Electronic delivery procedures and standards for Yokohama City
Last Updated April 1, 2023
◆Notice◆
If the guidelines and guidelines are partially revised during the application period, the text will be revised at any time and an errata will be posted. At this time, the date shows the latest version of the correction date, so please check it.
As a standard in accordance with the Ministry of Land, Infrastructure, Transport and Tourism's March 2016 standard (geology and soil survey was October 2016, government office maintenance standards were 2018 version)), various standards for electronic delivery were revised in March 2019. Revised as version.
In addition, this standard is applied on October 1, 2019 to respond to the revision of the Yokohama City Electronic Delivery Checker. If it is necessary to apply in advance, use it after sufficient consultation between the ordering party, such as inspection methods.
Please refer to page of "Electronic delivery point, standard of Yokohama-shi (old version)" about conventional standards.
Guidelines and Standards
Name | Date of formulation | Download | Errata |
---|---|---|---|
Digital Photo Management Information Standards | March, 2019 (Applicable to R01.10) | ― | |
Procedure for Electronic Delivery of Construction Completed Books [Civil Engineering] | March, 2019 (Applicable to R01.10) | ― | |
Guidelines for Operation of Electronic Delivery, etc. [Civil Engineering] | March, 2019 (Applicable to R01.10) | ― | |
Electronic delivery procedures for design work, etc. [Civil engineering] | March, 2019 (Applicable to R01.10) | ― | |
Electronic Delivery Operation Guidelines [Business] | March, 2019 (Applicable to R01.10) | ― | |
CAD drawing standard [Civil engineering] | March, 2019 (Applicable to R01.10) | ― | |
Operation Guidelines for CAD Drawing Standards [Civil Engineering] | March, 2019 (Applicable to R01.10) | ― |
Name | Date of formulation | Download | Errata |
---|---|---|---|
Procedure for Electronic Delivery of Construction Completed Books [Telecommunications Equipment] | March, 2019 (Applicable to R01.10) | ― | |
Guidelines for Operation of Electronic Delivery, etc. [Construction of Telecommunications Equipment] | March, 2019 (Applicable to R01.10) | ― | |
Electronic delivery procedures for design work, etc. [telecommunication equipment] | March, 2019 (Applicable to R01.10) | ― | |
Electronic Delivery Operation Guidelines [Telecommunications Equipment Business] | March, 2019 (Applicable to R01.10) | Revisions (PDF: 729KB) | ― |
CAD drawing standard [telecommunication equipment] | March, 2019 (Applicable to R01.10) | Revisions (PDF: 311KB) | ― |
Operation Guidelines for CAD Drawing Standards [telecommunication equipment] | March, 2019 (Applicable to R01.10) | ― |
Please refer to the Civil Engineering section for digital photo management information standards.
Name | Date of formulation | Download | Errata |
---|---|---|---|
Procedure for Electronic Delivery of Construction Completed Books [Mechanical Equipment Construction] | March, 2019 (Applicable to R01.10) | ― | |
Electronic Delivery Operation Guidelines [Mechanical Equipment Construction] | March, 2019 (Applicable to R01.10) | ― | |
Electronic delivery procedures for design work, etc. [Mechanical equipment construction] | March, 2019 (Applicable to R01.10) | ― | |
Electronic Delivery Operation Guidelines [Mechanical Equipment Construction Business] | March, 2019 (Applicable to R01.10) | ― | |
CAD drawing standard [Mechanical equipment construction] | March, 2019 (Applicable to R01.10) | ― | |
Operation Guidelines for CAD Drawing Standards [Mechanical Equipment Construction] | March, 2019 (Applicable to R01.10) | ― |
Name | Link |
---|---|
Electronic delivery procedure (draft) Machinery and equipment construction / Facility equipment code (Ministry of Land, Infrastructure, Transport and Tourism) | Refer to the “Facility Equipment Code” of the Ministry of Land, Infrastructure, Transport and Tourism. Link to "Ministry of Land, Infrastructure, Transport and Tourism_Guidelines / Standards_Mechanicals" (outside site) |
Please refer to the Civil Engineering section for digital photo management information standards.
Name | Date of formulation | Download | Errata |
---|---|---|---|
Electronic delivery procedure for completed construction books [Building and Building Equipment] | March, 2019 (Applicable to R01.10) | ― | |
Electronic delivery procedures for design work, etc. [Building and Building Equipment] | March, 2019 (Applicable to R01.10) | ― | |
CAD drawing standard (draft) [Building and Building Equipment] | March, 2007 | ― | |
Electronic Delivery Operation Guidelines [Building and Construction Equipment Construction] | March, 2019 (Applicable to R01.10) | ― | |
Electronic Delivery Operation Guidelines [Building and Building Equipment Business] | March, 2019 (Applicable to R01.10) |
Please refer to the Civil Engineering section for digital photo management information standards.
Name | Date of formulation | Download | Errata |
---|---|---|---|
Electronic Delivery Operation Guidelines [Geology and Soil Survey] | March, 2019 | ― | |
Electronic Delivery Operation Guidelines [Survey] | March, 2019 (Applicable to R01.10) | ― |
Please refer to the Civil Engineering section for digital photo management information standards.
Name | Date of formulation | Download | Errata |
---|---|---|---|
Electronic Delivery Operation Procedure (draft) [Construction] | April, 2013 | Full text (PDF: 1,345KB) | - |
Electronic Delivery Operation Procedure (draft) [Business] | October, 2011 | Full text (PDF: 1,235KB) | - |
Electronic delivery operation procedure manual (draft) [Building maintenance] | October, 2011 | Full text (PDF: 1,271KB) | - |
Name | Date of formulation | Download | Remarks |
---|---|---|---|
Preliminary consultation check sheet [for construction] | March, 2019 | Check sheet (Excel: 186KB) | Applied in October 2019 |
Preliminary consultation check sheet [Business use] | March, 2019 | Check sheet (Excel: 115KB) | Applied in October 2019 |
Preliminary consultation check sheet [for building repair and construction] | March, 2019 | Check sheet (Excel: 114KB) | Applied in October 2019 |
Preliminary consultation check sheet [Building repair / commercial use] | March, 2019 | Check sheet (Excel: 105KB) | Applied in October 2019 |
Preliminary consultation check sheet [for construction] | October, 2011 | Check sheet (Excel: 105KB) | |
Preliminary consultation check sheet [Business use] | October, 2011 | Check sheet (Excel: 105KB) | |
Preliminary consultation check sheet [for building repair and construction] | February, 2010 | Check sheet (Excel: 125KB) | |
Preliminary consultation check sheet [Building repair / commercial use] | February, 2010 | Check sheet (Excel: 103KB) | |
Electronic media delivery note [Construction] | March, 2021 | Delivery note (word: 30KB) | |
Electronic medium delivery note [Business] | March, 2021 | Delivery note (word: 31KB) | |
Electronic medium delivery note [Building repair / construction] | March, 2021 | Delivery note (word: 31KB) | |
Electronic media delivery note [Building Maintenance and Operations] | March, 2021 | Delivery note (word: 31KB) |
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Public Works Coordination Division, Finance Bureau Facility Management Promotion Office
Telephone: 045-671-4084
Telephone: 045-671-4084
Fax: 045-651-7599
Email address: za-cals@city.yokohama.jp
Page ID: 496-607-186