Menu

Close

  1. Yokohama-shi Top Page
  2. Municipal Government Information
  3. Public Relations, Public Information, News
  4. Press release
  5. Transportation Bureau
  6. Press Release FY2019
  7. About conduct of municipal Subway Blue Line whole line normal operation [Follow-up report about derailment 9]

Here's the text.

About conduct of municipal Subway Blue Line whole line normal operation [Follow-up report about derailment 9]

Last Updated June 11, 2019

Press release materials

June 11, 2019

Transportation Bureau Electric Dept.

Kazuhiro Fukushima

Phone number: 045-664-2525 (Call Center)

Fax: 045-322-3913

At 5:00 on June 11, 2019
 We deeply apologize for any inconvenience to our customers and citizens since the derailment accident occurred on June 6.
 Regarding the accident train temporarily stored at Shonandai Station, the forwarding work to the Kaminagaya depot early this morning, and the two lines at Shonandai Station can be used. We carry out operation by regular schedule from the first train.
1 Operating schedule
 From the first train today, it will be operated on a regular schedule.
 During the daytime hours, rapid driving is also carried out, and the entire line (Shonandai-Azami Noma) approximately every 5 to 10 minutes.
 During rush hours, it runs every 4 minutes in the morning and 6 minutes in the evening.
 Transfers to other company lines will not be made.
Municipal Subway timetable [transfer / timetable search / City of Yokohama, Transportation Bureau] (outside site)
2 Accident Train forwarding
 For the accident train being detained on Shonandai Station Line 2, a construction vehicle moved from the Azamino area are combined, and the journey of about 11 km to Kaminagaya depot is carefully forwarded over an hour, 2 am It was stored in the depot at 40 minutes.
3 Future response to derailment accidents
 Since the restoration work has a certain level of prospect, we will begin full-scale verification of the cause of the accident and study measures to prevent recurrence for safe operation.
In order to regain trust in municipal traffic, the staff will work together on the safety first operation.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Return to the previous page

Page ID: 988-045-856

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews