Menu

Close

Here's the text.

Frequently Asked Questions about the Landscape System

Last Updated February 26, 2024

1. System in general

Q
(1-1) When building a building or a structure on this (specific) site, is it necessary to follow the Landscape Act and Landscape Ordinance?
A

(1-1)
Currently, only the following four districts need notification and consultation based on the Landscape Act and Landscape Ordinance.

The types of activities that require procedures vary depending on the district. For details, please refer to the window guidance flyer (about areas requiring notification and consultation) (PDF: 250KB).
For areas other than the above, procedures for the Landscape Act and the Landscape Ordinance are not required.

Q
(1-2) Where should I consult when planning in a district where the procedures of the Landscape Act and Landscape Ordinance are required?
A

(1-2)
Please consult with the department in charge below.

About outdoor advertising matter, please talk with Urban Development Bureau scenery adjustment section outdoor advertising matter charge (045-671-2648).

Q
(1-3) In areas where the procedures of the Landscape Act and Landscape Ordinance are not required, can the color or material of the building be anything?
A

(1-3)
We may establish standard in other systems such as city planning and town planning consultation district, building agreement.
About the presence or absence of district designation by other systems, please confirm in "town development map information (i-mappie)" (outside site).

2 Landscape plan

Q
(2-1) Does the area where notification is not required outside the area of the landscape plan?
A

(2-1)
Yokohama City has a landscape planning area throughout the city.
Currently, only the following four districts are required to be notified (landscape promotion districts).

There is no need to submit a report for acts such as construction outside the landscape promotion area and development activities.
In addition, in "town development map information (i-mappie)" (outside site), in the case of area where report is necessary, there is indication called "landscape plan (landscape promotion district: XX district)". In the case of an area where notification is not required, there is a display called "Landscape Plan (all city areas)".

Q
(2-2) What is the content of the landscape plan for all city areas? Is it necessary to submit a report?
A

(2-2)
We establish "landscape plan about development activity of slope green tract of land" for all city areas. This means that in order to properly guide development on slope green tracts and create a comfortable living environment, the height of the law (glue) and greening when land of 500 square meters or more performs development activities on "forests" land It defines the standards for greening. Since these standards are confirmed at the time of the examination of the development permit, it is not necessary to submit a landscape plan.

Q
(2-3) When should I submit a report?
A

(2-3)
The start of construction is restricted for 30 days from the day after the notification, so a notification is required at least 31 days before the start. In addition, in the case of act targeted for cityscape discussion, please perform cityscape discussion prior to report.

Q
(2-4) What happens if you build a building that does not meet the standards of the landscape plan?
A

(2-4)
We may perform recommendation based on scenery law or change order so that the mayor performs design changes.

Q
(2-5) What happens to existing buildings (buildings that have been before the enforcement of the landscape plan) that do not meet the standards?
A

(2-5)
Unless the current situation is changed, it can be left as it is (existing ineligible), but in the future, it is necessary to conform to the current standards when repainting the color etc. in the future.

3 Urban Landscape Consultation Area

Q
(3-1) What is the city landscape consultation?
A

(3-1)
With cityscape discussion, based on "the regulations about creation of attractive cityscape of Yokohama-shi (landscape regulations)", act such as construction of building in district designated as "cityscape consultation district" (cityscape formation act) When we perform, we say discussion to perform with city about design.
This consultation aims to create a higher quality landscape that matches the individuality of the district by conducting discussions between the city and the company based on matters (act guidelines) that should serve as guidelines for landscape formation in the district. I am aiming.

Q
(3-2) When should I make an offer for consultation?
A

(3-2)
Since there is a great relationship with the design concept, etc., please submit a consultation as soon as possible in the design. Construction cannot be started until after the cityscape consultation has been completed.

Q
(3-3) What is a specific urban landscape formation act?
A

(3-3)
Of the acts subject to city landscape consultation (city landscape formation acts), acts that have a particularly large impact on the landscape are referred to as "specific city landscape formation acts." When there is proposal of discussion about specific cityscape formation act, city decides discussion matter and policy of discussion after hearing opinion from Yokohama-shi city beauty measures council. Applicable acts are determined for each district, so please contact the person in charge of each district for details.

Q
(3-4) Is it possible for a third party to know the content of the consultation?
A

(3-4)
We can read contents of discussion in the following section window. In addition, a sign stating the contents of the consultation will be installed at the planned site until the construction is completed.
Kannai-District: Urban Revitalization Division, Urban Development Bureau(045-671-2673)
Minato Mirai 21 Central District: Urban Development Bureau Minatomirai Toshin Nagawa Coastal Promotion Division(045-671-3516)
Minato Mirai 21 New Port Area: Port and Harbor Bureau Maintenance Promotion Division(045-671-7342)
Yamate-District: Urban Revitalization Division, Urban Development Bureau(045-671-2673)

4 Creation of local landscape rules

Q
(4-1) Where should I consult if I want to make local landscape rules?
A

(4-1)
Please consult with the consultation center and corner of the town rules.

Q
(4-2) Can specific uses (such as pachinko parlors) be prohibited?
A

(4-2)
We can limit use of building by city planning or building agreement. Please see rule comparison table (PDF: 133KB) of town about limit contents every rule.

Q
(4-3) What kind of procedures are there to create local landscape rules?
A

(4-3)
Please refer to the page of "Rules for Towns to Create Together" for regional consensus building and drafting plans. Procedures vary from rule to rule, but for example, in the case of a landscape plan, it is stipulated by law and regulations to inspect the plan, receive a written opinion, and listen to the opinions of the Council for Urban Beauty Measures and the Council for City Planning. .

You may need a separate PDF reader to open a PDF file.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

Inquiries to this page

Urban Development Bureau Regional Town Development Department Landscape Adjustment Section

Telephone: 045-671-3470

Telephone: 045-671-3470

Fax: 045-550-4935

Email address: tb-keicho@city.yokohama.jp

Return to the previous page

Page ID: 358-710-219

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews