Menu

Close

Here's the text.

66.Post-Survey results report on the Sotetsu and JR direct lines (Part 9 during construction)

Last Updated July 5, 2019

Post-Survey Results Report (Part 9 during construction)

Please see the following PDF file for the Sotetsu / JR direct line post-survey report (9 during construction).
In addition, texts, photographs, figures, etc. in PDF files are subject to copyright.
Unless permitted by copyright law, such as "reproduction for personal use" or "quotation", copying or diverting without permission is prohibited.

Main part

  • CHAPTER 1 Business Plan
  • Chapter 2 Items of post-survey on Target Projects 
  • Chapter 3 Results of Ex-post Investigation
    • 3.1 Progress of construction and post-survey
    • 3.2 Outline of ex-post survey results
    • 3.3 Results of ex-post investigation
      • 3.3.1 Waste and generated soil
  • Chapter 4 Implementation Status of Environmental Conservation Measures
  • Chapter 5 Summary and Discussions

Procedure Status

Please refer to “66. Sotetsu-JR Direct Line Environmental Impact Assessment Procedure” for the status of procedures for this project.

In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
Get Adobe Acrobat Reader DCTo download Adobe Acrobat Reader DC

For inquiries to this page

Environmental Conservation Department, Green Environment Bureau Environmental Conservation Department

Phone: 045-671-2495

Phone: 045-671-2495

Fax: 045-663-7831

Email address: mk-eikyohyoka@city.yokohama.lg.jp

Return to the previous page

Page ID: 498-499-315

Menu

  • LINE
  • Twitter
  • Facebook
  • Instagram
  • YouTube
  • SmartNews