Menu

Close

Here's the text.

City Road Kamishirane No. 99 (Kamishirane District)

Last Updated March 5, 2019

City Road Kamishirane Route 99 is a road with a length of about 2,450m starting from Tsurugamine Honmachi, Asahi-ku and ending at Kamishirane-cho, Asahi-ku. Of these, the Kamishirane district is a section of about 700m in length from the vicinity of Kamishirane Ichibashi intersection to the Hikarigaoka "Koban" (police box)-mae intersection of the main local road Maruko Nakayama Chigasaki.

Business Overview
Business DistrictsCity Road Kamishirane No. 99 (Kamishirane District)
SectionKamishirane-cho, Asahi-ku, Kamishirane 2-chome
Fiscal yearYears ended March 31, 2017 to 29
Scale

Approx. 700m
Standard width 16m

Improvement effect
  • Improvement of transportation convenience and enhancement of transportation functions
 The existing road has a narrow width and the sidewalk is not well maintained, but widening the existing road will ensure pedestrian safety and smooth traffic.
In addition, the function as a main road connecting the main local road Maruko Nakayama Chigasaki from National Route 16 will be strengthened.
  • Optimization of traffic flow
 By widening the existing road, the passing of route buses will be smooth, and by installing a right-turn lane at intersections, traffic flow can be optimized.
Business Progress Rate※100%
Land acquisition rate※100%
Related information
Summary of the proceedings (PDF: 198KB)
Handouts
Ceremony (PDF: 46KB)
Document 1 Business Overview (PDF: 772KB)
Document 2 Explanatory materials (PDF: 1,565KB)

※The land acquisition rate indicates the ratio of the acquired area among the areas where the business has been approved.
※Business progress rate is shown as the execution rate of total project cost.

Location map

Location map

Photographs of current status (as of March 2018)
Before starting construction (photographed in March 2014)

Before starting construction 2 (photographed in March 2014)

Photo 1 (Photographed in March 2014)


Photo 2 before starting construction (photographed in March 2014)


After completion of construction 1After construction is completed 2

Photo 1 after completion of construction (photographed in March 2017)


Photo 2 after completion of construction (photographed in March 2017)


In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Road and Highway Bureau Construction Department, Construction Department

Phone: 045-671-3521

Phone: 045-671-3521

Fax: 045-663-8993

Email address: do-kensetsu@city.yokohama.jp

Return to the previous page

Page ID: 419-990-543

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews