Fees for building confirmation application, inspection, etc.

Last Updated July 30, 2024

Contents

1. Building confirmation application and inspection fee

2. Additional amount when conducting an examination pursuant to the provisions of the proviso of Article 6-3, Paragraph 1 of the Building Standards Act
(When a building to which Route 2 is applied, structural calculation suitability judgment is no longer required)

3. Additional amount when performing a completion inspection of a building that has a duty to comply with the standards of Article 11 of the Act on Improvement of Energy Consumption Performance of Buildings

4. Fees for temporary use certification

5. Fees for permission (Article 85 of the Building Standards Act) for temporary exhibition halls

6. Fee of permission (Article 87-3 of the Building Standards Act) when temporarily used as a building for other uses

Building confirmation application and inspection fee (revised on May 1, 2009)
Total area
(In the case of intermediate inspection)
Subject to inspection
Floor area of the portion
Confirmation application
Fees
(※1・2)
Plan changes, etc.
Fees
(※1・2)
Intermediate inspection
Fees
(※3)
Completion inspection fee
(※4)
Intermediate inspection
Specified
Intermediate inspection
None Specified
30m2 or less10,000 yen10,000 yen15,000 yen15,000 yen16,000 yen
More than 30m2 and less than 100m218,000 yen18,000 yen18,000 yen18,000 yen19,000 yen
More than 100m2 and less than 200m228,000 yen28,000 yen23,000 yen24,000 yen25,000 yen
More than 200m2 and less than 500m236,000 yen36,000 yen32,000 yen31,000 yen34,000 yen
More than 500m2 and less than 1,000m266,000 yen66,000 yen52,000 yen55,000 yen58,000 yen
More than 1,000m2 and less than 2,000m293,000 yen93,000 yen70,000 yen75,000 yen78,000 yen
More than 2,000m2 and less than 5,000m2160,000 yen160,000 yen100,000 yen110,000 yen120,000 yen
More than 5,000m2 and less than 10,000m2280,000 yen280,000 yen160,000 yen180,000 yen190,000 yen
More than 10,000m2 and less than 30,000m2370,000 yen370,000 yen210,000 yen230,000 yen240,000 yen
More than 30,000m2 and less than 50,000m2460,000 yen460,000 yen260,000 yen290,000 yen300,000 yen
More than 50,000m2900,000 yen900,000 yen530,000 yen600,000 yen610,000 yen
Building equipment (*5)Elevator escalator17,000 yen10,000 yen------21,000 yen
Elevators exclusively for parcels8,000 yen5,000 yen------13,000 yen
Workpieces (including amusement facilities) (*5)15,000 yen9,000 yen------15,000 yen

※1 When conducting an examination pursuant to the provisions of the proviso of Article 6-3, Paragraph 1 of the Building Standards Act
Fees will be added to the amount in the table. (Structural calculation suitability judgment is not required.)
2.Additional amount when conducting an examination pursuant to the provisions of the proviso of Article 6-3, Paragraph 1 of the Building Standards Act
(When structural calculation suitability judgment is no longer required for buildings to which Route 2 is applied)
※2 Change, relocation, large-scale repair, large-scale remodeling and use of building plans
Confirmation application fee for change shall be calculated by multiplying the total floor area by 0.5.
The amount corresponding to the area obtained. However, the floor area will be changed due to changes in the plan of the building.
In the case of an increase, it shall be the amount corresponding to the floor area of the increase.
Please contact us separately for confirmation application fees when there is a plan change.

※3 Except in cases where it falls under Article 7-3, item 1 of the Building Standards Act, the total floor area pertaining to construction shall be
Buildings less than 50m2 are not specified as specific processes.

※4 Completion inspection fee pertaining to the relocation of buildings, large-scale repairs and large-scale remodeling is:
The amount corresponding to the area obtained by multiplying the total floor area of the relevant part by 0.5.

※5 Confirmation application fee for elevators and amusement facilities is the application fee per vehicle.

Building confirmation application and inspection fee (revised on June 1, 2015)
Examination according to the provisions of the proviso of Article 6-3, Paragraph 1 of the Building Standards Act
Fee calculation base floor area (*)
Additional amount of confirmation application fee
(per building in terms of structure)
1,000 m2 or less156,000 yen
More than 1,000m2 and less than 2,000m2209,000 yen
More than 2,000m2 and less than 10,000m2240,000 yen
More than 10,000m2 and less than 50,000m2318,000 yen
More than 50,000m2587,000 yen

※ According to Article 20, Paragraph 2 of the Building Standards Act, through expansion joints, etc.
Calculated based on the floor area of each building, which is regarded as separate buildings, and each building in another building.

For details on procedures, please contact the department in charge.

[Contact] City of Yokohama, Housing and Architecture Bureau Building Guidance Division
Telephone: 045-671-4536

3. Additional fee at the time of completion inspection of buildings such as energy saving conformity judgment

The completion inspection fee for buildings that have received the conformity judgment of the Building Energy Conservation Law includes the following fee according to the total use of non-residential parts of buildings such as energy saving conformity judgment and floor area to the current completion inspection fee. please.

Additional amount when conducting an examination pursuant to the proviso of Article 6-3, Paragraph 1 of the Building Standards Act (revised on April 1, 2021)
Total floor areaAdditional amount related to energy saving standards
0m2 or more and less than 300m219,000 yen
300m2 or more and less than 1,000m227,000 yen
1,000m2 or more and less than 2,000m238,000 yen
2,000m2 or more and less than 5,000m295,000 yen
5,000m2 or more and less than 10,000m2140,000 yen
10,000m2 or more and less than 25,000m2180,000 yen
25,000 m2 or more220,000 yen

※1 Fee calculation should be calculated on a building-by-building basis.
※2 Buildings where all non-residential parts are “not subject to calculation” of primary energy consumption will be added = 0 yen.
※3 The floor area of “factories, etc.” (* 5), “high openness” (* 6), and “existing parts in extension / remodeling” will be reduced from the target area of the fee to be added.
※4 ※If the area covered by the fee becomes 0m2 when the floor area is reduced by 3, 19,000 yen will be added according to the price list.
※5 "Parts such as factories" shall be the part where the use under the Building Standards Law is provided for the following purposes. (It does not depend on whether the primary energy consumption is calculated or not.)

  • Factories (excluding auto repair shops)
  • Automobile repair shop
  • Car garage
  • Bicycle parking lot
  • Provided for storage or disposal of dangerous goods
  • Breeding grounds or farms for marine products
  • A barn
  • Warehouses (including frozen refrigerated warehouses and fixed-temperature warehouses)
  • Wholesale Market
  • Crematorium or slaughterhouse, waste treatment plant, garbage incineration plant and other treatment facilities
  • Public telephone offices
  • Sheds of public toilets, rest areas or bus stops
  • Data centers, etc.
  • Facilities designated by the Minister of Land, Infrastructure, Transport and Tourism based on Article 130-4, Item 5 of the Building Standards Law Enforcement Order (Ministry of Construction Notification No. 1836, December 28, 1970)
  • ※6 “Parts with high openness” shall satisfy the following conditions:
  • The part that is always open to the outside air must be at least 1/20 of the floor area.
  • The minimum part where air conditioning equipment can be installed.

(It must be a floor that does not have partition walls, etc. inside or a part of it.)

Application fee for temporary use certification
Application to Building Guidance DivisionPer case120,000 yen
Application to the designated confirmation inspection organizationPlease contact each institution.

Fees for permission (Article 85 of the Building Standards Act) for temporary exhibition halls
Building permission for temporary exhibition halls, etc. based on the provisions of Article 85, Paragraph 6 of the ActPer case120,000 yen
Building permission for temporary exhibition halls, etc. based on the provisions of Article 85, Paragraph 7 of the ActPer case160,000 yen
Fee of permission (Article 87-3 of the Building Standards Act) when temporarily used as a building for other uses
Permission based on the provisions of Article 87-3, Paragraph 6 of the ActPer case120,000 yen
Permission pursuant to the provisions of Article 87-3, Paragraph 7 of the ActPer case

160,000 yen


Inquiries to this page

Building Guidance Division, Housing and Architecture Bureau Building Guidance Department

Telephone: 045-671-4531

Telephone: 045-671-4531

Fax: 045-681-2437

Email address: kc-shidotanto@city.yokohama.lg.jp

Return to the previous page

Page ID: 912-037-961

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews