Menu

Close

Here's the text.

3 Procedure (completion of consultation-paving work)

Last Updated October 30, 2024

About pavement construction

Completion of consultation-paving work
Completion of consultation-flow of pavement work

After the consultation is completed, the applicant will be responsible for the removal and relocation of obstacles and the construction of retaining walls.

After that, we have you perform pavement construction such as retreat site by applicant or perform pavement construction by city.

There are three methods for paving work.

Please cooperate so that the pavement shape of the retreat site should be road-shaped maintenance (maintenance without steps).


(1) Pavement by the city (managed by the city)

(2) Paving by yourself (managed by the city)

(3) Paving by yourself (managed by yourself)



Procedures and required documents vary depending on the pavement method, so please check the procedure for the desired pavement method.

For inquiries about the procedure, please check the "Consultation Number" and "Applicant Name" and contact the road charge.



Comparison of pavement methods for retreat sites, etc.
  Construction work Management Pavement cost
Grants

Pavement shape
(Refer to the image diagram.)

Others

(1) Pavement by City
  (Management by City)
Yokohama-shi※ Yokohama-shi※ None

Road-like maintenance
(Development without steps)

  • Limited to public roads managed by the city
  • Only when it meets the confirmation items from the city

(2) Paving by yourself
  (Management by City)

Applicant Yokohama-shi※

Yes

Road-like maintenance
(Development without steps)
  • Limited to public roads managed by the city
  • Application for approval of road construction to Public Works Office is required
  • The amount of subsidy for pavement costs isSubsidy listPlease check here.
(3) Paving by yourself
  (Management by yourself)
Applicant Applicant

Yes

    Road-like maintenance
    (Development without steps)
    Or
    Maintenance other than road-like maintenance
    [Note] In the case of maintenance other than road-like maintenance
    • It is necessary to pave the same as the front road.
    • If consultation is narrow after September 1, 2024, there are items that are not eligible for subsidies such as removal and relocation of obstructed properties.
    • The amount of subsidy for pavement costs is Subsidy listPlease check here.

    ※ Land use consent form and written oath from landowners are required.

    Image of road-shaped maintenance

    Image of road-shaped maintenance
    Image figure [A: Road-shaped maintenance (maintenance without steps), B: Maintenance other than road-shaped maintenance]

    Inquiries to this page

    Housing and Architecture Bureau Planning Department Building Disaster Prevention Section, narrow road charge

    Telephone: 045-671-4544

    Telephone: 045-671-4544

    Fax: 045-663-3255

    Email address: kc-kyoai@city.yokohama.lg.jp

    Return to the previous page

    Page ID: 230-826-140

    Menu

    • LINE
    • Twitter
    • Facebook
    • Instagram
    • YouTube
    • SmartNews