After contracting VE method
Implementation of the VE method in construction
Last Updated August 21, 2024
Regarding the construction and manufacturing (excluding the manufacture of goods) ordered by Yokohama City, in order to reduce the cost of construction by actively utilizing private technology development, after the conclusion of the contract, the construction specified in the design documents We accept proposals for changes in design documents related to construction materials, construction methods, etc. that can reduce the contract price without degrading the function and performance of the object.
After Yokohama-shi contract VE method conduct summary (PDF: 158KB)
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Public Works Coordination Division, Finance Bureau Facility Management Promotion Office
Telephone: 045-671-4084
Telephone: 045-671-4084
Fax: 045-651-7599
Email address: za-kjchosei@city.yokohama.jp
Page ID: 382-217-598