Inspection of underground garages, etc.

Last Updated March 11, 2019

Please note that the specific process of the intermediate inspection of houses with underground garages is different from usual, and the time and number of inspections may change.

About specific process of RC garage + wooden house

  • When the underground garage and the house itself are separate buildings

We consider underground garages as independent buildings and treat them as follows.

Table of examples of specific processes
Image diagramDetails of Specific ProcessUnderground part
Specific Process
(Inspection subject area)
Of the house itself
Specific Process
(Inspection subject area)

Image of garages and houses

<Case 1.>

  • Underground garages, etc. of less than 50 m2

Inspection of underground garages is not required

X (not applicable)○(Applicable)
(1st floor + 2nd floor area)

Image of garages and houses

<Case 2.>

  • Underground garages with an area of 50 m2 or more

Inspection of parts such as underground garages is required.

○(Applicable)
When foundational reinforcement is completed
(ground floor area)
If it exceeds 200 m2, further as a second test.
○(Applicable)
When the upper floor slabs are completed.
(ground floor area)
○(Applicable)
(1st floor + 2nd floor area)
  • When the underground garage and the house itself are integral
Table of examples of specific processes
Image diagramDetails of Specific ProcessUnderground part
Specific Process
(Inspection subject area)
Of the house itself
Specific Process
(Inspection subject area)

Image of garages and houses

<Case 1.>

  • In the case of underground garage + wooden 2 stories

About parts such as underground garage

  1. The only underground part is used in the garage
  2. Underground area of less than 50 m2
  3. The area in contact with the surrounding ground is more than three-quarters of Mitsuke area.

Those that meet all of the above conditions
→There is no inspection of the underground garage.
Only the designated process for the house itself

X (not applicable)○(Applicable)
(1st floor + 2nd floor area)

Image of garages and houses

<Case 2.>

  • In the case of underground garage + wooden 2 stories

<Case 1.> Other than that

→Underground garages, etc. are completed when the foundation reinforcement is completed

+ There is a designated specific process for the house itself

○(Applicable)
(ground floor area)
○(Applicable)
(1st floor + 2nd floor area)

Image of garages and houses

<Case 3.>

  • If there are two floors with RC structures regardless of the ground or underground.
  • Most of the total floor area is RC structure
  • It is treated as a non-wooden two-story building or more.

→When foundational reinforcement is completed
+ When the second floor slabs are completed from the bottom floor
※The inspection is performed by the person in charge of the structure.

○(Applicable)
(ground floor area)
○(Applicable)
When the second floor slabs are completed from the bottom floor
(1st floor area)
※There is no inspection of wooden parts

※Please receive the designated specific process for the house itself according to the structural type of the wooden construction method and the wooden frame construction method.
For more information, look here. → Intermediate inspection (specific process)
※If you have an existing underground garage, please contact us separately.

About the specific process of RC garage + type-conforming certified house

Basically, it is the same as wooden construction, but please note that the inspection time and the area to be inspected are different for the specific process of the house itself.
For more information, look here. → Intermediate inspection (specific process)

Image of how to calculate the found area
*(Reference) Method of Calculation of the found area


[Selected area calculation formula]
(A+B+C+D)×3/4≦A+B+C
If the area in contact with the surrounding ground (A + B + C) is more than three-quarters of the found area around the basement (A + B + C + D) on the outer perimeter of the basement, it will not be inspected. (However, applications are limited to garages.)

For more information, please contact the instructor.

For inquiries to this page

Building Guidance Division, Housing and Architecture Bureau Building Guidance Division

Phone: 045-671-4531

Phone: 045-671-4531

Fax: 045-681-2437

Email address: kc-shidotanto@city.yokohama.jp

Return to the previous page

Page ID: 741-844-328

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews