Procedure for buildings in area of urban development business

About "planning permission based on Town Planning and Zoning Act Article 53" and "planning permission based on land adjustment method Article 76"

Last update date April 20, 2020

For prevention of new coronavirus infection spread ask (about submissions such as permission applications and return such as permission notifications)

For prevention of new coronavirus infection spread, as for the procedure to affect Town Planning and Zoning Act Article 53 and land adjustment method Article 76, I would like cooperation for submission of documents by "mail" for the time being.
In addition, in return such as permission notifications after procedure, we will mail in letter pack plus for reply having you enclose at the time of submission.
In addition, before submission, I would like consultation with telephone.

Permission procedure period

After documents arrived; 21 days (standard processing period)
But please note that you may take by discrepancy more than standard processing period.

Required documents (permission application and two copies of various attached books are necessary for one copy of letter pack plus.)

Planning permission based on Town Planning and Zoning Act Article 53

1.Permission application
2.Proxy (when entrusted)
3.Guide map (1/2500 reduced scale that listed direction, site position, public facilities around the site or more things)
4.Plan (1/500 reduced scale that listed position, direction of building in site, site boundary line, site and relations with road or more things)
5.Ground plan (1/200 reduced scale or more things)
6.Elevation (1/200 reduced scale or more things. We need more than two elevations.)
7.Cross section (1/200 reduced scale or more things. We need more than two cross sections.)
8.kakukaishoryofusezu (in the case of wooden construction, do not need) (※ 1)
9.Figure of Class axis (in the case of wooden construction, do not need) (※ 1)
10.kisofusezu (in the case of wooden construction, do not need) (※ 1)
11.Model materials the manufacturer certification book (in the case of wooden construction, do not need) (※ 1)
12.Letter pack plus (※ 2) for reply

※1: "Model materials when the manufacturer certification book" is attached, "kakukaishoryofusezu", "kisofusezu" is unnecessary "figure of Class axis".

※2: Letter pack plus for reply is red. As you are different from blue letter pack, please be careful. Please submit after filling out "zip code" and the "destination" column.

Planning permission based on land adjustment method Article 76

1.Permission application
2.Proxy (when entrusted)
3.Document (when applicant and landowner are not the same people) which proves that we have use authority
4.Guide map
5.Plan (1/200 reduced scale or more things)
6.Ground plan (1/200 reduced scale or more things)
7.Cross section (1/200 reduced scale or more things)
8.Elevation (1/200 reduced scale or more things)
9.Figure of structure (1/200 reduced scale or more things)
10.Figure of mensuration (1/200 reduced scale or more things)
11.Other necessary books (※ 3)
12.Letter pack plus (※ 2) for reply

※3: In addition, we shall attach necessary documents when city is necessary for examination.

Mailing address

Please refer to the following for mailing address.

Planning permission based on Town Planning and Zoning Act Article 53

When you are going to build building before notification of decision such as the land adjustment method or business plan based on Urban Redevelopment Law or the authorization in the enforcement district of urban development business, you are to have to receive permission of the mayor based on Town Planning and Zoning Act Article 53.
※As for required documents, the number of copies, the instructions at the time of application, please see each style.
※When you make slight change, please submit after performing prior consultation with the person in charge.
※As you changed part of point on April 1, 2020, please confirm application styles.

Application style, attachment
Application classification Style (PDF) Style (Word)
Permission application Permission application (PDF: 133KB)

Permission application (word: 24KB)

Change registration form
(when we perform slight change about permission that we already acquired)

Change registration form (PDF: 163KB)

Change registration form (word: 27KB)

Succession registration form of position
(when we succeed position about permission that we already acquired)

Succession registration form (PDF: 153KB) of position Succession registration form (word: 17KB) of position

Report of cancellation
(when we cancel permission that we already acquired)

Report of cancellation (PDF: 154KB) Report of cancellation (word: 17KB)

torishitatodoke
(when, during application of permission, we withdraw application before the permission acquisition)

torishitatodoke (PDF: 153KB) torishitatodoke (word: 17KB)

List of windows (charge is different for each business district.)

List of planning permission windows based on Town Planning and Zoning Act Article 53
Business name District Urban Development Bureau
Department in charge
The location Phone number
Yokohama-sta.-nishiguchi
First-class Urban District Redevelopment Project

Nishi Ward
・The south Koichi chome

The downtown area reproduction section

〒231-0005
6-50-10, Honcho, Naka-ku
(the city hall)

045-671-3543
Kanazawa-Bunko Station East Exit district
First-class Urban District Redevelopment Project
Kanazawa Ward
・Yatsu-cho
City area maintenance promotion section 045-671-3779
District in southern Shin-Yokohama Station
Land readjustment project

Kohoku Ward
・Shinohara-cho
・Mamedo-cho
・Kishinecho

The downtown area reproduction section 045-671-3858
District in northern Futatsu Bridge
Land readjustment project

Seya Ward
・Futatsubashicho
・Tono
・Seyacho
・The center
・Hajime Aizawa chome - 7
・4, Hongo
・Azumanodai

City area maintenance promotion section 045-671-3738

Nakayama Station south exit district
First-class Urban District Redevelopment Project

Midori Ward
・Daimuracho
・Terayamacho

City area maintenance promotion section 045-671-3513

About planning permission based on Town Planning and Zoning Act Article 53 in district land readjustment project in northern Futatsu Bridge

Planning permission based on land adjustment method Article 76

In the enforcement district of land readjustment project, notification of disposal of replotting is to have to receive permission of the mayor about act that may cause the enforcement failure of land readjustment project until one day.

List of windows (charge is different for each business district.)

List of planning permission windows based on city enforcement district land adjustment method Article 76
Business name Urban Development Bureau
Department in charge
The location Phone number
Mitsukyo Shimosoyagi lines in northern Futatsu Bridge
Roadside district first district
Land readjustment project
Land adjustment office in northern Futatsu Bridge
Guide map (PDF: 357KB)

〒246-0021
467-23, Futatsubashicho, Seya-ku

045-363-3110
Around new Tsunashima Station district
Land readjustment project
Tsunashima Station East Exit outskirts development office

〒223-0053
1-8, Tsunashimanishi, Kouhoku-ku 9-501

045-531-9600

Associations glance through planning permission window based on enforcement district land adjustment method Article 76
Business name Urban Development Bureau
Department in charge
The location Phone number
Yumegaoka, Izumi district
Land readjustment project
City area maintenance promotion section

〒231-0005

6-50-10, Honcho, Naka-ku

(the city hall)

045-671-2678
Minamikouchi, Kawamukai-cho district
Land readjustment project
City area maintenance promotion section 045-671-2678
Around Kawawacho Station west district
Land readjustment project
City area maintenance promotion section 045-671-3519
Daiba fourth district
Land readjustment project
City area maintenance promotion section 045-671-3513
2, Hazawaminami, Kanagawa district
Land readjustment project
The downtown area reproduction section 045-671-3858
Higashi Takashima Station north district
Land readjustment project
The downtown area reproduction section 045-671-3782

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Urban Development Bureau city area Maintenance Division city area maintenance adjustment section

Telephone: 045-671-2695

Telephone: 045-671-2695

Fax: 045-664-7694

E-Mail address [email protected]