- Yokohama-shi Top Page
- Lifestyle and procedures
- Community Development and Environment
- Environmental Conservation
- Environmental Conservation Initiatives
- Environmental Assess
- Business in Yokohama City
- 66.Procedure for Environmental Impact Assessment Procedures for Sotetsu/JR Direct Line
- 66.Post-Survey results report on the Sotetsu/JR direct line (No. 8 during construction)
Here's the text.
66.Post-Survey results report on the Sotetsu/JR direct line (No. 8 during construction)
Last Updated March 13, 2019
Please see the following PDF file for the post-survey report on the Sotetsu-JR direct line (part 8 during construction).
In addition, texts, photographs, figures, etc. in PDF files are subject to copyright.
Unless permitted by copyright law, such as "reproduction for personal use" or "quotation", copying or diverting without permission is prohibited.
Post-Survey results report on the Sotetsu-JR Direct Line (No. 8 during construction) (PDF: 8,132KB)
- CHAPTER 1 Business Plan
- Chapter 2 Items of post-survey on Target Projects
- Chapter 3 Results of Ex-post Investigation
- 3.1 Progress of construction and post-survey
- 3.2 Outline of ex-post survey results
- 3.3 Results of ex-post investigation
- 3.3.1 Land subsidence
- 3.3.2 Water elephant (underground water level and spring water flow rate)
- 3.3.3 Waste and generated soil
- Chapter 4 Implementation Status of Environmental Conservation Measures
Procedure Status
Please refer to “66. Sotetsu-JR Direct Line Environmental Impact Assessment Procedure” for the status of procedures for this project.
In order to open PDF files, you may need a separate PDF reader.
If you do not have it, you can download it free of charge from Adobe.
To download Adobe Acrobat Reader DC
For inquiries to this page
Environmental Conservation Department, Green Environment Bureau Environmental Conservation Department
Phone: 045-671-2495
Phone: 045-671-2495
Fax: 045-663-7831
Email address: mk-eikyohyoka@city.yokohama.lg.jp
Page ID: 824-397-940