- Yokohama-shi Top Page
- Business
- Bidding and Contracts
- Style download
- Housing and Architecture Bureau
- Electrical equipment construction work manual
Here's the text.
Electrical equipment construction work manual
Last Updated October 24, 2024
About electrical equipment construction work manual
The "Electrical Equipment Construction Work Manual" is a supplement to the "Yokohama City Building Bureau Electric Equipment Construction Special Regulations", and was created as a commentary on the "Special Rules" and a construction procedure. The purpose of this book is to be edited according to the "Special Rules" and to be carried out smoothly by using it together with the "Special Rules". The “Construction Manual” describes the main specifications of electrical equipment work, etc., and does not cover all specifications. For details, please consult with the supervisor before constructing.
Notice
July 31, 2023 Electrical Equipment Construction Manual (2023 version) has been released.
Download the electrical equipment construction manual
Items | Main contents | Download |
---|---|---|
Part 1 General Common Matters | General matters and common matters | Part 1 (PDF: 367KB) |
Part 2 Electric Power Equipment Construction | Piping wiring work, installation of equipment and board | Part 2 (PDF: 414KB) |
Part 3 Receiving Substation Equipment Construction | Specification of equipment, installation of equipment, test of construction, confirmation before and after receiving power | |
Part 4 Electricity Storage Equipment Construction | Equipment specifications, equipment installation, construction testing, confirmation of installation conditions | Part 4 (PDF: 212KB) |
Part 5 Power Generation Equipment Construction | Specification of equipment, installation of equipment, confirmation of installation conditions, confirmation of legal standards | Part 5 (PDF: 226KB) |
Section 6 Communication and Information Equipment Construction | On-site replacement equipment, electric clocks, loudspeakers and emergency broadcasting equipment | Part 6 (PDF: 308KB) |
Part 7 Central Monitoring and Control Equipment Construction | Equipment and Construction | Part 7 (PDF: 145KB) |
Full-text batch download | Full text (PDF: 889KB) |
※ For the documents related to the construction of Part 8, please refer to the Application Form.
Electrical equipment construction work manual (complanatory note) (2023 version)
The Electrical Equipment Construction Work Manual (Commentary Statement) (edited by the Dengyo Association of Kanagawa Prefecture and the Dengyo Association of Yokohama City) complements the Electric Equipment Construction Work Manual.
It shall be a manual for correctly communicating the intent of the provision.
Contact: (one company) Yokohama Electric Construction Association (outside site)
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Maintenance Planning Division, Public Architecture Department, Housing and Architecture Bureau
Telephone: 045-671-2956
Telephone: 045-671-2956
Fax: 045-664-5477
Email address: kc-eizenkikaku@city.yokohama.lg.jp
Page ID: 104-130-510