Menu

Close

Here's the text.

Key points and required documents

Last update date May 24, 2024

Points of the Guidance Guidelines pertaining to demolition work of buildings (demolition work for buildings with a total floor area of less than 80 m2)

In Yokohama City, "Guidelines pertaining to demolition work of buildings" for the purpose of promoting the separation and dismantling and recycling of specific construction materials generated with the demolition work of buildings, and aiming for proper removal and treatment of asbestos Is stipulated.
Therefore, in Yokohama City, when constructing demolition work with a total floor area of less than 80 m2 in a building that uses specific construction materials for the part pertaining to demolition work, the guidelines mustregistration form be submitted at least 7 days before the start of construction.
In addition, please report the demolition work of buildings with a total floor area of 80 m2 or more based on the Construction Recycling Law.

Documents necessary for notification and matters to be noted

At least 7 days before the start of construction, the ordering party or independent builder of the demolition work subject to the guidelines must notify the Administration Section of the following documents to the Resources and Waste Recycling Bureau Business Waste Management Section. In addition, there is no charge.
In addition, a notified seal will be given at the time of reception, so construction contractors should attach it to the margin of the sign posted on the site.
We can download documents necessary for report from guides such as Construction Recycling Law and related styles.

  1. Demolition work registration form (Form No. 1)
  2. Appendix 1 (Plan for Separation and Demolition, etc.)
  3. Power of Attorney (No attachment is required if submitted by the ordering party or the independent builder)
  4. Map (Estimated scale: 1/1500)

Maps that show the location of construction and the location of the building to be demolished.

  1. Process schedule
  2. Photograph of current state of buildings

Photographs showing the entire building to be demolished (about 1 to 2 photos)

  1. Duplicate work of registration form (a copy of documents from 1 to 6 above) ※I will return the reception stamp after seal.

In the case of public works

If the demolition work subject to the guidelines is public works, please notify the "Dismantling Work registration form [for public works] (Form No. 3)" before the start of construction. (Please submit one copy of each copy.)
We can download style from guides such as Construction Recycling Law and related styles.

For inquiries to this page

Resources and Waste Recycling Bureau Business Waste Management Section Administration Section

Phone: 045-671-3446

Phone: 045-671-3446

Fax: 045-663-0125

Email address: sj-kensetu@city.yokohama.jp

Return to the previous page

Page ID: 540-402-283

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews