Here's the text.
Kami-Ooka Station Area
Last update date April 1, 2024
(Image: 293KB)
Click here to view a block diagram of the Kamiooka area (image: 293KB)
The area around Kami-Ooka Station is formed as a concentrating transportation terminal such as Keihinkyuko Line, municipal subway lines and bus routes, but the buildings are densely populated and have problems with traffic congestion and disaster prevention.
We are improving roads and railway facilities as transportation bases, redeveloping a safe and comfortable urban environment, and at the same time, we are strengthening urban functions such as commerce, business and culture.
In District A, in the West Exit Station area (approximately 2.8ha), the Kami-Ooka Station West Exit District Type 1 Urban Redevelopment Project (enforcement: Yokohama City) and the Kamiooka Ekimae District Type 1 Urban Redevelopment Project (enforce: Keihin Kyuko Electric Railway Co., Ltd.).
In these redevelopment projects, we will improve the station building and redevelop surrounding roads and bus terminals, etc., as well as office towers and Konan Ward Residents' Cultural Center (Himawari Township), Keikyu Department Stores and specialty stores was completed in 1997.
In addition, as a related business, we made a three-dimensional railroad crossings by elevated Keihinkyuko Line.
[To Yumeooka's homepage] (External Site)
Kami-Ooka Station West Exit District Type 1 Urban Redevelopment Project (completed)
Business Name | Type 1 Urban Redevelopment Project in West Exit, Kami-Ooka Station | |
---|---|---|
Enforcer | Yokohama-shi | |
Operating area | Approx. 1.5ha | |
Effective period | Fiscal 2003 through 2008 | |
City planning decision | March 17, 1989 | |
Business plan decision | May 25, 1991 | |
Rights conversion plan Authorization | June 25, 1992 | |
Announcement of completion | March 14, 1997 | |
Number of rights holders | 120 people | |
Public facilities, etc. | 3/3/5 Yokohama Kamakura Line (widened from 22 to 26m) 3/5/19 Kamiooka Line (widened from 9 to 15m) City Road Kamiooka Route 1 (widened from 4 to 8m) Bus terminal (approximately 0.5 ha) | |
Ghost Installation Construction Construction Goods | Total floor area | Approx. 108,600 square meters |
Main applications | Commercial, business, cultural facilities, parking lots, etc. | |
Number of floors | 3rd basement floor, 26th floors above ground (some 10th and 9th floors) |
Kamiooka Station Area Type 1 Urban Redevelopment Project (completed)
Business Name | Kamiooka Station Area First Class Urban Redevelopment Project | |
---|---|---|
Enforcer | Keikyu Corporation | |
Operating area | Approx. 1.3ha | |
Effective period | Fiscal 2003 through 2008 | |
City planning decision | July 25, 1989 | |
Business plan decision | May 24, 1991 | |
Rights conversion plan Authorization | August 10, 1992 | |
Announcement of completion | March 14, 1997 | |
Number of rights holders | 15 people | |
Public facilities, etc. | City Road Kamiooka Route 1 (widened from 4 to 8m) City Road Kamiooka Route 2 (widened from 4 to 8m) Taxi Terminal (approximately 0.1ha) Station building improvement | |
Ghost Installation Construction Construction Goods | Total floor area | Approx. 72,700 square meters |
Main applications | Commercial, station building, parking lot, etc. | |
Number of floors | 2nd basement floor, 11 floors above ground |
On the west side of the Kamakura Highway, the “Kamiooka B District Type 1 Urban Redevelopment Project” was implemented by the union in District B (0.8ha), and the surrounding roads and pedestrian decks will be maintained, as well as commerce, business, housing, and nursery schools. Redevelopment building with was completed in 2003.
Kamiooka B District Type 1 Urban Redevelopment Project (completed)
Business Name | Kamiooka B District First Class Urban Redevelopment Project | |
---|---|---|
Enforcer | Urban Redevelopment Association | |
Operating area | Approx. 0.8ha | |
Effective period | Fiscal 1997 through FY16 | |
City planning decision | April 4, 1997 | |
Business plan decision | April 27, 1998 (authorization of union establishment) | |
Rights conversion plan Authorization | February 18, 2000 | |
Announcement of completion | December 3, 2003 | |
Number of rights holders | 136 people | |
Public facilities, etc. | 3/3/5 Yokohama Kamakura Line (widened from 26m to 30m) City Road Kamiooka No. 588 (widened from 2 to 6.5m) City Road Kamiooka No. 590 (widened from 7 to 9m) 3D crossing facility (width 4m, length: 40m) | |
Ghost Installation Construction Construction Goods | Total floor area | Approx. 59,500 square meters |
Main applications | Commercial, business, housing, nursery school, parking lot | |
Number of floors | 2nd basement floor, 30 floors above ground |
In the C south district (approximately 1.6ha), the “Kamiooka C South District Type 1 Urban Redevelopment Project” was implemented by the union, widening the surrounding roads, as well as commercial, movie theaters, houses, and municipal bicycle parking lots The redevelopment building with parking lots was completed in 2010.
Kamiooka C South District Type 1 Urban Redevelopment Project (completed)
Business Name | Kamiooka C South District Type 1 Urban Redevelopment Project | |
---|---|---|
Enforcer | Urban Redevelopment Association | |
Operating area | Approx. 1.6 ha | |
Effective period | FY17 to FY23 | |
City planning decision | March 4, 2005 | |
Business plan decision | February 14, 2006 (Approval of the Association) | |
Rights conversion plan Authorization | November 2, 2006 | |
Announcement of completion | February 26, 2010 | |
Number of rights holders | 36 people | |
Public facilities, etc. | 3/3/5 Yokohama Kamakura Line (widened from 26 to 30m) City Road Kamiooka No. 345 (widened from 7 to 9m) City Road Kamiooka No. 526 (widened from 5 to 15m) | |
Ghost Installation Construction Construction Goods | Total floor area | Approx. 97,000 square meters |
Main applications | Commercial, business, housing, public bicycle parking lots, parking lot, etc. | |
Number of floors | 2nd basement floor, 33 floors above ground (low-rise 6th floor) |
The Urban Redevelopment Preparatory Union was established in June 2012, and studies are being conducted for city planning procedures.
Click here for information on environmental impact assessment procedures
The Kamiooka Master Plan Association, a community-building organization led by local residents of the district, including the local Neighborhood Associations and Store Association, was established around 18 ha around the station to guide the creation of a city where each area around the station functions together. We have created a master plan "Kamiooka Fukutoshin Master Plan" for district maintenance, and operate in conjunction with "Kami-Ooka Station Area Community Development Consultation".
- ・ District Planning System
- 1, Kamiookanishi
- Kamiooka C South Redevelopment Promotion Area
- ・ Town planning consultation district system
- Kami-Ooka Station Area
(The plan may be reviewed depending on the progress of the business.)
For inquiries to this page
Urban Development Division, Urban Development Bureau Urban Development Department
Phone: 045-671-4009
Phone: 045-671-4009
Fax: 045-664-7694
Email address: tb-seibisuishin@city.yokohama.jp
Page ID: 802-689-929