Development of the eastern saijo (tentative name)
Last Updated November 14, 2024
In Motoichi, declining birthrate and aging progress more and more in future, and aging rate is expected to exceed 26% in 2025 (Reiwa 7). The number of deaths is expected to increase, and the demand for cremation is expected to continue to increase.
Currently, the city's saijo is operated by the municipal 4 saijo and the private 1 saijo, and the municipal saijo has made various efforts to maintain a stable supply of cremation over the future.
The city recognized this situation as an urgent issue, and decided to develop a new saijo to meet the increasing demand for cremation.
Completed image
Table of Contents (Click each item to move to that item.)
Topics
- September 30, 2024 saijo (tentative name) Maintenance Communication No.7 for eastern areas was issued.
- Progress of construction
Outline of maintenance
Public Relations
Various procedures
- Evaluation of Public Works (Preliminary Evaluation)
- Urban planning procedures
- Procedure of the regulations about permission of management such as Yokohama-shi graveyards
- Other procedures
Current status
Progress of construction
Outline of maintenance
Location map
Location: 18-18, Daikokucho, Tsurumi-ku, Yokohama-shi and others
Outline of maintenance
Outline of scale, etc. |
|
---|---|
Crematory furnace equipment |
|
Maintenance Offices |
|
Business schedule |
|
※This is the current assumption. It is subject to change depending on future business progress.
Public Relations
Maintenance Communications
In order to convey the progress of our business, we have published a public relations paper called the Eastern saijo (tentative name) Maintenance Communication.
No. | Date of issuance | Data | Overview |
---|---|---|---|
1 | July, 2018 | Maintenance Communication No.1 (PDF: 735KB) |
|
2 | May, 2019 | Maintenance Communication No.2 (PDF: 673KB) |
|
3 | March, 2020 | Maintenance Communication No.3 (PDF: 484KB) |
|
4 | May, 2021 | Maintenance Communication No.4 (PDF: 1,014KB) |
|
5 | December, 2021 | Maintenance Communication No.5 (PDF: 1,455KB) |
|
6 | March, 2023 | Maintenance Communication No.6 (PDF: 1,075KB) |
|
7 | September, 2024 | Maintenance Communication No.7 (PDF: 1,209KB) |
|
Briefing Session
We hold briefings to inform the progress of our business.
NO. | Fiscal year | Date and time | Location | Materials | Remarks |
---|---|---|---|---|---|
1 | 2017 |
| Namamugi District Center (4-6-37, Barley, Tsurumi-ku) | The content is the same for each session. | |
2 | 2018 |
| Namamugi District Center (4-6-37, Barley, Tsurumi-ku) | The content is the same for each session. | |
3 | 2019 |
| Namamugi District Center (4-6-37, Barley, Tsurumi-ku) | The content is the same for each session. | |
4 | 2020 | Video distribution from Friday, March 19, 2021 to Monday, April 19, 2021 | Yokohama-shi homepage |
| |
5 | 2021 | Video distribution from Monday, October 25, 2021 to Wednesday, November 24, 2021 | Yokohama-shi homepage |
| |
6 | 2022 |
| Namamugi District Center (4-6-37, Barley, Tsurumi-ku) | The content is the same for each session. | |
7 | 2024 |
| Namamugi District Center (4-6-37, Barley, Tsurumi-ku) | The content is the same for each session. |
Various procedures
Evaluation of Public Works (Preliminary Evaluation)
About eastern part saijo (tentative name) maintenance business, we carried out public works evaluation (prior evaluation) based on Yokohama-shi public works evaluation system in 2019. As we decided prior evaluation record based on deliberation result of Yokohama-shi public works evaluation committee and citizen opinion offer result, we announce result as follows.
Public Works Evaluation Committee | Deliberation results and minutes of the 3rd Committee in FY2019 (PDF: 419KB)
|
---|---|
Citizen opinion offer result | Opinion for citizen opinion and opinion for citizen opinion (PDF: 117KB) |
Preliminary Evaluation Report | ※There is no change from the pre-evaluation record (draft) announced on March 2, 2020. |
For an overview of the system, please see the page of the Finance Bureau Facility Management Promotion Section.
Urban planning procedures
On February 4, 2022, the city planning change of the crematorium (addition of eastern saijo) was announced. The name of the city planning is "Tobu saijo", but the current name is "Tobu saijo". The name as a citizen-use facility will be determined in the ordinance of the City Counsil, with reference to the opinions of those involved.
Contents | Date and time | Overview |
---|---|---|
City draft briefing session | From June 9, 2021 to July 9, 2021 | About document, please see page of Housing and Architecture Bureau City Planning Division. |
City Planning Council | January 14, 2022 | The agenda for this project has been passed. In addition, about the deliberation situation, please see page of Housing and Architecture Bureau City Planning Division. |
Procedure of the regulations about permission of management such as Yokohama-shi graveyards
When we establish crematorium newly and are going to run, it is necessary to receive permission based on law about graveyard, burial. In addition, in receiving permission, it is necessary to perform procedure based on the regulations about permission of management such as Yokohama-shi graveyards.
