Log assembly method
Last Updated March 11, 2019
The specific process of the intermediate inspection and the designation of the designated process in the log assembly method will be operated as follows.
Operational Approach
- Buildings of the Log Setting Law are as follows: Attached Table 4 (1) of the City Enforcement Regulations Article 17 "Designation of Specific Process" of the City Enforcement Regulations Article 17 "Designation of Specific Process" "Buildings".
- Specific Process
When the entire axis fram framing is completed (when the log braiding is completed).
- Designation of the specified process
At the construction stage of a specific process, since the inspection of the pits etc. cannot be seen, a designated process is added to the first stage of the specific process. (according to Article 17-4, (6) of the City Enforcement Regulations)
The designated process shall be when the load-bearing wall is assembled by about 1/2 after the foundation work is completed.
- Implementation method
At the time of implementation, when designating a specific process and issuing a certificate of confirmation at the examination stage, the building owner will be notified of the designation of the designated process.
- Operation start date
It will be implemented from September 1, 2004.
For technical standards, please refer to Notification 411 of the Ministry of Land, Infrastructure, Transport and Tourism of 2002.
For inquiries to this page
Building Guidance Division, Housing and Architecture Bureau Building Guidance Division
Phone: 045-671-4531
Phone: 045-671-4531
Fax: 045-681-2437
Email address: kc-shidotanto@city.yokohama.jp
Page ID: 846-626-513