Menu

Close

Here's the text.

A new fishway in Katabira River!

Last Updated September 11, 2018

Ayu is now able to go up upstream!

In order to improve the upstream environment for ayu and other fish in Katabira River, a fishway was installed at the head of Tsurumine Hashimoto-ryu (completed in June 2017).
As a result, Ayu, which had been stagnant downstream of the head, due to a drop of about 1.5m before installation, can now be confirmed even upstream of the head work.

※What is the difference?
The head work (floor stopper, floor fixing, protective work) is a structure that prevents river scouring and maintaining the longitudinal and cross-sectional shape of the river.
Due to the head, the slope of the river is gentle, and the rapid flow during the flood is eased. Many rivers managed by Yokohama City have steep slopes, so in many cases, head works are set up to prevent river scouring.

Fishway

Guide map

Retrospective survey

Inquiry about fishwaysFor more information, please contact the "River Planning Division".
River Planning Division: 045-671-2869
Action PlanAyu goes up Katabira River Action Plan
Click here for materials (PDF: 6,516KB)
Action Plan
(Summary Version)
Katabira River Action Plan (Summary Version)
Click here for materials (PDF: 1,379KB)

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Sewerage River Bureau River Department Planning Division

Phone: 045-671-4215

Phone: 045-671-4215

Fax: 045-651-0715

Email address: gk-kasenkikaku@city.yokohama.lg.jp

Return to the previous page

Page ID: 201-856-385

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews