Menu

Close

Here's the text.

Inspection and investigation of the construction and construction system

Last Updated December 10, 2024

Simultaneous inspection of the construction system

From October to December every year, in line with the Ministry of Land, Infrastructure, Transport and Tourism's “National Simultaneous Inspection of Construction System”, a simultaneous inspection will be conducted to ensure and thoroughly secure an appropriate construction system at construction sites.
Inspections for fiscal 2024 have been completed.

Inspection procedures for construction systems at construction sites, etc.

This guideline stipulates inspection items to be grasped in supervision work, etc., regarding the construction system of contract work ordered by Yokohama City, which contributes to securing the appropriate construction system at the construction site.

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Public Works Coordinating Division, Facility Management Promotion Department, Finance Bureau Facility Management Promotion Office

Telephone: 045-671-2025

Telephone: 045-671-2025

Fax: 045-651-7599

Email address: za-kjchosei@city.yokohama.jp

Return to the previous page

Page ID: 348-521-924

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews