Menu

Close

Here's the text.

Nagata Hirato Tanikawa

Last Updated March 23, 2021

Hirato Nagatanikawa originates near Noba-cho, Konan-ku, flows almost parallel to Route 2, joins the Akuwa River in Kashiocho, Totsuka-ku, and forms the Kashio River.

Sight

Green is seen only in the middle stream, but as it flows through the urban areas of Konan Ward and Totsuka Ward, it is a river with little green overall.

Upstream there is a main road from Loop Route 2 to Kaminagaya Station on the Municipal Subway, Nagatani Tenman-gu Shrine to the south, and a small forest that is a green landmark.

Renovation was started in 1970, and the planned renovation extension is 4.92 km from the junction of Akuwa River to Morai Bridge. The river line of about 1.5 km from the middle cat bridge to the upstream is maintained, and upstream from Yanagibashi flows along Loop Route 2.

Introduction of waterside

Waterside of Kaminagaya Fureai

Waterside

Along with the renovation plan, a part of the old riverbed that has disappeared, about 350m from Temma Miyashita to Yanagibashi, has been maintained as a babbling promenade park. The park is divided in some places by roads that go to Loop Route 2, such as Ipponbashi, but it is popular as a relaxing space on Loop Route 2, which has a lot of traffic.

Data

Nagata Hirato Tanikawa
Management categorySakaigawa River System Second Class River
Management extension4,920m

Inquiries to this page

River Planning Division, River Department, Sewerage River Bureau

Telephone: 045-671-4215

Telephone: 045-671-4215

Fax: 045-651-0715

Email address: gk-kasenkikaku@city.yokohama.lg.jp

Return to the previous page

Page ID: 778-416-428

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews