Menu

Close

Here's the text.

Seya Mukoyodai Residential Building Agreement

Last update date April 6, 2023

Image of prior consultation request district
Pre-consultation request district map (including building agreement area)

Prior consultation request district

Sites excluded from prior consultation request area

  • If you have a building plan on the site in the prior consultation request area, please contact the Steering Committee in advance.
  • Please refer to Urban Development Bureau area town development section (045-671-2667) for contact information of steering committee.
  • Please note that you may subscribe to a building agreement in the future.
  • What is the "prior consultation request district"?
  • Authorized Building Agreement Area Map (PDF: 53KB)
    Detailed map of the building agreement area and adjacent land (land of those who do not agree to the agreement)
  • Building Agreement (PDF: 579KB)
    ※Due to the revision of the Building Standards Law, there is a gap in the provisions described in the agreement. For more information.Articles of the Building Standards Law Concerning Restrictions on Building AgreementsPlease take a look at it.
    ※Please be sure to check with each Steering Committee for handling the criteria of the agreement.
  • Outline of limitations (excerpts of agreement)
    (Restrictions on buildings)
    Article 7 The site, position, use and form of the building in the agreement area specified in the preceding Article must be based on the standards specified in the following items.
    (1) Use of the building shall be a single-family house and a clinic combined house.
    (2) The number of floors shall be two or less except for the basement floor.
    (3) The maximum height from the ground surface is 10m, the height of the eaves must not exceed 6.5m.
    (4) The distance from the outer wall of the building or the surface of the pillar in place of this to the boundary line of the site shall be 0.5m or more, and the distance to the road boundary shall be 1.0m or more. Provided, however, that Article 135-5 of the Building Standards Law Enforcement Order ※This does not apply to those that comply with the provisions of the above.
    (5) The site shall not be split.
    ※Due to the revision of the Building Standards Law, there is a gap in the provisions described in the agreement. For more information.Articles of the Building Standards Law Concerning Restrictions on Building AgreementsPlease take a look at it.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Urban Development Bureau Community Development Department Community Development Division

Phone: 045-671-2667

Phone: 045-671-2667

Fax: 045-663-8641

Email address: tb-chiikimachika@city.yokohama.jp

Return to the previous page

Page ID: 699-232-805

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews