins Techris Registration Confirmation Form (Completion Registration)10 days after the inspectionCollins system
17Invoice (partial payment, settlement payment)

1 original copy
E-mail, etc.


4.Documents required for non-conformance repair

Documents to be submitted
NumberDocument nameSubmission deadlineSubmission methodDocuments
Inspection report of nonconformity with contract

Non-conformance
After inspection

1 original copy
(Representative seal)

Housing and Architecture Bureau
2Record table (electricity) for inspection and repair measures for non-conformity

Non-conformance
After inspection

1 original copyHousing and Architecture Bureau
3Subscription Plan for Nonconformity

Non-conformance
After inspection

E-mail, etc.Housing and Architecture Bureau
4Recommendation Report for Nonconformity

Non-conformance
After repair

1 original copy
(Representative seal)

Housing and Architecture Bureau

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Electrical Equipment Division, Public Architecture Department, Housing and Architecture Bureau

Telephone: 045-671-2975

Telephone: 045-671-2975

Fax: 045-664-5244

Email address: kc-denki@city.yokohama.lg.jp

Return to the previous page

Page ID: 762-722-728