Kawai Purification Plant was founded in 1901 and built a major facility in operation in 1963. However, due to problems with aging and earthquake resistance, we decided to renew it.
When renewing, it is necessary to operate while operating an existing facility, so it can save space compared to the rapid sand filtration method, and effectively use the position energy due to the height difference from the water source Doshi River. We decided to adopt a membrane filtration method that can do it.
In addition, since the membrane filtration method is a new technology, PFI, which utilizes private technology and know-how. ※By adopting one method and making a business that integrates design, construction, and maintenance, the total cost can be reduced, so we decided to promote redevelopment using PFI.
※1 PFI: This is a business method that utilizes private funds and management and technical skills (know-how) to construct, maintain, and operate public facilities.
Items | Contents |
---|---|
Business name | Kawai Purification Plant Redevelopment Project |
The other party of the contract | Water Next Yokohama Co., Ltd. |
Contract amount | 27,679,173,328 yen (including tax) |
Business Period (total) | From April 1, 2009 to March 31, 2016 |
Facility maintenance period [Phase 1] | From April 1, 2009 to March 31, 2004 |
Facility maintenance period [Part 2] | From April 1, 2014 to March 31, 2015 |
Operation and maintenance period [20 years] | From April 1, 2014 to March 31, 2014 |
Water treatment capacity | Water production volume: 171,070m3/day or more |
Water treatment method | Film filtration method (ceramic membrane) |
Reservoir | Valid capacity: 30,000m3 |
Wastewater treatment facilities | Wastewater and dehydration treatment facilities |
Period | Items |
---|---|
December 14, 2007 | Announcement of Implementation Policy |
March 3, 2008 | Selection of specific business and publication of business requirements standard (draft) |
June 3, 2008 | Announcement of tender manuals, etc. |
September 24, 2008 | Acceptance of bids and proposals |
December 4, 2008 | Determination of the winning bidder |
December 26, 2008 | Conclusion of Basic Agreement |
February 27, 2009 | Conclusion of business contracts |
April 1, 2009 | Start of business |
Location: | 2-8-4, Kitasaiwai, Nishi-ku |
---|---|
Representative Director | Toru Kawakami |
Date of establishment | January 22, 2009 |
Shareholders' equity | 100 million yen |
Shareholders | Metawater Co., Ltd. (person responsible for the manufacture of membrane filtration equipment, part of machinery and electrical work, part of maintenance and management) |
Major partner companies: Kashima Construction Co., Ltd. (civil engineering and construction work), Tokyo Design Office Co., Ltd. (design and construction supervision)
Water Works Bureau Customer Service Center
Telephone: 045-847-6262 Fax: 045-848-4281
※Please be careful not to make a mistake.
Water Works Bureau Water Purification Department Kawai Purification Plant
Telephone: 045-921-1174
Telephone: 045-921-1174
Fax: 045-922-4989
Email address: su-kawaijosui@city.yokohama.lg.jp
Page ID: 843-053-337