Planning permission based on Town Planning and Zoning Act Article 53

Last update date June 12, 2020

Purpose

When we build building in area of city planning facility had city planning decision of or the enforcement area of urban development business to secure the smooth enforcement of future business, it is necessary to receive permission of The Mayor of Yokohama.

Act that is targeted for permission

Construction of building in in area of city planning facility or the enforcement area of urban development business.

Construction of workpiece is permission-free.

Permission standard

Correspond to all the requirements that the building concerned publishes next. (we move easily or can make removing.)

  1. Being performed in the area of city planning facility where notification (Town Planning and Zoning Act Article 62 Paragraph 1) such as the business authorization is not made (※ 1).
  2. Numbers of floors are 3 or less, and do not have 12m in height or less and basement.
  3. Being structure that main structure part (main structure part to fix for Building Standard Act Article 2 No. 5) is wooden and is similar to steel-frame building, these concrete block construction or other.

In addition, gainaridoro dig, and there is relaxation about construction of garages including, and there is limit in planning permission in housing facility of group place separately. For more details, please refer for in the following, plan and operational standard after reference.

※1: When notification (Town Planning and Zoning Act Article 62 Paragraph 1) of the business authorization or approval is done, permission regulations of Article 53 are not applied. Please confirm contents of Article 65 permission.

Documents submission method

For prevention of new coronavirus infection spread, I would like cooperation of submission of documents by "mail" for the time being.

At first, I would like consultation with telephone beforehand.

Permission procedure period

※For approach of prevention of new coronavirus infection spread, we need time more than normal procedure periods.

After documents arrived; is almost around seven business days.

When areas such as city planning roads during business are inner, it takes approximately 2-3 weeks for adjustment with company.

Inquiry and permission application

Permission (except business area of urban development business) in area of city planning facility (road, park, river, house facility of group place)
ChargePhone numberAddressZip code
Person in charge of Housing and Architecture Bureau City Planning Division instruction045-671-35106-50-10, Honcho, Naka-ku, Yokohama-shi city hall 25F231-0005

Permission in area of land readjustment project
Type of land readjustment project

Charge (Urban Development Bureau)

Phone numberAddressZip code
District in southern Shin-YokohamaThe downtown area reproduction section045-671-38586-50-10, Honcho, Naka-ku, Yokohama-shi
(the city hall)
231-0005
District in northern Futatsu BridgeCity area maintenance promotion section045-671-3738

Permission in area of first-class Urban District Redevelopment Project
Type of Urban District Redevelopment ProjectCharge (Urban Development Bureau)Phone numberAddressZip code
Yokohama-sta.-nishiguchiThe downtown area reproduction section045-671-35436-50-10, Honcho, Naka-ku, Yokohama-shi
(the city hall)
231-0005
Kanazawa-Bunko Station East Exit districtCity area maintenance promotion section045-671-3779
Nakayama Station south exit district045-671-3513

Required documents

Permission application and various attached books need all Part 2 or Part 3 (※ 2) except letter pack plus.

  1. Permission application
  2. Proxy (when entrusted)
  3. Guide map (1/2500 reduced scale that listed direction, site position, public facilities around the site or more things)
  4. Plan (1/500 reduced scale that listed position, direction of building in site, site boundary line, site and relations with road or more things)
  5. Ground plan (1/200 reduced scale or more things)
  6. Elevation (1/200 reduced scale or more things. We need more than two elevations.)
  7. Cross section (1/200 reduced scale or more things. We need more than two cross sections.)
  8. kakukaishoryofusezu (in the case of wooden construction, we do not need) ※3
  9. Figure of Class axis (in the case of wooden construction, we do not need) ※3
  10. kisofusezu (in the case of wooden construction, we do not need) ※3
  11. Model materials the manufacturer certification book (in the case of wooden construction, do not need) ※3
  12. Letter pack plus (※ 4) for reply

※2: In the case of permission in area of city planning road and urban development business of undevelopment, the necessary number of copies is two copies. Three copies of cases such as city planning roads during business are necessary.

※3: "Model materials when the manufacturer certification book" is attached, "kakukaishoryofusezu", "kisofusezu" is unnecessary "figure of Class axis".

※4: Letter pack plus for reply is red. As you are different from blue letter pack, please be careful. Please submit after filling out "zip code" and the "destination" column.

Application style, attachment

Application style, attachment
Application classificationStyle 1Style 2
Article 53 permission applicationArticle 53 permission application (word: 27KB)Article 53 permission application (PDF: 212KB)

torishitatodoke
(when we withdraw application before notice of allowance during application by Article 53 permission)

torishitatodoke (PDF: 104KB)torishitatodoke (word: 19KB)

Report of cancellation
(when we cancel thing which already acquired Article 53 permission)

Report of cancellation (PDF: 106KB)Report of cancellation (word: 19KB)

Change registration form
(when we make slight change about thing which already acquired Article 53 permission)
※Please submit after performing prior consultation with the person in charge.
Guidance flyer (PDF: 224KB)

Change registration form (PDF: 117KB)Change registration form (word: 24KB)

Succession registration form of position
(when we succeed position about thing which already acquired Article 53 permission)

Succession registration form (PDF: 105KB) of positionSuccession registration form (word: 19KB) of position

Summary and operational standard

The handling summary (※ 5.6) about planning permissions in area of city planning facility (PDF: 343KB)
Operational standard (※ 7) about permission of Town Planning and Zoning Act Article 53 Paragraph 1 in gainaridoro (PDF: 298KB)
Operational standard (PDF: 139KB) about Town Planning and Zoning Act Article 53 Paragraph 1 in garage which digs, and includes
Operational standard (PDF: 114KB) about planning permission of Town Planning and Zoning Act Article 53 Paragraph 1 in the upper part of city planning facility of tunnel structure
※5: As you set about permission in area of urban development business (land readjustment project) separately, please ask district person in charge of Urban Development Bureau.

※6: When person who received permission to prescribe in Town Planning and Zoning Act Article 53 Paragraph 1 changed a part of the plan, we abolished system of conventional change approval and founded system of change report newly (the November 1, 2019 enforcement). When you change a part of the plan, you mail change registration form complete set, and please submit after prior consultation on the telephone. Guidance flyer (PDF: 224KB)

※7: Detailed guide is this>>About operation of planning permission in section targeted for the Town Planning and Zoning Act Article 53 exception permission

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Housing and Architecture Bureau Planning City Planning Division

Telephone: 045-671-3510

Telephone: 045-671-3510

Fax: 045-550-4913

E-Mail address [email protected]