Menu

Close

Here's the text.

Yokohama City Cliffs [Disaster Prevention] Measures Construction Subsidy Program

Last update date May 1, 2024

Disaster Prevention Subsidy Brochure cover

About grant application of 2024

Grant application acceptance period

About grant application of 2024, we start acceptance from April 8, 2024.
The grant application deadline is scheduled until December 27, 2024.
※We also accept submission of documents by mail.
 For more information, please refer to the following link.

Outline of the Disaster Prevention Measures Construction Subsidy Program

Brochure

Download is possible from cliff disaster prevention measures construction subsidy system brochure (PDF: 741KB).

Covered cliffs

Cliffs that fall under all of the following items are eligible.

  • Artificial cliffs such as natural cliffs and retaining walls
  • On cliffs where the height from the ground surface exceeds 2 meters or cliffs that may damage roads, etc., cliffs that are more than 1 meter above or 2 meters below the road surface
  • Cliffs with an inclination angle of 30° or more
  • Cliffs that may damage buildings or roads to be used for living due to landslides

Eligible works

Works that fall under all of the following items are eligible.

  • Retaining wall construction or cut / embankment work that requires procedures under the Building Standards Law or the Regulation Law for Residential Land Development, or legal framework construction that can release all or part of the area designated by the Sediment Disaster Prevention Law
  • Construction work where the height and position of the cliff do not change

※For technical consultation on cliff improvement and thing about regulation law such as residential land development, please see page of City of Yokohama, Housing and Architecture Bureau residential land examination section.

Amount of grant

The amount of the subsidy is 1/3 of the target construction cost or the unit price determined by the city ※Amount or limit (4 million yen) calculated based on the above
Whichever is smaller.

※Unit price per square meter of vertical projection area for fiscal 2024 is as follows:
 ・Retaining wall construction work and waiting retaining wall construction 99,000 yen/㎡
 ・Cutting or embankment work 26,000 yen/㎡
 ・Legal framework construction 78,000 yen/㎡
For the vertical projected area, please refer to the subsidy calculation method (PDF: 568KB).

Precautions for Use of the System

  • When we apply for grant of grant, adjustment with Building Disaster Prevention Section and Disaster Prevention Section is necessary. Please contact us in advance.
  • If a construction contract or construction has been started before the grant is decided, the subsidy system cannot be used.
  • When we receive grant of grant, it is necessary to have you conclude construction contract with company headquartered in the city.
  • Please submit a completion report by the end of February of the year in which the grant decision was received.

Outline

The grant system is operated based on the following guidelines. (Effected in April 2024)
Please refer to the outline for details on the target cliffs and construction.
Yokohama City Cliff Disaster Prevention Measures Construction Subsidy Grant Guidelines (PDF: 135KB)
Collection of Grant Summary Styles (word: 33KB)

Procedure Flow and Form

For other necessary documents, please refer to the outline and brochure.
Grant application

・Cliff Disaster Prevention Measures Construction Subsidy Grant Application Form (No. 1 style)
  Word (word: 21KB) / PDF (PDF: 48KB) / Entry example (PDF: 152KB)
・Pledge (Form No. 3)
  Word (word: 20KB) / PDF (PDF: 143KB) / Entry example (PDF: 98KB)

<if necessary>
・Land use consent form (No. 2 style)
  Word (word: 21KB) / PDF (PDF: 90KB) / Entry example (PDF: 94KB)
・Power of Attorney (Form No. 16)
  Word (word: 20KB) / PDF (PDF: 96KB) / Entry example (PDF: 99KB)

↓

<When withdrawing the application before receiving the grant decision>
・Notification of withdrawal of subsidies for construction of cliffs (No. 8-2 style)
  Word (word: 21KB) / PDF (PDF: 89KB) / Entry example (PDF: 95KB)

After acceptance of the grant decision

Construction contract

<After the construction contract>
・Notification of start (No. 6 style)
  Word (word: 20KB) / PDF (PDF: 134KB) / Entry example (PDF: 95KB)

↓

<When it is found that the contents of the grant application will be changed>
・Cliff disaster prevention measures construction subsidy business contents change report (No. 7 style)
  Word (word: 21KB) / PDF (PDF: 47KB) / Entry example (PDF: 72KB)
<When canceling the application for which the grant decision has been received>
・Cliff Disaster Prevention Measures Construction Subsidy Notification (No. 8 No. 1 style)
  Word (word: 21KB) / PDF (PDF: 94KB) / Entry example (PDF: 101KB)

Construction Completion Report

・Completion Report (Form No. 10)
  Word (word: 21KB) / PDF (PDF: 99KB) / Entry example (PDF: 104KB)
<When a business change report (No. 7 style) is made after the grant decision>
・Cliff Disaster Prevention Measures Construction Subsidy Grant Application (Change) (No. 9 style)
  Word (word: 21KB) / PDF (PDF: 96KB) / Entry example (PDF: 148KB)

↓
Grant request

・Cliff Disaster Prevention Measures Construction Subsidy Grant Invoice (No. 13 style)
  Word (word: 21KB) / PDF (PDF: 91KB) / Entry example (PDF: 100KB)

<If you apply under a joint name>
・Power of Attorney (for receiving grant) (Form No. 14)
  Word (word: 21KB) / PDF (PDF: 94KB) / Entry example (PDF: 101KB)


In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Building Disaster Prevention Section, Housing and Architecture Bureau Planning Department

Phone: 045-671-2948

Phone: 045-671-2948

Fax: 045-663-3255

Email address: kc-gakebousai@city.yokohama.jp

Return to the previous page

Page ID: 703-452-971

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews