Notification procedures under the Construction Recycling Law
Last Updated October 31, 2024
Documents necessary for notification and matters to be noted
The ordering party or independent builder of construction work subject to the Construction Recycling Law to be constructed in Yokohama City must submit the following documents to the Resources and Waste Recycling Bureau Business Waste Management Section Administration Section at least 7 days before the start of the work.
At the time of reception, you will receive a notified sticker, so the construction contractor should attach it to the margin of the sign posted on the site.
There is no charge for submitting registration form.
Documents required for notification
Documents necessary for report can be downloaded from the Guides such as the Construction Recycling Law and related styles.
- registration form (Form No. 1)
- Appended table (plans for separate dismantling, etc.)
Attach the applicable type of construction work from Attachments 1 to 3. If there are more than one, please attach all applicable items.
- Power of Attorney (not attached if submitted by the ordering party or the independent builder)
- Guide map (approximately 1/1500 scale)
Attach maps that show the location of the construction (the location of the target buildings, etc. for demolition work).
- Process schedule
- Blueprints of buildings, etc. or current photographs
- In the case of demolition work: Color photo (about 1 to 2 photos) that shows the entire building to be dismantled or the entire structure other than the building
- In the case of new construction or extension of buildings: Layout plan, floor plan of each floor, elevation (When building multiple buildings as a series of constructions for building sales, etc., it is sufficient to attach only one representative building for each floor plan and elevation. However, please note that the layout drawing is required for each building. )
- In the case of construction such as repair or remodeling of buildings: Drawings that show the details of the construction (renovation, repair, construction equipment construction, etc.)
- In the case of construction of structures other than buildings (excluding demolition work): Design drawings or construction outlines that show the details of the construction
- If you have any other questions, please contact us.
- Copy of registration form (copy of documents from 1 to 6 above) ※I'll return the reception stamp on seal.
Concept of the number of days on the notification date and start date
Oh If you want to start on the 8th of the month, the 1st of the month will be 7 days before the start of construction. This 7th includes Saturdays, Sundays, holidays, and New Year's holidays (December 29 to January 3).
If 7 days before the start is on Saturdays, Sundays, holidays, etc., please submit by the immediately preceding opening date.
Please note that the start of construction includes temporary construction for the construction.
When the target construction work is public works
If public works ordered by a national institution or local government are subject to construction work, please submit a notice (one copy for each copy) before starting construction. In addition, a notice sticker will be issued at the time of reception, so please attach it to the sign posted at the construction site.
We can download style from guide such as Construction Recycling Law and related style.
Inquiries to this page
Resources and Waste Recycling Bureau Business Waste Management Section Administration Section
Telephone: 045-671-3446
Telephone: 045-671-3446
Fax: 045-663-0125
Email address: sj-kensetu@city.yokohama.lg.jp
Page ID: 942-543-482