Procedures for construction, etc. in the area of urban development projects

When we are going to build building before decision such as business plans based on Land Readjustment Act or Urban Redevelopment Act in enforcement district of city area development business, "building permission based on Town Planning and Zoning Act Article 53" Must be received. In addition, in the enforcement area of the land readjustment project, from the start of the project to the day when there is a public notice of land replacement, changes in the characteristics of the land that may hinder the enforcement of the land readjustment project, buildings and structures When we are going to perform new construction, remodeling or extension, we must receive "building permission based on Land Readjustment Act Article 76".

Last Updated September 30, 2024

■Window of building permission based on Town Planning and Zoning Act Article 53

List of building permission windows based on Article 53 of the City Planning Act
Business name District Urban Development Bureau
Section in charge
Location: Phone number
Yokohama-sta.-nishiguchi
Type 1 Urban Redevelopment Project

Nishi Ward
・Minami Koichi Chome

Urban Revitalization Division

〒231-0005
Honmachi, Naka-ku
10, 6-50, 10

671-2693

Kanazawa Bunko Station East Exit area
Type 1 Urban Redevelopment Project
Kanazawa Ward
・Yatsu-cho
Urban Area Maintenance Promotion Section

671-3779

Southern district of Shin-Yokohama Station
Land readjustment project

Kohoku Ward
・Shinohara-cho
・Mamedo-cho
・Kishinecho

Urban Revitalization Division

671-3858

Northern part of Futatsu Bridge
Land readjustment project
(※)

Seya Ward
・Futatsubashicho
・Tono
・Seyacho
・Center
・Hajime Aizawa-chome to 7-chome
・4, Hongo
・Azumanodai

Urban Area Maintenance Promotion Section

671-3738

Nakayama Station South Exit Area
Type 1 Urban Redevelopment Project

Midori Ward
・Daimuracho
・Terayamacho

Urban Area Maintenance Promotion Section

671-3513

Tsunashima Station East Exit Station Area
Type 1 Urban Redevelopment Project

Kohoku Ward
・1, Tsunashimahigashi
・2, Tsunashimahigashi

Around East Exit Tsunashima Station
Development Office

〒223-0053
1, Tsunashimanishi, Kouhoku-ku
No. 8 9-501

531-9600

(※) About building permission based on Town Planning and Zoning Act Article 53 in Futatsu Bridge northern district land readjustment project
   Excludes the land readjustment project area in the first area of the roadside area, such as the northern part of Futatsu Bridge Mitsukyo Shimokusayanagi Line.

■Window for building permission based on Article 76 of the Land Readjustment Act

[City enforcement district] List of building permission windows based on Article 76 of the Land Readjustment Act
Business name Urban Development Bureau
Section in charge
Location: Phone number
Futatsu Bridge Northern Mitsukyo Shimokusayanagi Line, etc.
Roadside District Phase 1
Land readjustment project
Futatsu Bridge Northern Land Readjustment Office
Guide map (PDF: 357KB)

〒246-0021
467-23, Futatsubashicho, Seya-ku

363-3110
Area around Shin-Tsunashima Station
Land readjustment project
East Exit Development Office, Tsunashima Station

〒223-0053
1-8-9-501 Tsunashima Nishi, Kohoku-ku

531-9600

Former Kamiseya Communication Facility Area
Land readjustment project

Decarbonization, GREEN x EXPO Promotion Bureau
Kami-Seya Maintenance Office Kami-Seya Maintenance Promotion Section

〒246-0003
5810-6, Seyacho, Seya-ku

900-0594

[Effective areas such as unions] List of building permission windows based on Article 76 of the Land Readjustment Act
Business name Urban Development Bureau
Section in charge
Location: Phone number
Higashi Takashima Station North District
Land readjustment project

Minato Mirai
Toshin Nagawa Coastal Area Promotion Section

〒231-0005
6-50-10, Honcho, Naka-ku

671-3857

■About procedure of building permission based on Town Planning and Zoning Act Article 53 or Land Readjustment Act Article 76

About submission of permission application and return of permission letter of advice (request)

・Please contact us in advance by telephone before applying. Consultation and mailing windows vary depending on the procedure, so please check the window list.
・Procedures pertaining to Article 53 of the City Planning Act and Article 76 of the Land Readjustment Act require cooperation in submitting documents by mail.
・Return of the permission letter after the procedure will be mailed with the letter pack plus (red) for reply submitted at the time of application.

Permit procedure period

21 days after the appropriate document arrives (standard processing period).
However, please note that it may take longer than the standard processing period due to inadequate documents.

required documents

・Two copies of the permission application and various attached documents are required, and one copy of the letter pack plus (red) is required.
・The paper size of attached documents should be A3 in principle.
・If the two sides of the elevation and cross section do not fit in A3, please write one side at a time in A3.
・If you have any questions, please contact the window list (department in charge) by phone.

required documents
required documents Building permit based on Article 53 of the City Planning Act Building permit based on Article 76 of the Land Readjustment Act
1 Application for Approval

Approval Application Form (PDF: 75KB)

Approval Application Form (Word: 24KB)

Application for approval, etc. (PDF: 203KB)

Application for approval, etc. (word: 27KB)

2 Reply letter pack plus (red)

Returns it using the submitted letter pack plus (red). Please fill in the "Postal Code" and "Delivery Address" before submitting.
※Please note that this is different from the letter pack light (blue).

3 Power of Attorney

There is no provision in the power of attorney format. Please fill in the delegation item with "Anything about the City Planning Act Article 53 permission application and permission" or "Anything about the Land Readjustment Act Article 76 permission application and permission". seal is not required for the power of attorney.

4

Guide map

Scale: 1/2,500 or more, site location, public facilities around the site, etc.

5 Layout drawing

Scale: 1/500 or more
Describes the position, direction, site boundary, relationship between site and road of building on site

Scale: 1/200 or more
6 Floor plan Scale: 1/200 or more
7 Elevations

Scale: Elevations of 1/200 or more and 2 or more

Scale: 1/200 or more
8 Cross-sectional view Scale: Cross-sectional view of 1/200 or more and 2 or more Scale: 1/200 or more
9

Browse diagram of each floor

・Wooden is not required
・Not required when attaching a “Molder Certificate for Type Materials, etc.”

10

Frame diagram

・Wooden is not required
・Not required when attaching a “Molder Certificate for Type Materials, etc.”

11

Basic drawing

・Wooden is not required
・Not required when attaching a “Molder Certificate for Type Materials, etc.”

12

Manufacturer's certificate for model components, etc.

・Wooden is not required

13 Structural diagram Scale: 1/200 or more
14 Quadrature diagram Scale: 1/200 or more
15 Other necessary documents In addition, city may ask for documents necessary for examination.

Styles, attachments, etc. (Building permission application based on Article 53 of the City Planning Act)

Application style, attachments, etc. (Building permission application based on Article 53 of the City Planning Act)
Application type Form (PDF) Form (Word)
Permit application Permit application (PDF: 75KB)

Permit application (word: 24KB)

Change registration form
(When making minor changes to the permission already obtained)

Change registration form (PDF: 153KB)

Change registration form (Word: 25KB)

Succession of position registration form
(When succeeding the status of permission already obtained)

Succession of position registration form (PDF: 153KB) Succession of position registration form (Word: 17KB)

Notification of cancellation
(When canceling permission already obtained)

Notice of cancellation (PDF: 144KB) Notice of cancellation (word: 17KB)

Notification of withdrawal
(If you are applying for permission and withdraw your application before obtaining permission.)

Notification of withdrawal (PDF: 144KB) Notification of withdrawal (word: 17KB)

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Coordination Division, Urban Development Bureau Urban Development Department

Telephone: 045-671-2695

Telephone: 045-671-2695

Fax: 045-664-7694

Email address: tb-seibichosei@city.yokohama.lg.jp

Return to the previous page