How to use hardware ○ and ×
Last Updated January 25, 2019
At the time of the mid-term inspection, you can see sites where hardware is incorrectly delivered, and sites where you are having a lot of difficulty in paying. Therefore, we decided to introduce good and bad examples of how to put hardware on this page. Please refer to the reference when constructing the site.
Mounting Hall-down hardware and bracelet plate
○Good example ○ Using an internal brace plate to avoid interference with HD.
× Bad example × Bad Example × Bad Example × The bracing plate attached to the column is not attached because it interferes with HD.
Bracing plate attached to the back split
○Good example ○ Using a brace plate used to avoid interference with the back split.
× Bad example × Bad example × The strength is not secured because the screws on the bracket plate are in the back split.
Mounting of foundation packing
○Good example ○ The foundation packing is provided under the column.
× Bad example × If there is no foundation seal under the pillar, a lot of power is applied to the base.
For inquiries to this page
Building Guidance Division, Housing and Architecture Bureau Building Guidance Division
Phone: 045-671-4531
Phone: 045-671-4531
Fax: 045-681-2437
Email address: kc-shidotanto@city.yokohama.jp
Page ID: 519-338-349