Menu

Close

Here's the text.

C-095: Higashi-Kanagawa 1-chome district

※The plan reads out statutory books in the form of a table, and it may be difficult to understand the contents. Please refer to Minato Mirai, Toshin Nagawa seaside promotion section for confirmation of contents. (Phone number: 045-671-3857)

Last update date April 1, 2024

Restrictions on the division of districts and wall position
Plan drawing (division of district, restriction of position of wall surface)

District facilities
Plan drawings (district facilities)

・Plan

Name

Higashi-Kanagawa 1-chome District Planning

Position

1-chome, Higashi-Kanagawa, Kanagawa-ku

Area

Approx. 0.2ha

Targets of District Planning

The area around Higashi-Kannagawa Station, which is the transportation junction between JR Keihin Tohoku Line and Yokohama Line, is positioned as a regional base in the Kanagawa Ward Plan of the City Planning Master Plan.
This area faces Higashi-Kanagawa Station East Exit Station Square and forms a part of the area around Higashi-Kanagawa Station. However, aging buildings are lined up, there are disaster prevention issues, and land suitable for the station square.
This district plan forms a good complex urban area suitable for a regional base by accumulating urban functions consistent with the higher-level plan, improving basic facilities, and improving local disaster prevention through the urban redevelopment project. The goal is to maintain that environment.
Ward
Areas
No
1.
Bill

Opening
Departure
Oh
Bi
Hoping
All
Ni
Seki
S
L
Sir
Needle

Land Use Policy

In order to form a good complex urban area suitable for local bases and improve the convenience of users around stations and stations, the districts are divided into two districts, and each land use policy is determined as follows.
District A
1 Develop commercial facilities, urban housing, etc.
2 Create a pedestrian space that connects commerce and surrounding areas.
District B
Develop the necessary bicycle parking lot in front of the station.

Policy for the development of district facilities

1 In order to ensure the safety of pedestrians around the station, maintain sidewalk-like open spaces.
2 In addition to connecting to the existing pedestrian deck at East Exit Station Square, it also has stairs and other lifting facilities that connect to the ground, usually form a lively station in front of the station, and a plaza that temporarily accepts residents.
We maintain 3 open spaces and bicycle parking lots and pedestrian passages that connect the surrounding area.

Policy for maintenance of buildings, etc.

District A
Considering the cityscape of the surrounding urban area, we will develop commercial facilities and urban-type houses suitable for the station square through urban redevelopment projects. For this reason, restrictions on the use of buildings, restrictions on the position of walls, restrictions on the installation of structures in the retreat area of wall surfaces, the maximum height of buildings, and restrictions on form designs such as buildings are determined.
District B
A bicycle parking lot will be maintained to improve the convenience of users around stations and stations. For this reason, restrictions on the use of buildings and the maximum height of buildings are determined.

Greening Policy

We establish minimum of greening rate of building to plan formation of green station square space by promoting greening in site.
・Plan (Continued)
District maintenance plan
Placement and scale of district facilities Sidewalk-like open space

Width 2.0m extension about 30m (partially non-blue sky)
Width 4.0m extension about 110m (partially non-blue sky)

Aisles for pedestrians

Width 2.0m extension about 30m (partially non-blue sky)

Open space

Area approximately 100m2 (non-blue sky)

Construction
Construction
Goods
Etc.
Ni
Seki
S
L
A matter
Section
Classification of district

Name

District A

District B

Area

Approx. 0.2ha

Approx. 0.03ha

Restrictions on the use of buildings

The following buildings must not be constructed.
The 11th floor or 2nd floor is used for housing (excluding corridors, halls, stairs, elevators, and the like that are used for housing on the 1st floor or 2nd floor only)
2 Factories (excluding those attached to stores, restaurants, and other buildings used for similar purposes)
3 Majangya, Pachinkoya, shooting range, Katsuma voting ticket sales office, off-site ticket sales office, and the like
4 Those to be used for storage or disposal of dangerous goods (excluding storage facilities for own use and other similar ones)
5 Cabarets, restaurants, nightclubs, dance halls and the like
6 Public baths pertaining to the bathing business with private rooms and other similar buildings stipulated in Article 130-9-3 of the Building Standards Law Enforcement Ordinance (Government Ordinance No. 388 of 1950)

Buildings other than the following buildings must not be built.

1 Bicycle parking lot
2 Requirements for the public interest prescribed in Article 130-4 of the Building Standards Law Enforcement Order, public telephone offices, and similar items
3 Those attached to the buildings of the preceding item 2

Restrictions on the position of the wall The outer wall of the building or the surface of the pillar in place of this shall not be built beyond the limit of the position of the wall shown in the plan drawing. Provided, however, that this shall not apply to public walkways.
Restrictions on the installation of structures in the wall retreat area Line 4m from the boundary of the city road Rokukakubashi No. 339, line 4m from the boundary of the city road Rokukakubashi No. 430, line 4m from the boundary of the area of the city planning road 3.3.33 Higashikanagawa Line The 2m off the line and the boundary of the divided street No. 1 fence by the Higashikanagawa 1-chome Urban Redevelopment project, the Higashikanagawa 1-chome Urban Redevelopment project, each, etc.
Maximum height of buildings The height of the building must not exceed 70m. The height of the building must not exceed 10m.
Restrictions on forms or designs of buildings, etc.

1 In order to reduce the feeling of oppression, the color of the part where the height of the building exceeds 31m is based on the Munsell color system with a brightness of 4 or more and a saturation of 4 or less in order to reduce the feeling of oppression.
2 The building equipment installed on the roof should not have a messy appearance, such as surrounding it with shields in harmony with the building.
3 Outdoor advertising materials shall conform to the following matters.
(1)Outdoor advertising materials (excluding those that combine independent characters, marks, etc. in their own name, contents of their own business or business, or those that display necessary items for management) have a height of more than 31m Do not install in the part.
(2)Outdoor advertising materials must not be installed on the rooftop (excluding those whose height of the building is 31m or less).

Minimum of greening rate of buildings 7.5/100 10/100

Inquiries to this page

Urban Development Bureau Central Revitalization Promotion Department Minatomirai and Toshin Nagawa Coastal Promotion Division

Telephone: 045-671-3857

Telephone: 045-671-3857

Fax: 045-651-3164

Email address: tb-mmhigashikanarin@city.yokohama.jp

Return to the previous page

Page ID: 440-173-083

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews