Measures for sprayed materials containing asbestos (asbestos) in Yokohama City Public Buildings
Last Updated January 11, 2024
Regarding measures for asbestos-containing spraying materials in public buildings, a fact-finding survey was conducted in FY2005, and facilities where asbestos-containing spraying materials was found to be basically removed, containment, and enclosure by 2009 Necessary measures such as enclosure have been completed. (Including facilities for which use other than the three main types were found in the 2007 Additional Survey (Note 1))
For facilities that were identified as “facility in enclosed state” (Note 2) and “facilities that do not require immediate measures” (Note 3) in the fact-finding survey, the amount of floating amount is measured every year in principle. We will carry out appropriate maintenance and take measures at the time of facility renovation.
In addition, after the fact-finding survey in 2005, similar measures have been implemented for facilities where asbestos has been found due to renovation work.
The latest floating measurement results at these facilities can be found at the Name of the facility link.
Facility jurisdictions and bureaus | Locations | Name of the facility (Click Name of the facility for floating measurement results.) | Room name, etc. | Spraying situation |
---|---|---|---|---|
Tsuzuki Ward General Affairs Division | Tsuzuki | Tsuzuki Ward General Government Building | Training room, aisle, etc. | Behind the ceiling |
Aoba Ward General Affairs Division | Green leaves | Aoba Ward General Government Building | Office (1st floor to 4th floor) | Behind the ceiling |
Health and Social Welfare Bureau Regional Support Division | Medium | Health and Welfare Center | Parking lane | Behind the ceiling |
Port and Harbor Bureau Logistics Operation Division | Medium | Honmaki Wharf LFS shed | Offices on the 1st and 2nd floors | Behind the ceiling |
Road and Highway Bureau Yokohama Ring Road Coordination Section | Tsurumi | Skywalk | Lounge, etc. | Behind the ceiling and behind the wall |
Economic Affairs Bureau Operation Coordination Division | Kanazawa | Yokohama Southern Market | Office of Flowering Building | Behind the ceiling |
Economic Affairs Bureau Manufacturing Support Section | Medium | Sangyo Boeki Cebter Bldg.ville | Cargo handling area | Behind the ceiling |
Facility jurisdictions and bureaus | Locations | Name of the facility (Click Name of the facility for floating measurement results.) | Room name, etc. | Spraying situation |
---|---|---|---|---|
International Cooperation Division, International Affairs Bureau | West | Yokohama International Cooperation Center | Machine room, etc. | Exposure (solidified) |
Fire Bureau Facility Division | Tozuka | Totsuka fire department | Library on the second floor | Exposure (solidified) |
Environmental Planning Bureau Sewerage Facilities Management Section | Isogo | Nambu Wastewater Treatment Plant | Blowing wing | Exposure (solidified) |
- Note 1: In some of the facilities that analyzed in the fiscal 2005 survey, it was found that only three of the six types of asbestos were analyzed using a method that only three of the six types of asbestos, so re-analysis was conducted in 2007.
Three main types…Closidolite, amocyte, chrysothyl
3 added types…Tremolite, Aquachino Light, Ann Sophie Light - Note 2: A "facility in an enclosed state" means that the place of use is sealed behind the ceiling and the spraying material is relatively less harmful (approximately 5% or less, 2% amosite). This facility will carry out appropriate maintenance, such as measuring the amount of floating amount every year in principle in the future, and measures will be taken at the time of facility renovation.
- Note 3: "Facilities that do not require immediate measures" are mechanical rooms that do not allow citizens to enter, where the asbestos content contained in the spraying material is as low as 1% or less, and chrysotiles with relatively low toxicity. Due to the fact that the spraying material is solidified instead of cotton, it is a facility that performs appropriate maintenance and management, such as measuring the amount of suspended amount in principle every year, and measures are implemented at the facility repairs in principle, and measures are implemented in principle, and measures are implemented, and measures are implemented, and measures are implemented in principle, and measures are implemented at the facility renovation.
For inquiries, please contact each facility's jurisdiction or bureau.
We publish suspended quantity measurement result after 2016 on homepage of each jurisdiction station.
For past published materials, please refer to pages such as press release materials related to asbestos (asbestos).
For inquiries to this page
Environmental Management Division, Environmental Planning Bureau Environmental Conservation Department
Phone: 045-671-2487
Phone: 045-671-2487
Fax: 045-681-2790
Email address: ks-kagaku@city.yokohama.jp
Page ID: 644-503-223