Menu

Close

  1. Yokohama-shi Top Page
  2. Lifestyle and procedures
  3. Community Development and Environment
  4. Global Warming Countermeasures
  5. Various initiatives
  6. Subsidiary business
  7. Information on charging equipment installation cost subsidies for Yokohama electric vehicles

Here's the text.

Information on charging equipment installation cost subsidies for Yokohama electric vehicles

Last Updated March 23, 2024

In order to promote the spread of next-generation vehicles such as electric vehicles and plug-in hybrid vehicles, Yokohama City will provide assistance to charging facilities (hereinafter referred to as "EV charging facilities for EVs") to be installed in apartment.
Subsidies are not available when installing ordinary charging equipment in a detached house.

Reception of charging equipment setting costs subsidy such as Yokohama-shi electric vehicles was finished in 2023.

Application period

From Thursday, June 22, 2023 to Friday, March 8, 2024
※It is necessary to submit a grant application and a performance report by Friday, March 22, 2024. In addition, application from offer start to Wednesday, June 28 is considered to have been on the same day.
※If the supplementary budget (10,600,000 yen) is reached, the reception will be closed before the deadline. The budget includes the Yokohama City V2H charging and discharging equipment installation costs.

Person who can receive assistance

※Whenever possible, please apply after receiving a decision to grant the Ministry of Economy, Trade and Industry subsidy.

(1) Those who own Residential Association and apartment of apartment
(2) With the permission of (1), install equipment to be subsidized and lease company, car sharing company, etc.

Equipment to be subsidized

Subsidy upper limit

One-half of the amount excluding the Ministry of Economy, Trade and Industry subsidy and the Kanagawa Prefecture subsidy from the subsidized expenses.
However, the upper limit is five units per apartment, and the maximum amount per unit shall be the amount stated in (1) and (2).
(1) Normal charging equipment, charging outlet stand, charging outlets (in mechanical parking lot)
   The maximum amount of 150,000 yen per unit 
(2) Charging outlet (plained flat)
   Up to 80,000 yen per unit 

Advance application using the electronic application system (finished)

Enter required items from the following URL and upload the required materials.
In addition, when person except person targeted for assistance applies on behalf of person, making and upload of power of attorney (the seventh style) is necessary. Please check required documents carefully before proceeding.
[Click here for advance application] (Reception has been closed.)
※In order to apply, you need to create an account for the electronic application system. If you are entrusted with the procedure by the person eligible for assistance, please apply with the account of the company.

Grant application and performance report

After prior application using the electronic application system, please submit the required documents attached application form and submit it by mail.

Submission address

〒231-0005
6-50-10, Honcho, Naka-ku, Yokohama-shi 23rd floor
City of Yokohama, Environmental Planning Bureau Environmental Energy Division

Documents required for advance application, grant application, etc.

Please refer to the application form for the required documents.

Various styles

Various styles
Document nameForm number

Style 

Example of entry
Charging equipment installation cost subsidy grant application for Yokohama electric vehicles etc. and results report

No. 1

WORD (word: 44KB)

No. 1 (PDF: 185KB)

Electronic application system for granting subsidies for installation costs for electric vehicles in Yokohama City registration formNo. 2

WORD (word: 32KB)

No. 2 (PDF: 92KB)

Payment of charging facilities for electric vehicles in Yokohama City registration form

No. 4

WORD (word: 33KB)

Report on charging equipment installation costs for Yokohama City electric vehiclesNo. 5

WORD (word: 33KB)

Charging equipment installation cost subsidy grant bill for Yokohama-shi electric vehiclesNo. 6

WORD (word: 36KB)

No. 6 (PDF: 142KB)
Power of Attorney

No.7

WORD (word: 34KB)

No. 7 (PDF: 140KB)

Property disposal approval application pertaining to charging equipment installation costs subsidies for Yokohama City electric vehiclesNo. 8

WORD (word: 34KB)

Property disposal completion report pertaining to subsidy for charging equipment installation costs for Yokohama City electric vehiclesNo. 10

WORD (word: 33KB)

Subsidized business content changeregistration formNo. 12

WORD (word: 33KB)

Outline

Request for priority order to city companies
Request for priority order to city companies

In Yokohama City, when ordering goods and construction, we strive to give priority to city companies (companies with main sales offices in Yokohama City) based on the basic policy of revitalizing the Yokohama economy and fostering city companies. I am.
Regarding ordering charging equipment, we hope that you understand this purpose and use city companies as much as possible.

About construction
Requests to everyone who installs charging equipment

When we perform construction such as dismantling of building, notice of result of prior investigation of asbestos (specific dust) is necessary.
For more information, please refer to the following page.
Procedures related to registration form (specified construction subject to notification)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Environmental Energy Division, Environmental Planning Bureau Environmental Conservation Department

Phone: 045-671-4225

Phone: 045-671-4225

Fax: 045-550-3925

Email address: ks-hojo@city.yokohama.jp

Return to the previous page

Page ID: 772-164-070

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews