Here's the text.
Main road Sakuragi Higashitotsuka Line
Last Updated February 18, 2019
- It is an arterial road that connects the western part of the city from the city center and connects to National Route 1 and Loop Route 2.
- We are currently conducting business in the Hirato area (Totsuka Ward).
- Development is being carried out in the Izumi area (Izumi Ward) of the Gontazaka Izumi Line and the Naze and Okazu areas (Totsuka Ward and Izumi Ward).
- The Naze district was a 330m section of Naze-cho, Totsuka-ku, and opened on March 25, 2016.
Starting point | End point | Representative width (m) | Extension (m) |
---|---|---|---|
Uchidacho, Naka-ku | Nasecho, Totsuka-ku | 18 | 10,540 |
Inquiries to this page
Planning Division, Planning and Coordination Department, Road and Highway Bureau
Telephone: 045-671-2777
Telephone: 045-671-2777
Fax: 045-651-6527
Email address: do-dourogairo@city.yokohama.jp
Page ID: 567-153-220