- Documents to be submitted after building confirmation and each inspection steel frame construction
Here's the text.
Documents to be submitted after building confirmation and each inspection steel frame construction
Last Updated July 30, 2024
- Scale of inspection conducted by the person in charge of structure: Buildings over the second floor or more or more than 200m2 have not been certified.
- For intermediate inspection and completion inspection of wooden structuresIn charge of guidanceIt's the page.
- Up to 2 weeks before the start of construction
- Up to one week before the start of construction
- Intermediate inspection process
- How to reserve an intermediate inspection
- Submission of an interim inspection application
- Items to be attached to the application form
- Documents to be submitted at the time of interim inspection
- Points of Intermediate Inspection
- If you pass the intermediate inspection
- If you do not pass the intermediate inspection
- Issuance of intermediate inspection pass certificate
- Up to one week prior to completion inspection
- Submission of completed inspection application
- Documents to be submitted at the time of completion inspection
- Reporting test results of building materials
Confirmation application
Issuance of Confirmed Certificate
<Up to 2 weeks before the start of construction>
At least two weeks before the start of the construction, the builder shall submit a “Notification of Appointment of Construction Supervisor and Construction Worker” to a copy of a document certifying that the construction has been supervised and undertaken (eg, construction supervision and construction work) Please attach and submit a contract conclusion certificate).
However, in the case of directly managed construction by the builder, it is not necessary to submit attached documents.
<Up to one week before the start of construction>
When the builder performs the following construction, the construction supervisor or construction builder of the construction concerned must submit the following construction plan (Yokohama City Building Standard Law Enforcement Detailed Regulations Article 17-3 (Hereinafter referred to as "Details").
- Root cutting work with a height of more than 3m
Outline of construction plan for mountain retaining work - Root cutting work with a height of more than 5m
Construction plan for mountain retaining work
※For details on the report on mountain retaining workAbout report about mountain retaining constructionPlease refer to the following page. - Construction of buildings with a floor area of 3rd floor or more or a floor area of 500m2 or more
Steel frame construction work plan
Start of construction
<Intermediate inspection process>
The S structure performs an intermediate inspection twice when the foundation reinforcement is completed and when the junction of the shaft is completed. Please refer to the page on the intermediate inspection process for the timing of the intermediate inspection.
<Reservation method for intermediate inspection>
Please make a reservation by phone 10 to 14 days before the intermediate inspection.
Building Guidance Division Structure Manager - TEL: 045-671-4536
Please note that if the inspection is crowded, you may not be able to make a reservation on the desired inspection date.
End of a specific process
Application for intermediate inspection
<Submission of an interim inspection application>
Please submit an interim inspection application (from 1 to 4) from 4 days before the scheduled inspection date to the day before.
On the four pages, entry can be omitted by submitting a report (construction supervision / construction status) based on Article 12, Paragraph 5 of the Building Standards Law.
A fee is required for the inspection.
For details on how to calculate fees, please refer to the page on how to calculate intermediate inspection fees.
<Attached to the application form>
- Site guide map
- Underground map of the part to be inspected (If the construction is divided, specify the inspection range.)
Intermediate inspection
<Documents to be submitted at the time of interim inspection>
- When foundation reinforcement is completed
- When jointing of the frame is completed
- Report (Construction supervision and construction work) based on Article 12, Paragraph 5 of the Building Standards Act-Steel structure-
- Steel frame construction results report(Limited to construction of buildings with a floor area of 3rd floor or more or a floor area of 500m2 or more.)
※Reports up to the relevant inspection portion
<Points of Interim Inspection>
- When foundation reinforcement is completed
- Sites and Buildings
The length of the site in contact with the road
Placement of buildings
Retreat distance from the road - Securing reinforcing bars
Lower part of the beam
Base top and bottom edge - Position of Reinforcing bar
Spacing of main line
Position of medium suspension reinforcing bar - Human hole, penetration sleeve
Positions in vertical and horizontal directions
Securing the appearance of star wrap around the sleeves
- Sites and Buildings
- When jointing of the frame is completed
- Check the construction status of the pillar leg (a check sheet is required depending on the product).
- Welding conditions
Check if the welding was performed properly. - Deviation of marking of high power bolts
At the time of high force bolt construction, marking is performed after the primary tightening, and the difference in marking after the secondary tightening is confirmed. - Construction status of the composite deck
Check the pitch of the baking stopper welding and the stud to ensure the fixation level. (Check sheet is required depending on the product.)
<If you pass the intermediate inspection>
If you pass the intermediate inspection, you can proceed to the subsequent process.
However, this cannot be done only after receiving the intermediate inspection pass certificate. (Article 7-3 of the Building Standards Act)
In Yokohama City, a sticker (see the figure below) for which the intermediate inspection has been carried out is attached to the building confirmation display board at the end of the inspection.
<If the intermediate inspection is not passed>
If you do not pass the intermediate inspection, you will not be able to proceed to the subsequent process.
It is necessary to take necessary measures such as re-inspection and reporting, and pass the intermediate inspection.
Issuance of intermediate inspection pass certificate
<Issuance of intermediate inspection pass certificate>
An intermediate inspection pass certificate will be issued by the person in charge of the structure.
Start of construction after a specific process
<Up to one week before completion inspection>
The completion inspection will be conducted by the instructor.
Please make a reservation by phone 10 to 14 days before the completion inspection.
Building Guidance Division Guidance Section - TEL: 045-671-4531
Please note that if the inspection is crowded, you may not be able to make a reservation on the desired inspection date.
Completed construction
<Submission of completion inspection application>
Please submit the completion inspection application (from 1 to 4) from 7 days before the scheduled inspection date to the day before.
The entry of the structure related on the four pages can be omitted by submitting a construction supervision and construction status report.
A fee is required for the inspection.
For the report attached to the completion inspection application, please see the report form download of the supervisor.
<Documents to be submitted at the time of completion inspection>
Please submit the following report to the person in charge of construction before completion inspection.
- Construction Supervision and Construction Status Report
- Steel frame construction results report(Limited to construction of buildings with a floor area of 3rd floor or more or a floor area of 500m2 or more.)
<Report of test results of building materials>
The following reports may be submitted after each process is completed. (Article 17-5 of the Detailed Regulations)
- Concrete strength test report
- Reinforced Pressure Test Report
- Welded part ultrasonic inspection test report
- Reinforcing bar, steel mill sheet
- Other test results report
- Photo of construction work
Completion inspection
Certificate of inspection
All the tests have been completed.
The certificate of inspection will be issued by the instructor.
Inquiries to this page
Building Guidance Division, Housing and Architecture Bureau Building Guidance Department
Telephone: 045-671-4531
Telephone: 045-671-4531
Fax: 045-681-2437
Email address: kc-shidotanto@city.yokohama.lg.jp
Page ID: 632-505-845