Contents | Date and time | Overview |
---|---|---|
Briefing Session | June 28, 2022 |
A briefing session was held based on Article 23 of the Ordinance. [Target person of explanation]Within the horizontal distance from the boundary of the crematorium's management permission area is within 110 meters
[Explanatory materials] ・Crematorium management permission briefing materials (PDF: 4,708KB)[Explanation contents, questions, etc.] ・Crematorium management permission briefing session summary (PDF: 303KB) |
Other procedures
No. | Contents | Date and time | Overview |
---|---|---|---|
1 | Briefing session based on the ordinance on the conservation, etc. of the living environment pertaining to construction and development projects of middle- and high-rise buildings in Yokohama City | June 28, 2022 |
When building a building of a certain size or more, install a sign at the planned site and explain the architectural plan to nearby residents etc. [Target person of explanation]The horizontal distance from the site boundary line of middle- and high-rise buildings, etc. is within 15 meters, and the horizontal distance from the outer wall of middle- and high-rise buildings or the surface of pillars in place of this is within 50 meters.
|
Current status
The following is a report on the progress of the project.
No. | Date of publication | Reporting destination | Materials | Overview |
---|---|---|---|---|
1 | October 24, 2017 | Health and Welfare and Medical Committee | Basic Survey on New saijo Development Study (Interim Report) (PDF: 2,380KB) | Status of studies on the development of the new saijo |
2 | January 30, 2018 | Press release | We will build a new saijo (crematorium) in the eastern area. (PDF:253KB) | About developing a new saijo in Daikoku-cho, Tsurumi-ku |
3 | December 12, 2018 | Health and Welfare and Medical Committee | About the examination situation of eastern saijo (tentative name) maintenance business (interim report) (PDF: 620KB) | Review of Business Methods |
4 | December 13, 2019 | Health and Welfare and Medical Committee | About the examination situation of eastern saijo (tentative name) maintenance business (interim report) (PDF: 422KB) | About basic way of thinking of partial shape change of planned site and maintenance |
5 | March 12, 2021 | Health and Welfare and Medical Committee | Progress of the Eastern saijo (tentative name) maintenance project (interim report) (PDF: 611KB) | About the status of examination of basic design and environmental impact assessment (independent) |
6 | September 21, 2021 | Health and Welfare and Medical Committee | Progress of the Eastern saijo (tentative name) maintenance project (interim report) (PDF: 1,103KB) | Progress of Basic Design |
7 | May 31, 2022 | Health and Welfare and Medical Committee | Progress of the Eastern saijo (tentative name) maintenance project (interim report) (PDF: 872KB) | About the current design outline and the procedures planned for this fiscal year |
8 | December 16, 2022 | Health and Welfare and Medical Committee | Progress of the Eastern saijo (tentative name) maintenance project (interim report) (PDF: 429KB) | Future maintenance schedules, maintenance costs, soil contamination survey results, etc. |
9 | December 16, 2022 | Press release | About result of soil contamination investigation in eastern saijo (tentative name) maintenance site (PDF: 492KB) | About the results of soil contamination surveys conducted at the maintenance site |
10 | September 15, 2023 | Health and Welfare and Medical Committee | About introduction of designated manager system to Kuboyama Saijo and eastern saijo (tentative name) (PDF: 306KB) | About introduction of designated manager system |
11 | April 17, 2024 | Health and Welfare and Medical Committee | Progress of the Eastern saijo (tentative name) maintenance project (interim report) (PDF: 1,581KB) | About temporary contract conclusion of construction work and maintenance schedule |
Progress of construction
2024
We are working on mountain retaining and earthwork. (November 2024)
The eastern saijo (tentative name) will drill about 8 meters of ground to build a parking lot on the first basement floor.
Mountain retaining work was carried out in advance so that the surrounding soil to be excavated does not collapse. The construction method for the retaining work is based on the SMW method so that the surrounding groundwater does not flow into the area dug.
In earthwork, we plan to proceed with the construction in two stages: primary drilling and secondary drilling. Currently, we are digging to the depth of the primary drilling and constructing an earth anchor to support the mountain retaining.
Heavy equipment in Yamadome
Primary drilling
Heavy equipment for earth anchor
Construction commenced (July 2024)
The builder of the construction work was decided to be Taisei, Matsuo, and Watanabe Kensetsu consortium, and a temporary enclosure was set up in June, and the ground improvement work was started immediately in July. (Static tightening sand pile method: A steel pipe (casing pipe) is penetrated into the ground, sand is injected into the ground from the steel pipe, and a cylindrical sand pile with a diameter of about 70 cm and a depth of about 6 m is installed. This prevents liquefaction of the ground during a major earthquake. )
In addition, the installation of two temporary site offices has been completed on the land adjacent to the construction site, and construction has begun in earnest.
Site Status
Static tightening sand pile method
Temporary site offices
The installation of the underground heat exchanger for underground heat construction has been completed (April 2024).
In the eastern saijo (tentative name), air conditioning is performed using underground heat.
In order to utilize this geothermal heat, underground heat exchangers (U-shaped plastic pipes with a diameter of about 3.5 cm) were installed at 49 locations within the saijo project site.
Drilling status by drilling machine
Underground heat exchanger tip
Underground heat exchanger mounting status
<Reference: What is the use of underground heat?>
The temperature inside the ground, which is more than 10m above the surface, is almost stable, not only in the season, is cooler than outside temperature in summer, and warmer than outside temperature in winter. The use of this stable heat is called "ground heat utilization."
In order to use this underground heat, the underground heat exchanger will be embedded deep underground and water will be circulated to collect heat and use it for cooling and heating.
(Source) Ministry of the Environment's "Intermediate Heat Utilization System" pamphlet
You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
Inquiries to this page
Health and Social Welfare Bureau General Affairs Department Environmental Facilities Division
Telephone: 045-671-4386
Telephone: 045-671-4386
Fax: 045-664-6753
Email address: kf-kankyo@city.yokohama.jp
Page ID: 167-976-917